




版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、木偶奇遇記閱讀測試題二年級名著閱讀試題 一、選擇1、木偶奇遇記的作者卡洛. 科洛迪是哪個國家的 ,( ) A 、意大利 B 、丹麥 TOC o 1-5 h z 2、匹諾曹的爸爸是( ) 。A、櫻桃師傅B、杰佩托3、故事里的蟋蟀會不會說話,( )A、會B、不會4、杰佩托為了給匹諾曹買識字課本,賣掉了 ( ) 。 A 、短上衣B 、褲子5、木偶戲班的班主的名字叫( ) 。A、吃火人B、櫻桃師傅6、騙匹諾曹金幣的是狐貍和( ) 。A、蟋蟀B、貓7、故事里的仙女的頭發顏色是( ) 。A、藍色B、黃色8、匹諾曹要在鍋里被油炸的時候, ( ) 救了他 , A 、狗 B 、貓9、匹諾曹和 ( ) 一起去了“
2、娛樂國”。 A 、小燈芯 B 、小蠟燭10、匹諾曹有一次長出了() 耳朵。A、驢B、豬11、杰佩羅在鯊魚肚子里是靠 ( ) 生存下來的。 A 游進來的魚蝦B 沉船上的食物 to achieve high quality project. 5. instrument installationconstruction alternatives 5.1 5.1.1 the instrument construction methodsGeneral requirements 5.1.1.1 to ensure smooth instrument construction, instrument te
3、chnician prior to construction workers, have a thorough check, calculate construction materials and technology to give the lowdown the construction workers. 5.1.1.2 closely linked to pipeline construction of the instrument unit, with the active cooperation, so as to avoid the instrument device is no
4、t properly installed and rework and, if necessary, corresponding with the related technical or construction plan key single equipment prior to commissioning, shall report the test application by party representatives, representatives of the management company and the factory specialists is confirmed
5、, in order to perform.strictly quality inspection system, each process was finished, filled in by the workers, technicians and construction qualityinspection requests, advance written notice to the management company site engineer and QC personnel, make conclusions on construction quality in the fut
6、ure, quality form a basis of the project when completed.strictly professional transfer of process quality inspection system, handling written delivery list. The transfer of professional process, must be fully installed quality inspection processes installed on disqualification, shall not be carried
7、out the next working procedure operation; important instrumentation engineering processes must inform the management company engineers check and a written record. 5.1.1.5 strictly abide by the national regulation and construction site safety regulations to ensure12、農民在匹諾曹的脖子上套上了 ( ) ,讓他來守夜。 A 草繩子 B
8、狗項圈13、匹諾曹在傻人國因為 ( ) 終于被放出了監牢。 A 皇帝打了勝仗B 抓住了騙子 14 、為了進木偶大戲院看戲,匹諾曹用 ( ) 換了四個子兒買了戲票。 A 花紙外 套 B 識字課本為什么大家叫老木匠是櫻桃師傅( )A(他喜歡吃櫻桃B(他的鼻尖像熟透了的櫻桃為什么大家叫杰佩托是“老玉米糊” ( ) A( 他長得像“老玉米糊”B(他那頭黃色短發像玉米糊杰佩托為什么被警察送到監獄去 ( )A(他偷了東西B(他對匹諾曹兇匹諾曹在離開家的過程中,誰批評他不聽話,會倒霉的 ( A ) A( 蟋蟀 B( 蒼 蠅杰佩托用什么給匹諾曹做了一套衣服( ) A( 樹皮 B( 花紙杰佩托是用什么換了錢給匹
9、諾曹買了識字課本 ( ) A( 自己做的木頭家具B(短上衣匹諾曹賣掉了自己的識字課本干什么 ( )A(買東西吃B(去看木偶戲木偶戲班班主叫什么 ( )A(安東尼奧B(吃火人to achieve high quality project. 5. instrument installationconstruction alternatives 5.1 5.1.1 the instrument construction methodsGeneral requirements 5.1.1.1 to ensure smooth instrument construction, instrument te
10、chnician prior to construction workers, have a thorough check, calculate construction materials and technology to give the low-down the construction workers. 5.1.1.2 closely linked to pipeline construction of the instrument unit, with the active cooperation, so as to avoid the instrument device is n
11、ot properly installed and rework and, if necessary, corresponding with the related technical or construction plan key single equipment prior to commissioning, shall report the test application by party representatives, representatives of the management company and the factory specialists is confirme
