



下載本文檔
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、Body Brackets and ChassisBrackets for Exhaust System 車身和底盤支架排氣系統的支架1 Introduction 1.1 Scope. This General Specification contains the general requirements and associated tests regarding body brackets and chassis brackets for exhaust systems.1 說明 1.1范圍。這個一般規格包括總體要求及有關車身和底盤的排氣系統的相關檢測。1.2 Mission / Them
2、e. The body brackets and chassis brackets serve the purpose of fastening the exhaust system to the underbody.1.2使命/主圖。車體的支架和底盤支架的目的是緊固服務排氣系統的底部。1.3 Classification. Not applicable.Note: Nothing in the specification supersedes applicable laws and regulations.Note: In the event of a conflict between th
3、e German and the English language, the German language shall take precedence.1.3分類。不適用。注意:在規范中沒有可取代法律和法規。注意:在德和英語之間的沖突事件中,德語應優先考慮。2 References2 參考文獻Note: Only the latest approved standards are applicable unless otherwise specified.注意:只有最新批準的標準適用除非另有規定。2.1 External Standards/Specifications. None.2.1外
4、部標準/產品規格。沒有。2.2 GM Group Standards/Specifications.GME 08213吉密08213GME 08215吉密08215GME L-8C-2吉密L-8C-2GMW3059 GMW3059QT 001130 QT間期001130QT 001131 QT間期0011312.2 通用汽車集團標準/規格。吉密08213吉密08215吉密L-8C-2GMW3059QT間期001130QT間期0011312.3 Additional References. Relevant part drawings. 2.3其他參考資料。有關部分圖紙。3 Test Prepa
5、ration and Evaluation 3 測試的制備與評價3.1 Resources. According to the relevant test procedures.3.1資源。據相關的測試程序。 Calibration. The test facilities and equipment shall be in good working order and shall have a valid calibration label.校準。設備和儀器的測試應當處于良好的工作秩序,并且有一個有效的校準標簽。lternatives. Alternative test facilities
6、 and equipment may also be used. However, all measuring variables as specified in this specification shall be determined correctly with respect to its physical definition.替代品。也可以使用替代試驗設施和設備。然而,在本規范中所有測量變量應正確地確定它的物理定義。 Facilities. According to the relevant test procedures.設施。根據有關測試程序。 Equipment. Acco
7、rding to the relevant test procedures.設備。根據有關測試程序。3.2 Test Samples. According to the relevant test procedures.The brackets shall be fastened to the vehicle floorpanel/chassis panel cutout as specified in the partdrawing.3.2 試驗樣品。根據相關的測試程序。支架應固定在車地板面板/機箱面板開孔中規定的部分繪圖。3.3 Conditioning. According to the
8、 relevant test procedures.3.3空調。根據有關測試程序3.4 Documentation. Samples of components or material released to this specification shall be tested for conformity with the requirements of this specification and approved by the responsible GMDepartment prior to the start of delivery of production level compo
9、nents or materials.Any change to the component or material e.g. design, function, properties, manufacturing process and/or location of manufacture requires a new release of the product. It is the sole responsibility of the supplier to provide the customer, unsolicited, with documentation of any chan
10、ge or modification to the product/process, and to apply for a new release.If not otherwise agreed to the entire verification test shall be repeated and documented by the supplier prior to start of delivery of the modified or changed product. In some cases a shorter test can be agreed to between the
11、responsible GM Department and the supplier.3.4公文。本規范材料中組成或釋放樣品的部分應符合性測試的要求與本負責規范和總經理批準署前交貨的生產開始級組件或材料。 任何組件或材料,例如設計變更,功能,性能,制造工藝和/或生產地點需要一個該產品的新版本。這是供應商提供客戶唯一與文件的任何變動或修改,產品/工藝,并申請新的版本的責任,使顧客不請自來,。 如果不是另有約定到整個驗證測試應重復記錄和供應商交付的修改或變更產品。在某些短期測試情況下,可以使通用汽車公司和供應商之間達成協議。 Test Results. The test results shall
12、 be compiled in a test report.3.41測試結果。試驗結果應編制在測試報告。 Deviations from Test Procedure. Deviations from the requirements of the test procedures shall have been agreed upon. Such requirements shall be specified on component drawings, test certificates, reports etc.偏差的試驗程序。偏差的測試程序的要求應當已經商定。這種要求應當被指定在零件圖,
13、測試證書,報告等中。4 Requirements and Test Procedure4 測試程序的要求4.1 Dimensioning. The dimensioning andarrangement of the brackets shall be according to GME 08215.For component and assembly dimensions, see part drawing.4.1標注。應按照吉密08215的尺寸和支架內安排的。對于組件和裝配尺寸,見第一部分繪圖。4.2 Strength Test. See GME L-8C-2. 4.2強度試驗。見吉密L-8
14、C- 2型。4.3 Stress Measurement. See GME 08213.4.3壓力測量。見吉密08213。4.4 Corrosion Test. The corrosion resistance shall be determined according to the material requirements.Requirement: See part drawing 4.4腐蝕試驗。應根據的物質條件確定耐腐蝕性能。要求:見零件圖4.5 Material Testing. 4.5材料測試 Materials. See part drawing.材料。見零件圖。 Testing
15、 of Welded Joints. Pressure welded joints according to QT 001130.Fusion welded joints according to QT 001131. Requirement: The welded joints shall be performed according to QT 001130 and QT 001131 respectively. For additional requirements, see part drawing. 檢驗焊接接頭。根據QT間期001130焊接壓力接頭。根據QT間期001131熔焊接頭。要求:焊接接頭應分別依據QT間和QT 001131 001130。要求看對于額外的零件圖。5 Additio
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 親子餐廳特色餐飲服務與設施租賃合同
- 充電樁項目節能環保技術研發與應用合同
- 2024年度浙江省二級建造師之二建機電工程實務自測模擬預測題庫
- 彩鋼別墅設計、生產、安裝一體化承包合同
- 常州房地產項目投資合同及收益分成協議
- 外派勞務人員出國就業風險分擔合同
- 2025年人教版小學二年級英語(上冊)期末考卷及答案
- 2024-2025學年全國小學一年級下科學人教版模擬考試試卷(含答案解析)
- 湯姆遜眼的發現過程及意義測試題帶答案
- 筆測試題及答案
- 給水排水管網系統智慧樹知到答案章節測試2023年廣州大學
- 2022版義務教育音樂課程標準解讀一PPT
- 近世代數期末考試試卷及答案
- 世界著名童話故事英文繪本故事丑小鴨
- YS/T 739-2010鋁電解質分子比及主要成分的測定X射線熒光光譜法
- GB/T 36478.4-2019物聯網信息交換和共享第4部分:數據接口
- GB/T 26059-2010鈦及鈦合金網板
- GB/T 1690-2010硫化橡膠或熱塑性橡膠耐液體試驗方法
- 印制電路板領域:深南電路企業組織結構及部門職責
- 《士兵突擊》課件
- 年產120萬噸氧化鋁拜爾法生產高壓溶出工藝設計
評論
0/150
提交評論