QC小組薄壁空心墩墩滑模施工外觀質量及垂直度控制_第1頁
QC小組薄壁空心墩墩滑模施工外觀質量及垂直度控制_第2頁
QC小組薄壁空心墩墩滑模施工外觀質量及垂直度控制_第3頁
QC小組薄壁空心墩墩滑模施工外觀質量及垂直度控制_第4頁
QC小組薄壁空心墩墩滑模施工外觀質量及垂直度控制_第5頁
已閱讀5頁,還剩23頁未讀 繼續免費閱讀

下載本文檔

版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領

文檔簡介

1、QC小組薄壁空心墩墩滑模小組薄壁空心墩墩滑模施工外觀質量及垂直度控制施工外觀質量及垂直度控制2022-5-4部 門:QC小組:施工技術小組發表人:日 期:2012年10月21日 QCQC小組薄壁空心墩墩滑模施工小組薄壁空心墩墩滑模施工外觀質量及垂直度控制外觀質量及垂直度控制2022-5-4工程名稱工程名稱施工單位施工單位工程規模工程規模 橋橋全長全長2.9872.987公里公里,為簡支,為簡支4545米預應力混凝土米預應力混凝土T T型梁型梁結構結構,橋面寬,橋面寬11.611.6米米。質量控制質量控制合格合格合同造價合同造價2.12.1億人民幣億人民幣工程說明工程說明1 1、此橋全長此橋全長

2、29872987米米,為簡支,為簡支T T型梁型梁。該橋穿越當地該橋穿越當地MAGLAMAGLA水庫水庫壩區壩區,常年常年有水段為有水段為350350米,水深米,水深2020米左右,米左右,蓄水蓄水期水深期水深3535米左右,樁基直徑米左右,樁基直徑1 1米米,共,共計計789789根,根,樁長樁長4040米和米和4545米兩種。米兩種。2 2、橋臺、橋臺2 2個,承臺個,承臺6666個,薄壁空心墩個,薄壁空心墩6666個,墩高最高為個,墩高最高為43.7943.79米米(4040米以米以上上8 8個),個),20-3520-35米居多,最低為米居多,最低為14.3914.39米米;3 3、預

3、應力混凝土預應力混凝土T T梁共計梁共計268268片,其中片,其中45m45m梁梁212212片片5353跨,跨,40m40m梁梁5252片片1313跨,跨,36m36m梁梁4 4片片1 1跨。跨。4 4、混凝土共計約、混凝土共計約6.86.8萬方,水泥萬方,水泥2800028000噸,鋼筋約噸,鋼筋約1350013500噸,鋼絞線約噸,鋼絞線約(12.7mm12.7mm)11001100噸。噸。5 5、設計、咨詢、設計、咨詢工程師工程師為為NESPAKNESPAK。2022-5-4 液壓滑升模板是一種具有自升設備,液壓滑升模板是一種具有自升設備,能隨砼的澆筑自行向上滑升的模板裝置能隨砼的澆

4、筑自行向上滑升的模板裝置,由模板系統、操作系統和液壓滑升系,由模板系統、操作系統和液壓滑升系統組成,利用液壓千斤頂沿支承桿(支統組成,利用液壓千斤頂沿支承桿(支承桿埋于砼中)向上爬升,帶動整個滑承桿埋于砼中)向上爬升,帶動整個滑模裝置邊澆筑邊上升的一種連續成型的模裝置邊澆筑邊上升的一種連續成型的快速施工方法。滑模施工不用支架,不快速施工方法。滑模施工不用支架,不需周期拆裝,用材省,勞力消耗少,施需周期拆裝,用材省,勞力消耗少,施工進度快,結構整體性好,安全可靠,工進度快,結構整體性好,安全可靠,適用于現場澆筑高聳的鋼砼結構,但模適用于現場澆筑高聳的鋼砼結構,但模板一次性投資較大。板一次性投資較