12、d, in order to perform. 5.1.1.3 strictly quality inspection system, each process was finished, filled in by the workers, technicians and construction qualityinspection requests, advance written notice to the management company site engineer and QC personnel, make conclusions on construction quality
13、in the future, quality form a basis of the project when completed.5.1.1.4 strictly professional transfer of process quality inspection system, handling written delivery list. The transfer of professional process, must be fully installed quality inspection processes installed on disqualification, sha
14、ll not be carried out the next working procedure operation; important instrumentation engineering processes must inform the management company engineers check and a written record. 5.1.1.5 strictly abide by the national regulation and construction site safety regulations to ensure木偶戲班班主送給匹諾曹幾個金幣 ( )
15、 A( 三個 B( 五個匹諾曹上了誰的當,跟他們走了 ( ) A( 貓和老鼠 B( 貓和狐貍是誰從兩個強盜手里解救出了匹諾曹 ( B ) A( 杰佩托B(天藍色頭發的小仙女什么時候匹諾曹的鼻子會長起來( A ) A( 說謊的時候B(生氣的時候匹諾曹跟著貓和狐貍去哪兒種金幣 (B ) A( 森林里B(奇跡寶地里匹諾曹給農民逮住之后,被迫做什么事情( ) A( 打掃衛生 B( 看守雞舍匹諾曹為什么答應仙女要學好,要讀書 ( B ) A( 他想讓仙女做他的媽媽 B(他要做一個真正的好孩子警察放出來的追匹諾曹的猛犬名字叫什么 ( B ) A( 彼特 B( 阿利德羅 31. 漁夫捉到了匹諾曹,想對他怎么
16、樣( ) A( 放走他B 放在鍋里油炸匹諾曹跟著朋友小燈芯上哪兒去了( ) A( 游戲廳B( 娛樂國to achieve high quality project. 5. instrument installationconstruction alternatives 5.1 5.1.1 the instrument construction methods General requirements 5.1.1.1 to ensure smooth instrument construction, instrument technician prior to construction work
17、ers, have a thorough check, calculate construction materials and technology to give the lowdown the construction workers. 5.1.1.2 closely linked to pipeline construction of the instrument unit, with the active cooperation, so as to avoid the instrument device is not properly installed and rework and
18、, if necessary, corresponding with the related technical or construction plan key single equipment prior to commissioning, shall report the test application by party representatives, representatives of the management company and the factory specialists is confirmed, in order to perform.strictly qual
19、ity inspection system, each process was finished, filled in by the workers, technicians and construction qualityinspection requests, advance written notice to the management companysite engineer and QC personnel, make conclusions on construction qualityin the future, quality form a basis of the proj
20、ect when completed.strictly professional transfer of process quality inspectionsystem, handling written delivery list. The transfer of professionalprocess, must be fully installed quality inspection processes installedon disqualification, shall not be carried out the next working procedureoperation;
21、 important instrumentation engineering processes must informthe management company engineers check and a written record. 5.1.1.5strictly abide by the national regulation and construction site safetyregulations to ensure匹諾曹玩了五個月后,頭上長出了什么 ( B ) A( 一對兔子耳朵B(一對驢耳朵匹諾曹在鯊魚肚子里找到誰了 ( ) A( 安東尼奧 B( 杰佩托匹諾曹是( ) 做
22、的木偶。A 安東尼奧B 杰佩托匹諾曹深夜出門尋吃的結果是( ) 。 A 閃了一下腰B 燒了兩條腿37. 匹諾曹相信金幣種下后能得到 ( ) 。 A 更多的南瓜B 更多的金幣 38. 匹諾曹為了去看戲賣了 ( ) 。A 一只筆B 識字課本. 匹諾曹因為 ( ) ,鼻子變長了。A 撒謊B 逃走.木偶戲班的班主的名字叫()。A、吃火人B、櫻桃師傅41.騙匹諾曹金 幣的是狐貍和 ( ) 。 A 、蟋蟀B 、貓匹諾曹和 ( ) 一起去了“娛樂國”。A 、小燈芯B 、小蠟燭匹諾曹去猩猩法官那里告騙子的狀,竟被坐了 ( ) 的牢。A、一年B、四個月to achieve high quality projec
