文檔簡介
1、2 / 28section 1 土方施工方案1.1 地基處理方案1.1.1 地基工程概況a.地基加固處理方式table 1 :地基處理方式表序號地基處理方式出處1 強夯法( dynamic compaction)346-pd 03 au sp001 2 快速沖擊壓實法(rapid impact compaction)3 受控模量柱法(controlled modulus columns)b.平面分區table 2 :地基處理分區表序號圖例區域地基處理方式1 原位土區dc or ric 2 瀉湖回填區cmc s3 3 / 28figure 1 :地基處理分區圖1.1.2 強夯( dc)施工方案a
2、.introduction a.1 equipment table 3 :dc 法機械設備表設備用途機械設備dynamic compaction works dynamic compaction cranes pounders soil investigation works drilling machine cpt rig hydraulic jacks for plate load tests 4 / 28earthworks loaders dozers graders a.2 principle dynamic compaction is applicable to both satu
3、rated and unsaturated soils. the basic principle of this technique is the transmission of high energy impacts to loose, soft granular and dry clayey soils, which initially have low bearing capacity and high compressibility or collapsibility potentials in order to significantly improve their characte
4、ristics with depth. this impact energy is delivered by dropping a heavy weight from a significant height, general process of dynamic compaction is presented in the following figure. figure 2 :the process of dynamic compaction a.3 effect decrease of the void ratio, by compressing the material both ve
5、rtically and laterally. ground surface settlement as a result of densification of the improved layer. increased mechanical parameters of the improved layer. b.trial tests the performance of ground compaction trial tests 5 / 28allows the optimization of the tamping grid design, the number of blows an
6、d phases. from the calibration area tests results, minimum values to follow during the execution of works are proposed for the different parameters of dc: b.1 the number of blows by print. b.2 the drop height. b.3 the pounder weight. b.4 the number of phases. figure 3 :phases of dynamic compaction c
7、.sequence of work to execute the dynamic compaction technique, the following sequence is to be followed: table 4 :dc 法施工流程表步驟施工內容step1 preparation of a working platform. step2 carrying out a preliminary survey of the platform. step3 setting out of reference points. step4 perform the preliminary test
8、ing: - setting out the pre-treatment test locations - carry out the pre-treatment tests (cpt) step5 carry out calibration area with the following sequence: - setting out the ground compaction trial prints - tamping the prints - conducting quality control tests: cone penetrometer testing(cpt) and pla
9、te load tests (plt) step6 carry out dynamic compaction: - setting out the dc prints - tamping the prints using parameters extracted from the calibration works - rough grading and leveling of the platform step7 performing the post treatment testing to verify the achievement of the soil improvement de
10、sign criteria. remarks: the soil improvement parameters cannot be totally predefined. a calibration area is the best guide to define the energy, and it may be necessary to adjust compaction energy during execution subject to local ground conditions. 6 / 28d.records during the execution of the works,
11、 all execution parameters are continuously recorded: d.1 the number of blows by dc/dr prints. d.2 the drop height. d.3 the weight and dimensions of the pounder used. e.testing quality testing for the performance of the ground improvement works will be made using the following methods: e.1 cone penet
12、rometer testing(cpt) e.2 plate load tests (plt) 1.1.3 快速沖擊壓實(ric )施工方案a.introduction a.1 equipment table 5:ric 法機械設備表設備用途機械設備rapid impact compaction works ric machines excavators soil investigation works drilling machine cpt rig hydraulic jacks for plate load tests earthworks loaders dozers graders