5、大。2022-5-4(一)小組概況(一)小組概況(三)確定目標值(三)確定目標值(二)現狀調查(二)現狀調查(五)確定主要原因(五)確定主要原因(四)(四)主要主要原因分析原因分析(六)制定對策(六)制定對策(八)鞏固措施(八)鞏固措施(七)效果檢查(七)效果檢查(九)遺留問題及今后打算(九)遺留問題及今后打算2022-5-4小組概況小組概況組建時間組建時間2011.9.151.活動課題:運用活動課題:運用QC方法確保方法確保薄壁空心墩滑模施工質量薄壁空心墩滑模施工質量人人 數數小組小組8人人 平均年齡平均年齡33 歲歲 活動次數活動次數15 次次活動時間活動時間2012.1-2012.10人

6、均接受人均接受QC教教育育160學時學時巴基斯坦橋梁巴基斯坦橋梁項目項目 QC小組小組課題類型課題類型現場型現場型注冊登記注冊登記2022-5-42.人員結構及文化技術素質結構、組內分工人員結構及文化技術素質結構、組內分工 姓名姓名性別性別年齡年齡文化程度文化程度職務(或崗位)職務(或崗位)組內分工組內分工備備 注注男男38大學大學項目經理項目經理組織協調組織協調高級工程師高級工程師男男42大學大學總工程師總工程師技術指導技術指導工程師工程師男男37大學大學施工科長施工科長施工技術施工技術工程師工程師男男37大學大學施工員施工員施工技術施工技術助理工程師助理工程師男男28大學大學測量員測量員現

7、場施工測量現場施工測量助理工程師助理工程師23大專大專施工員施工員施工技術數理記錄施工技術數理記錄技術員技術員男男39大學大學試驗室主任試驗室主任試驗負責試驗負責工程師工程師男男42大專大專設備科長設備科長設備協調設備協調助理工程師助理工程師2022-5-4選題理由選題理由1)薄壁空心墩混凝土外觀質量控制)薄壁空心墩混凝土外觀質量控制 薄壁空心墩液壓滑模施工具有較強的連續性,薄壁空心墩液壓滑模施工具有較強的連續性,施工進度快,施工時對混凝土外觀影響較大。施工進度快,施工時對混凝土外觀影響較大。通過施工觀測外觀質量欠佳,需要采取措施改通過施工觀測外觀質量欠佳,需要采取措施改進砼外觀質量。進砼外觀

8、質量。2)薄壁空心墩混凝土施工平整度及垂直度控)薄壁空心墩混凝土施工平整度及垂直度控制制 薄壁空心墩液壓滑模施工具有一定的專一性,薄壁空心墩液壓滑模施工具有一定的專一性,液壓滑模施工的重點是施工方案的選擇、人員液壓滑模施工的重點是施工方案的選擇、人員的組織培訓及模具的配備。水平及垂直度的控的組織培訓及模具的配備。水平及垂直度的控制及糾偏制及糾偏是滑模工程中的一個難點,也是一個是滑模工程中的一個難點,也是一個質量重點監控項目,由于存在工藝粗疏、管理質量重點監控項目,由于存在工藝粗疏、管理隨意,形成平整度及垂直度超差的的質量問題。隨意,形成平整度及垂直度超差的的質量問題。2012年年8月以前本工程

9、質量狀況月以前本工程質量狀況小組通過查證小組通過查證2012年年8月以前施工月以前施工薄壁墩,調查數據如下:薄壁墩,調查數據如下:本工程已施工的兩個薄壁空心墩合格率本工程已施工的兩個薄壁空心墩合格率表表 調查顯示已施工薄壁空心墩的平整度及調查顯示已施工薄壁空心墩的平整度及垂直度平均合格率為垂直度平均合格率為81%,低于項目要求的低于項目要求的95%。且外觀較差。且外觀較差。分類分類外觀外觀平整度平整度垂直度垂直度27號 差78%79%28號85%82% 平均81% 選定課題選定課題 提高混凝土外觀質量,糾正平整度及垂直度偏差。提高混凝土外觀質量,糾正平整度及垂直度偏差。2022-5-4 二、現

10、狀調查二、現狀調查20122012年年0707月月1010日日1010月月2020日,日,QCQC小組成員對現場施工的第小組成員對現場施工的第2424、2626、2727、2828號薄壁空心墩滑模的外號薄壁空心墩滑模的外觀、平整度及垂直度進行觀測統計,外觀為目測,平整度為觀、平整度及垂直度進行觀測統計,外觀為目測,平整度為2 2米水平尺檢查,米水平尺檢查,垂直度檢查垂直度檢查觀測方法為觀測方法為用精密全站儀觀測模板四角頂點,水準儀配合定標高。結果如下表。因此得出結論是先施工的用精密全站儀觀測模板四角頂點,水準儀配合定標高。結果如下表。因此得出結論是先施工的2727、2828號各項指標明顯差于改

