



下載本文檔
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、Installation guidePurpose of this guideThis guide contains information regarding the installation and safe handling of solar street lights. All instruction should be read and understood before attempting to install. If there are any questions, please contact our sales department for further explanat
2、ion. The installer should conform to all the safety precautions in the guide when and installing the lamps. Local codes should also be followed in such installation.Before installing the solar street light, the installer should become familiar with the mechanical and electrical requirement for such
3、a system. Keep this guide in a safe placefor future reference (care and maintenance) and in case of sale or disposal of all the solar street lightsGeneralThe solar street lamp installation is different from traditional one especially for solar paneland battery. The installationand constructionproced
4、ureis as below: locationselected,cementbasepouring,preparationin field(batteryplacing,solarpanelandbracketconnection), post assembling (threading, light installation, panels and brackets mounting),pole lifting, battery connection, controller fixed, post location re-checked, and final inspection.1. L
5、ocation selected.Field survey. Make sure no shelter around and enough lifted space (no high-tension cable surrounding).According to street lamp road installation standard and requirement, there are three decoration methods for fixing post. Unilateral, bilateral cross and bilateral symmetry three kin
6、ds. Post height are based on effective road width and decoration method, and separation distance are about the height and light illuminate angle (General is three timesof height)2.cement base pouring:(1). Embedded part dimension.Accordingto factoryprovidinginformationand our actual demand,we suggest
7、postheight and embedded items dimension as below:dimensionEmbedded partsScrewNo.Height ( m )( L*W*H ) mmdiagonal dimensionSignNotes( mm )Model14400400800220M182465005001000280M203686006001400360M2448128008001500400M285(2).Digging hole.According to embedded parts dimension to ensure hole size, especi
8、ally reserve enough place for battery. Details as below:(3). Cement base pouring.Use C20 standardconcreteto pour , andtamp cementbase heavily with bobbingmachine. When pouring,do not make concrete splash whereon screw rod to slow downinstallation. When threading PVC pipe, take as the drawing require
9、ments to make sure noconcrete inside. Noticethere is250mm gap between downpipe terminal to flat surface.Finally make sure the surface ishorizontal witha tester toensure four feet in the samelevel.Preparation :As the installation requirements, prepare all the necessary tools and list themTransport an
10、d carry all the components listed, and check the quantity and models one by one.Installation :1. Battery installation.Before operation, make sure battery models are the same as configuration listed (if a group, make sure connection method first. If in parallel, should not be over 4 pcs). Connect eac
11、h terminal firmly and place them in battery cabinet. Seal the cabinet well with screws to avoid water seepage. Next put the cabinet in the hole and cover or bury it. What doing it, choose a fine day. After burying finish, check the voltage whether normal or not.2. Mounting solar panel.Fix the panel
12、into the bracket firmly with screws and connect as the requirement(inseries or parallel).Afterconnection,make a test for the output voltage whether meet theinstallation. In general, the tested voltage should not lower than 18V in 12V system. If 24Vsystem, the voltage not lower than 36V.3. Post assem
13、blingCheck the installation position and direction. Confirm the length of wires stripping required. Each terminal should be peeled out 150mm in general. And then install lamp and check the position and levelness based on post. After wire connection, notice the positiveandnegativepolesand inspectterm
14、inalswhetherfixedhard.All thesedone shouldaccording to the drawing picture.After finish lamp installation, use a multimeter to test the resistance and check there in no ground connection with the pole body. And then connect the battery to do light test.4. Lifting.Before lifting, prepare all the nece
15、ssary tools, such as spray paint, Rohan pull, hammer, allen, screws and etc and clean the cement base. When lift the pole up to 1m high, .adjust direction of solar panel and fix it. Do make sure the direction face the south. Meanwhile, spray paint if possible.In the process of lifting, notice the sp
16、eed and direction,meantime, people should helppole up. Slowly drop the pole and give a right order to the hoist man. Keep screws symmetrical when tighten and use the Strength stem when fix M24 and above screws. The stem should not be less than 1.2m. Four feet should stand balance and upright.5. Cont
17、roller installation.Operate as the manual instruction, battery connection first, load (light) second (light on or not, if on, check and change new one), solar panel last (observe light status. if off is normal. Some kinds have delayed function, off delayed for 3-5minutes is normal). When operation all these, do not mis-connect positive and negative terminals so as not to shock or destroy circuit. Close inspection window well.6.Post location re-checked.Finish above operations,re-check the post balance and stand level. Meantime, doantiseptic treatment
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 省委創新團隊管理辦法
- 筆跡鑒定收費管理辦法
- 禽畜洗消中心管理辦法
- 規劃倉儲用地管理辦法
- 管理人員變更管理辦法
- 證券賬戶業務管理辦法
- 家具員工輪班管理辦法
- 中國鏟運機行業發展監測及投資戰略規劃研究報告
- 寧德石英玻璃制品項目可行性研究報告
- 2025年中國商用清洗水槽行業市場深度研究及發展趨勢預測報告
- 立責于心履責于行全面落實企業安全生產主體責任課件
- 建筑工程模板施工工藝技術要點講義豐富課件
- 醫療垃圾廢物處理課件
- 位置度公差以及其計算
- DBJ03-107-2019 房屋建筑和市政工程施工危險性較大的分部分項工程安全管理規范
- 氯化銨危險化學品安全周知卡
- 《煤的發熱量測定方法》ppt課件
- 三寶、四口、五臨邊安全培訓PPT課件
- 護理崗位管理與績效考核-PPT課件
- 李墨林按摩療法(李墨林)237頁
- 幕墻施工安全技術交底
評論
0/150
提交評論