




版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、SY5000/CMU-BATS Auto Switch controllerUser ManualV1.1CONTENTS1.FEATURES2.2.CONTROLLER EXTERIOR FIGURE3.3.PARAMETER RANGE AND DEFINE3.4.OPERATION4.4-1KEY FUNCTION4-2SETTING PARAMETER4-3MANUAL OPERATION4-4AUTOMATIC OPERATION5.FACTORY DEFAULTSPARAMETER5.6.INSTALLATION5.7.TYPICAL WIRING DIAGRAM6.8.SALE
2、SERVICE7.1、FEATURESSY5000/CMU-B double power switching controller is based on micro processor as the core of the new generation of intelligent controller. Real-time monitoring the mains and backup power these two road voltage. Be able to appear lost electricity,over-voltage,undervoltage,phase lack,e
3、tc,abnormal conditions make accurate judgement.And by manual or automatic mode switch ATS switch movement,which realizes automatic and unattended function,etc.n The ATS controller be used LCD digital design,Parameters is Chinese and English display.n The product can accurately acquisition and displa
4、y the main power/second power two way three-phase voltages.n The product parameter settings by password protection.n The ATS controller power supply mode can set mains power priority,backup power priority or no priority.n When a switch off failure,if another voltage to normal,the ATS controller will
5、 automatically switch to the way.n The ATS controller can install voltage alarm value and delay switch time.n The product have generator start function.n The ATS controller can chose single-phase/three-phase display,monitoring.n The product have two way N line separation design.n The ATS controller
6、can autosave fault record,inquires is more conveniently.n The ATS controller can be used DC power(935Vsupply or A/N phase voltage.2、CONTROLLER EXTERIOR FIGURE SY5000CMU-B3、SPECIFICATIONS3.1Power Supply :DC12V (range from 9to 35V ;AC220V (197-270V L-N3.2Generator input Voltage Range :0to220V AC ,3pha
7、se 4wire 3.3Power dissipation :<3VA at rated voltage34Operating Temperature Range :-20to +60Humidity Range :20to 754、OPERATION4-1、controller display properly state as follows: 4-2、SETTINGPARAMETERPress the key 5seconds,enter "password"interface,Input 4digit password,User can only by mon
8、itoring software to modify this password,Ordinary users password:1234Password input method:In the input password interface,Press the key,value add 1,Whenvalues increase to password bits,Pressthe key confirmation,Then interface jump to the second password bits,Repeat the above operation,input the rem
9、aining three password bits,and then enter into "menu",if a password mistake will not have access to menu system. In the menu system,Press thekey into the next page ,Press the key to modification parameter.When the control screen upward modification parameter.Then press key to increase the
10、value,Increased to maximum continuous buttons,then the system automatically return to low cycle.If press key,then exit set condition returns to the system default state.4.3Manual switching operationWhen the user manual debugging ATS switch,Through panel of buttons can be manually switched,each time
11、press the button will switch to correspond to the end.Specific steps: Press thekey will be the key controller is set to "manual"state,If switch to the main source control please press the key,If switch to standby power control please press the key.Note:in key-press,controller has 6seconds
12、countdown switch time,press other switch button is invalid,and if the countdown unfinished.0000 User can also through input password,the system parameters interface to "manual","automatic"Settings4.4Automatic switching set operationwhen the movement User Settings ATS switch autom
13、atically,need through controller internal priority to set up"the mains priority"-"standby power priority"-"no priority".Specific steps:First press thekey to enter the password Settings,enter the correctpassword and press thekey to scroll to"power priority model&quo
14、t;interface,After presskey choose"mains first"or"standby power first"or"no priority"of three modes.If exit system press thekey.5、FACTORY DEFAULTS PARAMETERTepy Factory Reset Set rangemains under voltage200V180V-220Vmains over voltage240V230V-250V200V180V-220VBackup powe
15、r undervoltage240V230V-250VBackup power overvoltageMains time delay normal5S0-60S5S0-60SMains time delayabnormalBackup time delay5S0-60Snormal5S0-60SBackup time delayabnormalGenerator start time0S0-90Sdelay5S0-90SGenerator stop timedelayPrior supply mode mains power priority:mains power priority:bac
16、kup power priority:not priorityStatus Auto:manual:autoSupply display mode Display three phase DisplayDisplay switch time Recover factory set 6S Not recover single-phase/three phase 1-9S :recover :not recover 6、 controller mounted controller mounted: With the product distribution two installation ear
17、s fixed. Overall dimension:140x120x56mm (W X H X D Cut-out for fix dimension: 128x112mm (W X H 7、connection diagram 7-1、 According to SY5000/CMU-B controller of each port after shell that correct connection wiring. SY5000/CMU-Bback diagram 6 7-2、 SY5000/CMU-B controller wiring terminal explain Termi
18、nal A1、B1、C1、N1 Wiring explain Remark Connect mains AC 198V-242V A,B,C,N M1、M2 Connect relay output 16A 250VAC CLOSE 1# L1、L2 Connect AC battle AC 198V-242V line VIN、GND connect DC Controller power plus-minus supply DC 9V-36V M3、M4 Connect relay output 16A 250VAC CLOSE 2# A2、B2、C2、N2 Connect backup power AC 198V-242V A,B,C,N M5、M6 Connect generator 10A 250VAC relay output According to SY5000/CMU-B controller of each port after shell that cor
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 藥品購銷管理管理制度
- 藥品風險放行管理制度
- 藥店復方制劑管理制度
- 藥店藥品售后管理制度
- 螢石監控中心管理制度
- 設備儀器適用管理制度
- 設備固定資產管理制度
- 設備技改創新管理制度
- 設備檢修操作管理制度
- 設備租賃單位管理制度
- 人教版小學四年級下冊體育期末復習計劃
- 老年人攝影知識培訓課件
- 2025石獅市國企招聘考試題目及答案
- GB/T 16262.2-2025信息技術抽象語法記法一(ASN.1)第2部分:信息客體規范
- 豐田公司5s管理制度
- 審核技巧培訓
- 2025-2030中國煤炭行業深度調研及投資前景預測研究報告
- 鐵路施工高空作業安全教育
- TCPSS 1011-2024 直流散熱風扇運行壽命測試方法
- 人防門二次澆筑施工方案
- 湖南長沙四大名校系丘班選拔試題
評論
0/150
提交評論