11、正后的號各項指標明顯差于改正后的2424、2626號,為達到要求,需要按號,為達到要求,需要按QCQC小組加強公關,持續改進。小組加強公關,持續改進。點號外觀平整度 垂直度部位垂直度偏差(L/1000)點號外觀平整度 垂直度部位垂直度偏差(L/1000)24較好2L=-0.54.5527較差4L=-0.515.115241L=-0.56.742712L=-0.515.114244L=-0.57.97277L=-0.516.316245L=-0.59.19274L=-0.516.316244L=-0.510.39275L=-0.517.513263L=-0.511.512284L=-0.517.

12、515264L=-0.512.712285L=-0.518.721263L=-0.512.7132813L=-0.518.720264L=-0.513.9132812L=-0.520.017263L=-0.513.9142811L=-0.520.0182022-5-4 目標值目標值要做好過程控制,保證滑模過程薄壁空心墩平整度、垂要做好過程控制,保證滑模過程薄壁空心墩平整度、垂直度不超出允許范圍,即垂直度合格率由活動前的直度不超出允許范圍,即垂直度合格率由活動前的81%81%提高提高到到95%,95%,混凝土外觀大幅改善。見下圖:混凝土外觀大幅改善。見下圖:設定目標設定目標小組活動目標柱狀圖小組

13、活動目標柱狀圖合格率合格率 95% 95% 90% 81% 90% 81% 80% 80% 60% 60% 40% 40% 10% 10% 0 0 QC QC活動前活動前 活動后目標值活動后目標值 100% 100% 2022-5-4目標論證目標論證 本項目部人員質量意識較本項目部人員質量意識較強,技術素質較好,學習積強,技術素質較好,學習積極性較高極性較高 。 本項目部人員團結務實,本項目部人員團結務實,具有不達目的不罷休的敬具有不達目的不罷休的敬業精神,工作熱情高。業精神,工作熱情高。 根據施工組織、工藝及現場施工人員的根據施工組織、工藝及現場施工人員的經驗,要達到預期目標是可以實現的。經

14、驗,要達到預期目標是可以實現的。2022-5-4原因分析原因分析 通過現狀調查及現場觀測,小組于通過現狀調查及現場觀測,小組于20122012年年1010月月7 7日召開小組會議,群策群力,對平日召開小組會議,群策群力,對平整度、垂直度不合格的點位展開充分討論,找出了影響合格率的問題,并繪制了因果整度、垂直度不合格的點位展開充分討論,找出了影響合格率的問題,并繪制了因果分析樹圖。分析樹圖。砼砼外外觀觀差差平平整整度度及及 垂垂 直直度度超超差差人員人員材料材料機具機具方法方法責任心及質量意識差,施工責任心及質量意識差,施工技能不高,技能不高,技術培訓少,未技術培訓少,未進行交底進行交底模板變形

15、老化,支撐桿數量模板變形老化,支撐桿數量不夠。不夠。用于觀測的全站儀需要精準用于觀測的全站儀需要精準校正校正混凝土振搗方法不對,單一混凝土振搗方法不對,單一的振搗一側的振搗一側環境環境操作臺上人員物體等荷載分操作臺上人員物體等荷載分布不均勻布不均勻混凝土澆筑方法不規范,單混凝土澆筑方法不規范,單一的進行一側澆筑一的進行一側澆筑油壓千斤頂質量不合格油壓千斤頂質量不合格高程數據,垂直高程數據,垂直度測量數據失真度測量數據失真單一側受到混凝單一側受到混凝土荷載和外在振土荷載和外在振搗力影響,平臺搗力影響,平臺傾斜傾斜平臺傾斜平臺傾斜模板不平整,每側爬模板不平整,每側爬升不一致,導致操作升不一致,導致

