版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、噴漆質量管理 PAINTS QUALITY CONTROL Prepared by: QSMC SQE Rick Miao Oct 20 2003 revision 01試漆試產漸進消費方案SLR PPAP,SIP,SOP ready送成認量產漸進消費方案SLM)RTS量產噴漆量產前控制流程穩定量產直通率目的量產點檢漆廠線上稽核量產SL-制程不良P-chartSQRC Review試漆報告CPK report調漆及噴漆參數規范PMP,SIP and SOP試產前SL噴漆稽核點檢噴漆周月報-直通率目的-周月質量改善(3up chart and painting monthly reportISS
2、UE異常處置-DELL 5C report-TFC SCAR-LESSON LEARN噴漆質量系統管理噴漆制程管理流程Thickness CPKbuildingColor match CPKbuildingSafety launch building-co-work with paints suppliers try thickness Spec and CPK in.-Trial run units min. 30pcs-Fix the painting parameter. -Painting applicators take care.-Trail run min. 100pcs for
3、 yield rate- Yield rate meet target.-Top 5 issue with FA and CA.-co-work with paints suppliers try Painting color with tints adjustment to in Spec.-Trial run units min. 30pcs.-Fix the painting tints ratio.-Painting suppliers take care.-co-work with paints suppliers try color and Thickness CPK 1.33.-
4、Trial run min. 3 lots(each lots 30pcs)-QSMC SQE involve each CPK reportReview. -All reliability should be passed.Painting Applicators Trail run process flowchartYield ratebuildingCPK Continues Trial Run building-.color and thickness Spec and CPK. in-.reliability testing passed.-.yield rate can suppo
5、rt RTS.Trail run ok-Before RTS 3K trial run safety launch - After RTS 5K MP safety launch.- Safety launch with issue highlight. with FA and CA per day.試漆PROCSS流程Spec. PMP creationSafety launch building-Color chip-PDS and Cosmetic & testing Spec.-Painting ratio viscosity Spec.-Trail run min. 100pcs f
6、or yield rate- Yield rate meet target.-Top 5 issue with FA and CA.-Based on trail run result create PMP.-Painting ratio and viscosity parameter.-FAI and IPQC check items.-Flash time & oven temp. and time.-Painting parameter.-Reliability testing and color & film building.-Co-work with TFC IQC to crea
7、te SOP and SIP-Customer Spec. and QC and process key point. Painting Applicators Trail run system flowchartYield ratebuildingSIP and SOP creation-.color and thickness Spec and CPK. in-.reliability testing passed.-.yield rate can support RTS.Trail run ok-Before RTS 3K trial run safety launch - After
8、RTS 5K MP safety launch.- Safety launch with issue highlight. with FA and CA per day.試漆SYSTEM流程Supplier Paint Safe Launch StatusExample of Reporting formatCorrective Action Tracking LogExample of Reporting formatPainting PMP -The FPY targets are defined for each process and stages:-SLR (Safe Launch
9、Ramp) since system pilot build Mass production Build stageSLR(Qty:3K)Mass production(Qty:5K)Forming process Injection 95.00%96 .00%Pressing 85.50%90.00%Die-casting Al/Zn/Mg90%/90%/79%95%/95%/87%Painting process Painting-plastic86.00% for one pass88.00%for one passPainting-Metal/Mg 78.90%/75% for one
10、 pass83.00%/83% for one passSub-assy process Sub-assy(incl. Heat staking, gluing, etc.)96.00%98.00%2nd Tier Supplier Quality Gate of New ToolingSafety launch quality goal噴漆測試工程SPCE噴漆量產前點檢表Painting CPK report涂裝試作參數記錄試漆報告Dell 2K Monocoat with two applicationsOperation Guide PlasticPretreatment2k Monoc
11、oatDFT 10-15umBaking(30 mins60C)Baking(30 mins60C)PackingflashFlash All information is given in good faith but users must satisfy themselves that there are no circumstances requiring additional information or precautions or the verification of details given EH10/022k MonocoatDFT 10-15umInspectDefect
12、YesNoYes#No2000grit sandingInspectDefect#This step is only allowed one time. If part is still defective after passing through the second application station twice, the part must be scrapped.Total DFT will range from 20-45 microns.Paints process flowchartDell 2K Monocoat with one ApplicationOperation
13、 Guide PlasticPretreatmentWith Mineral Spirits2K MonocoatDFT 20-30umBaking(30mins60C) Substrate Temp. flash All information is given in good faith but users must satisfy themselves that there are no circumstances requiring additional information or precautions or the verification of details given EH
14、10/02Scuff SandingWith 2000gritCleanNOYesInspectDefectPackageNo more than 1 time rework;Total DFT 20-60 microns; Dell need to confirm total DFT. 4. The process will be modified based on line condition.3-5minsAmbientCool Down2 Hrs later4-48hrs laterXPM60360S:XPH80002:M850-59572=4:1:1Viscosity: 1218 S
15、econds NK2#Issue #: Issue Title: Date: Description: Champion: Containment: Root Cause: Corrective Action: Preventive Action: Verification: described sheet- CharacterizeContainCauseCorrective ActionClosureBlank form example Green = Completed Yellow = Currently Working Red = Future Work 5C reportBlank form example3-up ChartBlank form example3-up Chart柏拉圖月報也應填寫妥當並指出哪些問題點尚未解決. 這樣的方式將有助於確立方向使行動有所進展.3-up chartBl
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 廣東初升高期末數學試卷
- 2025年河北石家莊市中醫醫院公開招聘藥劑師6名筆試歷年專業考點(難、易錯點)附帶答案詳解
- 2025至2030城市交通控制行業市場深度研究及發展前景投資可行性分析報告
- 甘肅公務員行測(A類)真題及答案
- 北京腫瘤醫院社會人員招聘考試真題2024
- 2025至2030草本化妝品行業市場深度研究與戰略咨詢分析報告
- 2025至2030采礦采石行業市場占有率及投資前景評估規劃報告
- 福清市蓮峰小學數學試卷
- 二年級設計數學試卷
- 廣東河源小升初數學試卷
- 沉淀法白炭黑的性能與運用課件
- 勝任力調查問卷
- 李善友顛覆式創新課件
- 商業租戶招商營運一戶一檔移交資料清單
- 分包單位過程施工進度款審批表
- 電白局設備采購4開標過程評標報告
- 比和比例綜合練習題及答案-
- 小學古詩詞大賽-九宮格練習課件
- 醫院(診所)門診病人登記簿表格模板
- 淺析如何提高高職院校行政管理效率2100字
- 上海電動汽車充電設施建設管理暫行規定
評論
0/150
提交評論