23、t. 5. instrument installation construction alternatives 5.1 5.1.1 the instrument construction methods General requirements 5.1.1.1 to ensure smooth instrument construction, instrument technician prior to construction workers, have a thorough check, calculate construction materials and technology to
24、give the lowdown the construction workers. 5.1.1.2 closely linked to pipeline construction of the instrument unit, with the active cooperation, so as to avoid the instrument device is not properly installed and rework and, if necessary, corresponding with the related technical or construction plan k
25、ey single equipment prior to commissioning, shall report the test application by party representatives, representatives of the management company and the factory specialists is confirmed, in order to perform. 5.1.1.3 strictly quality inspection system, each process was finished, filled in by the wor
26、kers, technicians and construction quality inspection requests, advance written notice to the management company site engineer and QC personnel, make conclusions on construction quality in the future, quality form a basis of the project when completed.5.1.1.4 strictly professional transfer of proces
27、s quality inspection system, handling written delivery list. The transfer of professional process, must be fully installed quality inspection processes installedon disqualification, shall not be carried out the next working procedure operation; important instrumentation engineering processes must in
28、formthe management company engineers check and a written record. 5.1.1.5strictly abide by the national regulation and construction site safetyregulations to ensure匹諾曹和他的爸爸從大鯊魚的肚子里逃出來,在海里差點被淹死時,是( )救了他們。A.蟋蟀B.金槍魚45、大伙為什么把安東尼奧師傅叫櫻桃師傅()A、因為安東尼奧的鼻子上有個櫻桃B、因為他的鼻尖紅得發紫,再加上亮光光的,像個大櫻桃。46、大家為什么都把杰佩托叫老玉米糊 ( )A因
29、為他的黃頭發活像玉米糊, 、因為他像老玉米糊47、匹諾曹為什么去看木偶戲去呢( )A因為匹諾曹想看木偶戲B、因為離開學還長所以匹諾曹去看了木偶戲48、為什么班主要把匹諾曹扔進火力里( )A因為把木偶扔進火里可以烤熟一只羊B、因為木偶到戲院來搗亂50、匹諾曹為什么落到了殺人強盜的手里( ) A 、因為匹諾曹不聽蟋蟀的話to achieve high quality project. 5. instrument installationconstruction alternatives 5.1 5.1.1 the instrument construction methodsGeneral req
30、uirements 5.1.1.1 to ensure smooth instrument construction, instrument technician prior to construction workers, have a thoroughcheck, calculate construction materials and technology to give the lowdown the construction workers. 5.1.1.2 closely linked to pipeline construction of the instrument unit,
31、 with the active cooperation, so as to avoid the instrument device is not properly installed and rework and, if necessary, corresponding with the related technical or construction plan key single equipment prior to commissioning, shall report the test application by party representatives, representa
32、tives of the management company and the factory specialists is confirmed, in order to perform.strictly quality inspection system, each process was finished, filled in by the workers, technicians and construction qualityinspection requests, advance written notice to the management company site engine
33、er and QC personnel, make conclusions on construction quality in the future, quality form a basis of the project when completed.strictly professional transfer of process quality inspection system, handling written delivery list. The transfer of professional process, must be fully installed quality i