16、操作平臺傾斜平臺傾斜每側爬升不一致,導每側爬升不一致,導致操作平臺傾斜致操作平臺傾斜分析樹圖分析樹圖2022-5-4 要因確認要因確認通過分析樹圖,小組成員對各個影響因素進行了討論,確認要因。通過分析樹圖,小組成員對各個影響因素進行了討論,確認要因。要因確認一:人員要因確認一:人員驗證方法:驗證方法:1.1.查驗現場交底記錄及培訓記錄;查驗現場交底記錄及培訓記錄;2.2.現場隨機抽取操作工人,進行專業知識提問。現場隨機抽取操作工人,進行專業知識提問。驗證結果:驗證結果:1.1.交底記錄及培訓記錄齊全;交底記錄及培訓記錄齊全;2.2.操作工人掌握專業操作理論知識并具有責任心。操作工人掌握專業操作

17、理論知識并具有責任心。結論:非要因結論:非要因要因確認二:材料要因確認二:材料驗證方法:查驗圓鋼質量合格證及復試報告。驗證方法:查驗圓鋼質量合格證及復試報告。驗證結果:有圓鋼質量合格證且均合格。驗證結果:有圓鋼質量合格證且均合格。結論:非要因結論:非要因要因確認三:機具要因確認三:機具驗證方法:驗證方法:1.查驗油壓千斤頂質量合格證;查驗油壓千斤頂質量合格證;2.查驗全站儀、水準儀校驗合格證。查驗全站儀、水準儀校驗合格證。儀器是否儀器是否滿足檢查要求,增加精準儀器進行檢查。滿足檢查要求,增加精準儀器進行檢查。3.目測模板平整度,很差。目測模板平整度,很差。驗證結果:驗證結果:1.有油壓千斤頂質

18、量合格證且合格;有油壓千斤頂質量合格證且合格;2.有合格的儀器校驗有合格的儀器校驗 合格證已過期。合格證已過期。3.需要更換新模板。需要更換新模板。結論:是要因結論:是要因施工人員現場教育培訓施工人員現場教育培訓2022-5-4 要因確認要因確認要因確認四:方法要因確認四:方法驗證方法:驗證方法:1.1.現場查驗操作工人對混凝土澆筑、振搗的合格性和規范性;現場查驗操作工人對混凝土澆筑、振搗的合格性和規范性;2.2.桁架滑模控制點檢查,是否滿足施工要求;抽查模板中線檢查桁架滑模控制點檢查,是否滿足施工要求;抽查模板中線檢查方法及頻率。方法及頻率。驗證結果:驗證結果:1.1.對三個班次的混凝土振搗

19、進行查驗,混凝土振搗均勻、規范;對三個班次的混凝土振搗進行查驗,混凝土振搗均勻、規范;對三個班次的混凝土澆筑方法進行查驗,發現有兩個班次的工人對三個班次的混凝土澆筑方法進行查驗,發現有兩個班次的工人混凝土澆筑的方法不規范,單一的對某一部位和區域澆筑而忽略了混凝土澆筑的方法不規范,單一的對某一部位和區域澆筑而忽略了其他部位,導致垂直度超差;其他部位,導致垂直度超差;2.2.控制點過少,檢查頻率過低,方法單一。控制點過少,檢查頻率過低,方法單一。結論:是要因結論:是要因要因確認五:環境要因確認五:環境驗證方法:現場查驗操作平臺荷載分布情況。驗證方法:現場查驗操作平臺荷載分布情況。驗證結果:驗證結果

20、: 1.1.對三個班次的操作平臺荷載分布情況進行查驗,上部分布振動對三個班次的操作平臺荷載分布情況進行查驗,上部分布振動棒棒4 4臺、電焊機臺、電焊機2 2臺,液壓控制臺臺,液壓控制臺1 1臺及鋼筋等主要設備和材料,且臺及鋼筋等主要設備和材料,且明顯分布于一側。明顯分布于一側。2.2.操作工人共操作工人共1111人分布在同一側進行混凝土澆筑。很明顯,操作臺人分布在同一側進行混凝土澆筑。很明顯,操作臺一側由于荷載比另一側大,導致該側傾斜,澆筑完畢的混凝土筒壁一側由于荷載比另一側大,導致該側傾斜,澆筑完畢的混凝土筒壁垂直度超差。垂直度超差。結論:是要因結論:是要因增加激光對中器檢查增加激光對中器檢

21、查 平整度檢平整度檢查查2022-5-4 制定對策制定對策針對上述要因,通過小組分析討論,制定如下對策:針對上述要因,通過小組分析討論,制定如下對策:序序號號 要要 因因 對對 策策 目目 標標 措措 施施計劃完成時間計劃完成時間地地點點責任人責任人 1 模板老舊,模板老舊,檢查儀器需檢查儀器需校驗及增加校驗及增加新儀器。新儀器。更換新模板,更換新模板,增加一臺激增加一臺激光對中檢查光對中檢查儀。儀。在機具配置在機具配置滿足施工要滿足施工要求和需要。求和需要。根據現場情況,把變形老舊模板全根據現場情況,把變形老舊模板全部更換。購進新儀器,對全站儀進部更換。購進新儀器,對全站儀進行檢查校驗,并配

22、備備用儀器。行檢查校驗,并配備備用儀器。 2012.9.1現現場場 2混凝土澆筑混凝土澆筑方法不規范,方法不規范,控制點過少,控制點過少,檢查頻率過檢查頻率過低,方法單低,方法單一。一。細化施工方細化施工方案并制定專案并制定專項方案。項方案。混凝土澆筑混凝土澆筑規范均勻,規范均勻,且每一澆筑且每一澆筑層的厚度不層的厚度不超出規范要超出規范要求;平整度、求;平整度、垂直度控制垂直度控制在規范內。在規范內。根據現場要求,混凝土澆筑按順序根據現場要求,混凝土澆筑按順序進行,對塌落度砼溫度等指標進行進行,對塌落度砼溫度等指標進行監控,每層澆筑厚度不超過監控,每層澆筑厚度不超過250mm250mm;增加

23、控制點,采用多種方法進行檢增加控制點,采用多種方法進行檢查。查。 2012.9.15 2012.9.15現現場場 3操作臺上人操作臺上人的員、物體的員、物體分布不均勻。分布不均勻。計算操作臺計算操作臺荷載并制定荷載并制定專項方案。專項方案。操作臺上均操作臺上均勻放置設備,勻放置設備,規范流動的規范流動的人員荷載偏人員荷載偏移性。移性。均勻擺放設備,并加長各設備和機均勻擺放設備,并加長各設備和機具的接線,設備不因為使用部位的具的接線,設備不因為使用部位的不同而來回移動,人員專一進行各不同而來回移動,人員專一進行各施工區域工作。施工區域工作。 2012.10.8 2012.10.8現現場場2022

24、-5-4 實施一:細化施工方案并制定專項方案實施一:細化施工方案并制定專項方案在原有滑模施工方案(編制)的基礎上進行細化,編制補充專項施工方案,保證薄壁空心墩施工標準規范在原有滑模施工方案(編制)的基礎上進行細化,編制補充專項施工方案,保證薄壁空心墩施工標準規范。M/s XINJIANG BEIXIN,Road & Bridge Construction Co. Ltd.,House No. 16, Street 25th,F-6/2, Islamabad.Kind Attn.: Mr. Wang Mingjiang, Project Manager.Contract No. HW-R

25、HB-FB-2012-3 dated April 8, 2012.Reference Letter: 3366/037/ZM/A-01/0335 dated Sept. 19, 2012.Subject: DISLOCATION OF TOP OF PIERS AT GRIDS 27 AND 28Sir, The slipforming method of construction is different than conventional formwork system, as the continuous movement of formwork does not allow use o

26、f tie bolts as used in conventional formwork. Higher slump and flowing concrete will allow less vibration in form. The tolerances allowed in slipforming form of construction are also different than conventional formwork construction. The dislocation of top of Pier # 27 & 28 happened due to the f

27、ollowing reasons: 1.The centerline of Pier 28 got disturbed at 1st Diaphragm due to changed made in the slip formwork to accommodate it to allow slipforming beyond 1st Diaphragm. We requested for reestablishing the centerline after the dislocation was not reducing, but were not able to get the centr

28、e line reconfirmed. Thus, the dislocation remained even though we tried to bring it back by moving one side of forms more than the other. In Pier # 27 the centre was reconfirmed before start of slipform after 1st Diaphragm, giving us more control on alignment of slipform. 2.As requested in our Concr