34、nspection processes installed on disqualification, shall not be carried out the next working procedure operation; important instrumentation engineering processes must inform the management company engineers check and a written record. 5.1.1.5 strictly abide by the national regulation and constructio
35、n site safety regulations to ensureB、他還以為殺人強盜都是爸爸裝的51、第一次匹諾曹說謊長長鼻子后是如何恢復原狀的 ( ) A 、說真話 B 、啄木 鳥啄的52、匹諾曹為什么沒有把藥喝了 ( )A、因為他想吃彈子糖B 、他不喜歡喝苦藥53、匹諾曹的金幣這怎么不見了( )A、被狐貍和貓偷走了 B、匹諾曹丟了54、匹諾曹為什么被農民抓住了( )A匹諾曹把農民的葡萄偷吃了 B、他把雞偷了 55、為什么農民把匹諾曹給放 了( )A、他把雞貂抓住了 B、匹諾曹當了一夜狗56、匹諾曹為什么被警察抓捕()A、因為他的書本被壞同學拿走打匹諾曹,可是打中了一位同學B、因為書本
36、是他的,警察還以為是他打的57、匹諾曹是怎么逃出漁夫的手里( ) to achieve high quality project. 5.instrument installation construction alternatives 5.1 5.1.1 theinstrument construction methods General requirements 5.1.1.1 to ensuresmooth instrument construction, instrument technician prior to construction workers, have a thoroug
37、h check, calculate construction materials and technology to give the low-down the construction workers.closely linked to pipeline construction of the instrument unit, with the active cooperation, so as to avoid the instrument device is not properly installed and rework and, if necessary, correspondi
38、ng with the related technical or construction plan key single equipment prior to commissioning, shall report the test application by party representatives, representatives of the management company and the factory specialists is confirmed, in order to perform. 5.1.1.3 strictlyquality inspection syst
39、em, each process was finished, filled in by the workers, technicians and construction quality inspection requests, advance written notice to the management company site engineer and QC personnel, make conclusions on construction quality in the future, quality form a basis of the project when complet
40、ed. 5.1.1.4 strictly professional transfer of process quality inspection system, handling written delivery list. The transfer of professional process, must be fully installed quality inspection processes installed on disqualification, shall not be carried out the next working procedure operation; im
41、portant instrumentation engineering processes must inform the management company engineers check and a written record. 5.1.1.5 strictly abide by the national regulation and construction site safety regulations to ensureA、是阿里德羅救的B、仙女救得58、匹諾曹最后怎樣變成一個真正的孩子()A、匹諾曹給仙女四十個子讓它變成一個真正孩子B、他聽話了59、從匹諾曹的變化中,你明白了我
42、們做人要 ( ) 。 A 謙虛 B 誠實60、匹諾曹深夜出門尋吃的結果是( ) 。 A 、找到一個梨B 被潑了一盆水二、連線 匹諾曹木匠杰佩托美麗善良櫻桃師傅 不愛學習、調皮仙女 狡猾狐貍 “玉米糊” to achieve high quality project. 5. instrumentinstallation construction alternatives 5.1 5.1.1 the instrumentconstruction methods General requirements 5.1.1.1 to ensure smooth instrument construction, instrument technician prior to construction workers, have a thorough check, calculate
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年河北省石家莊市中考歷史試卷(含答案)
- 電動車噴漆培訓課件
- 醋酸鄰氨基對行業深度研究分析報告(2024-2030版)
- 汽車租賃合同
- 2025年中國IPFS分布式存儲行業發展監測及發展趨勢預測報告
- 2025年節能型泵及環保用泵項目投資分析及可行性報告
- 2024-2030年中國成都房地產行業發展監測及發展趨勢預測報告
- 2024年棗莊翼云機場招聘考試真題
- 2024年鎮江市京口區招聘社區工作者筆試真題
- 2025年中國電火鍋行業市場發展監測及投資潛力預測報告
- 血液系統疾病智慧樹知到答案2024年哈爾濱醫科大學附屬第一醫院
- 遼寧省沈陽市沈北新區2024屆小升初考試數學試卷含解析
- 薯蕷皂苷對腫瘤免疫調節的分子靶點探索
- 南京市指導服務企業安全生產工作指引-加油站現場安全重點檢查指引分冊
- AQ/T 2077-2020 頁巖氣井獨立式帶壓作業機起下管柱作業安全技術規范(正式版)
- 儲能項目工具【Excel計算表】用戶側儲能電站投資收益分析表(修正版)
- 2024北京西城區初二(下)期末物理及答案
- 【8物(滬科版)】合肥市第四十五中學2023-2024學年八年級下學期期末物理試題
- 國家開放大學(浙江)地域文化(本)作業1-5
- 福建省龍巖市名校中考數學模擬預測題及答案解析
- 會所會員管理制度
評論
0/150
提交評論