29、eting method and Method Statement for slipform submitted earlier, we required concrete slump greater than 150 mm and flowing concrete for placing the forms. On many occasions we had place concrete that was stiff and slump was below 150 mm, which was also flowed in chutes with great difficulty. The r

30、esult of placing concert of this nature was that, it stiffened quickly in forms i.e. reaching initial setting well before it leaves below the forms. The concrete not being plastic in forms does not allow adjustment in wall dimension as we desire and the difference will remain or increase. Another pr

31、oblem that we faced in Pier #27 was due to concrete not being plastic in forms on one side of Pier while other side remained plastic it stiffened and grabbed the recovery tubes attached to Jacks. This caused the level difference in slipform thus causing the plumbs to go out of centre axis. 3.As ment

32、ioned in point 2 above, the delay in concrete of being received on site after ordering it caused the top layer to stiffen instead of remaining plastic for new layer to be placed over it. This caused adjustment of forms difficult as the concrete in forms was not in plastic stage.對策實施對策實施 The rectific

33、ation for the above mentioned reasons we are making following changes. 1.In Pier # 26, we have taken the outer coordinates as well as centre line of Pier on Pile cap. These centre line on all four side will be transferred to Pier wall and will be shifted on Pier wall as slipform rises. The centre on

34、 the forms will be rechecked with these centre lines at 6 hourly intervals, if there are any variation (which is possible due the moving nature of slipforms and tolerances allowed as Per ACI 117) they will be corrected accordingly. The centre line being shifted upward along the Pier wall will also b

35、e rechecked using laser instrument with the original mark on the bottom. Also, as in earlier Piers the Main Contractor will continue to check the co-ordinates of the pier each day. 2.As mentioned above the stoppage at Diaphragms caused the messing up of centre line due to changes made in slipforms f

36、rom diaphragm to diaphragm (removal of yokes and changes in forms). We have decided to slipform the pier from pile cap to pier top in one go and cast diaphragms after dismantling of slipform. This will also speed up pier construction as casting of diaphragm holds up slipforms for eight days, which i

37、ncreases the time of Pier construction by slipform. 3.When the order is placed for concrete for placing in slipforms, we have estimated that by the time concrete arrives we will have space in forms for its placing and the concrete being placed will be able to bond with previous layer with limited vi

38、bration. If concrete has less slump or is stiff, excessive vibration will be carried out, which will affect concrete finish and dimension adjustment made difficult. So, Slump more than 150 mm and flowing concrete is required for placing in slipform. Thus, time supply of concrete is also requested to

39、 allow us to keep the top concrete layers in plastic state and allow adjustments of forms with ease. The taking of centre line along the sides of Pier in Pier 26 will allow us to control the dimension of Pier with tolerances for slipforming (as per ACI 117). Also, the other point of concrete being p

40、lastic in forms and slump of 150 mm at placing time in forms, with less vibration, will help in finish as well forms adjustment in slipform.Thanking you for your co-operation.For Construction Equipment Services (Pvt.) Limited(NASEER A. KHAN) Chief Executive2022-5-4薄壁空心墩施工工藝薄壁空心墩施工工藝2022-5-4約巴方約巴方員工員

41、工進行施工質量談話,提高質量進行施工質量談話,提高質量意識改進施工工藝。意識改進施工工藝。施工中的施工中的2626號墩,對外觀質量進行嚴格控制,配備號墩,對外觀質量進行嚴格控制,配備專人進行修飾及養護作業。專人進行修飾及養護作業。更換新模板更換新模板2022-5-4實施三:多項控制,加強觀測,及時發現問題并現場改正。確保薄壁空心墩施工過程中的坐標準確。實施三:多項控制,加強觀測,及時發現問題并現場改正。確保薄壁空心墩施工過程中的坐標準確。工作中管水平觀測確保滑工作中管水平觀測確保滑模處于水平狀態,防止偏模處于水平狀態,防止偏位位激光對中器定時激光對中器定時檢查滑模位置檢查滑模位置垂球檢查豎直度

42、垂球檢查豎直度全站儀檢查模板坐標點檢查(每天兩全站儀檢查模板坐標點檢查(每天兩次)次)2022-5-4實施四:混凝土澆筑循序漸進,防止出現偏差。實施四:混凝土澆筑循序漸進,防止出現偏差。鋼筋及千斤頂進行刻度表識,升模及澆筑鋼筋及千斤頂進行刻度表識,升模及澆筑嚴格按刻度進行施工。嚴格按刻度進行施工。2022-5-4實施五:計算操作臺荷載并制定專項方案實施五:計算操作臺荷載并制定專項方案 制定了專項方案,主要內容是優化平臺荷載。平臺上的荷載主要有:振動棒制定了專項方案,主要內容是優化平臺荷載。平臺上的荷載主要有:振動棒4 4個、氣割及電焊機各個、氣割及電焊機各1 1臺、液壓臺、液壓操作臺操作臺1

43、1臺、操作人員臺、操作人員1111個。總重量為:個。總重量為:36X4+85X2+185X1+60X11=1159kg36X4+85X2+185X1+60X11=1159kg。由于人員是流動的,因此,只考慮將。由于人員是流動的,因此,只考慮將設備和機具均勻放置。將滑模分成四個區域,每一區域單獨放置振動棒設備和機具均勻放置。將滑模分成四個區域,每一區域單獨放置振動棒1 1個。氣割、電焊機和個。氣割、電焊機和1 1個操作臺的重量差個操作臺的重量差不多,因此,氣割及電焊機和不多,因此,氣割及電焊機和1 1個操作臺對邊放置。這樣,操作平臺的設備、機具荷載基本均勻放置。規范操作個操作臺對邊放置。這樣,操

44、作平臺的設備、機具荷載基本均勻放置。規范操作工人的操作區域。隨著混凝土澆筑部位的均布進行,人員的操作區域也均勻布置工人的操作區域。隨著混凝土澆筑部位的均布進行,人員的操作區域也均勻布置。 2022-5-4 SURVEY REPORT PIER 26 PIER BOTTOM LEVEL 366.8(m) TOP LEVEL 382.314(m)NO.level(m)DateCo-ordinates As per DesignSite CoordinatesDifferenceDifference Average1E(m)N(m)E(m)N(m)E(mm)N(mm)E(mm)N(mm)369.23

45、710-0950003.37739995.19150003.439995.187239239371.18410-1050003.41439995.26750003.42439995.24522212.515.5374.26110-1150003.47339995.38850003.46839995.388508.757.75374.82210-1150003.47839995.39950003.47439995.4134146.37510.875376.6710-1250003.51639995.4850003.51339995.471394.6879.937377.36210-1250003

46、.52739995.49750003.53939995.51238.2436.468379.69110-1350003.57139995.58950003.5739995.5781114.6718.734382.42410-1450003.62339995.69550003.62639995.683153.83512.367TOTAL AVERAGE3.83512.3672369.26210-0950008.27939992.80850008.28839992.784924924371.28510-1050008.31739992.88750008.30839992.89396915374.2

47、5910-1150008.36539993.00350008.3639993.019516715.5374.8510-1150008.37939993.01550008.35539993.01124415.59.5376.67310-1250008.41439993.08650008.39739993.064172216.2515.75377.36410-1250008.42839993.11350008.42739993.0971168.62515.875379.70510-1350008.47239993.20550008.46539993.1757307.81222.937382.452

48、10-1450008.52439993.31250008.5339993.313616.90611.968TOTAL AVERAGE6.90611.9683369.2110-0950009.68439995.69750009.70539995.706219219371.24910-1050009.64639995.61850009.66739995.65719392024374.29410-1150009.58839995.49950009.57639995.51211612.5374.85510-1150009.58339995.48850009.55739995.488260216.253

49、76.68810-1250009.54839995.41750009.53539995.421134175.125377.34810-1250009.53539995.39150009.51939995.38816316.54.06379.75510-1350009.48939995.28750009.47239995.279171816.7511.03382.47810-1450009.43839995.19150009.43639995.2112209.37515.515TOTAL AVERAGE9.37515.5154369.21910-0950004.78439998.08250004.80439998.09208208371.19610-1050004.74639998.00450004.75239998.015611139.5374.33710-1150004.68639997.88250004.67439997.9121812.513.75374.79910-1150004.68339997.87550004.6

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
  • 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
  • 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論