13、a.2 principle ric will utilize multiple ric machines, 9000 & 12000 kg drop weight rigs. the 9000 kg hammer is coupled to cat 345 crawler excavator (or similar) and the 12000 kg hammer is coupled to a cat 365 excavator (or similar). the machines are equipped with on board 7 / 28computers that mon
14、itor the compaction process. the equipment monitors drop weight height, count and settlement of the compaction foot. ric 9000 is shown in the following figure. figure 4 :ric 9000 type b.trial tests ric proposes four areas 30m x 30m for the trials of the rapid impact compaction method. the compaction
15、 pattern will be executed following the number order shown above, which will result in a first set of compaction points based on an initial 6m grid spacing with a finer second set 3m grid spacing in between. during the trials, cpt testing will be carried out to verify the degree of compaction and th
16、at the design criteria will be met. the compaction pattern for the trial area is shown in the following figure. 8 / 28figure 5 :proposed compaction pattern c.sequence of work to execute the dynamic compaction technique, the following sequence is to be followed: table 6 :dc 法施工流程表步驟施工內容step1 full gro
17、und survey pre-compaction on each area to be compacted. step2 setting out of sectors and compaction points by gps step3 ric compaction as per the setting out drawings numbering sequence. step4 ric cpt testing after each sector is completed (ric internal use). step5 if testing is satisfactory, perfor
18、m 3rd party cpt testing, else grade area flat and repeat from step 2. step6 report on cpt performance. d.records a report will be prepared after all compaction works and testing is completed. the report will present the following: d.1 survey data pre and post compaction d.2 pre compaction cpt data 9
19、 / 28d.3 post compaction cpt data d.4 daily reports d.5 analysis of post compaction data and calculations 1.1.4 受控模量柱( cmc s )施工方案10 / 281.2 土方開挖方案1.2.1 土方開挖概況本工程土方開挖主要為五個區域:錨索基礎區段、中庭區段、零售商業區段、連廊區段、通風管廊區段。自然地面標高約+2.000m ,土方開挖總量約32 萬 m3。根據設計圖紙及現場實際情況,各區開挖概況如下圖表。table 7 :土方開挖概況表部位自然地面標高墊層底標高開挖深度錨索基礎區段
20、約+2.00m -6.10m 約 8.10m 中庭區段約+2.00m -0.80m/-2.25m 約 2.80m/4.25m 零售商業區段約+2.00m +1.35m/-0.70m 約 0.65m/2.70m 連廊區段約+2.00m -1.80m 約 3.80m 通風管廊區段約+2.00m +1.45m/-0.70m 約 0.55m/2.70m figure 6 :土方開挖區域平面圖備注:以上數據僅做參考,不做商務依據。11 / 281.2.2 土方開挖施工部署a.土方分層開挖土方分層開挖,分層厚度不超過3.0m , 形成錯層開挖。 開挖過程中為保證基坑土不被擾動,底層預留 300mm 厚土采
21、用人工清底。table 8 :土方開挖說明表figure 7 :錨索基礎區段開挖分層圖figure 8 :中庭區段開挖分層圖(一)figure 9 :中庭區段開挖分層圖(二)12 / 28figure 10 :零售商業區段開挖分層圖figure 11 :連廊區段開挖分層圖figure 12 :通風管廊區段開挖分層圖b.土方開挖分區土方開挖隨結構施工進度情況進行。開挖步驟總體分為三段,順序為:錨索基礎、連廊區段零售商業區區段中庭、通風管廊區段。table 9 :土方開挖分區圖表序號圖例區域1 錨索基礎、連廊區段2 零售商業區區段13 / 283 中庭、通風管廊區段figure 13 :土方開挖分
22、區圖c.開挖施工階段劃分c.1 錨索基礎和連廊基礎土方開挖。table 10 :土方開挖流程表(一)開挖區域錨索基礎、連廊區段工作內容土方開挖、基坑支護figure 14 :開挖流程平面圖(一)14 / 28說明:錨索基礎和連廊同步進行土方開挖施工,錨索基礎由a1、b1、c1、d1 階段向連廊流水開挖,連廊由e1、f1 階段向塔樓流水開挖。機械種類配備情況:大型反鏟挖掘機,小型反鏟挖掘機,土方車。備注:以上數據僅做參考,不做商務依據。c.2 商業零售區基礎土方開挖。table 11:土方開挖流程表(二)開挖區域商業零售區段工作內容土方開挖、基坑支護figure 15 :開挖流程平面圖(二)15
23、 / 28說明:商業零售區分為四個小區,由g1 階段向 g4 流水開挖。機械種類配備情況:大型反鏟挖掘機,小型反鏟挖掘機,土方車。備注:以上數據僅做參考,不做商務依據。c.3 中庭區段基礎土方開挖。根據施工時間先后分為兩個部分進行土方開挖施工。table 12 :土方開挖流程表(三)開挖區域中庭、通風管廊區段工作內容土方開挖、基坑支護figure 16 :開挖流程平面圖(三)16 / 28說明:中庭、通風管廊區段共分為三個小區,由h1 階段向 h3 流水開挖。 h1、h2 小區內流水開挖: 1-1(2-1)1-2(2-2) 。機械種類配備情況:大型反鏟挖掘機,小型反鏟挖掘機,土方車。備注:以上
24、數據僅做參考,不做商務依據。d.土方平衡措施table 13 :土方開挖工程量統計表部位面積開挖土方量備注錨索基礎區段約 2.21 萬約 24.98 萬 m3考慮放坡長度中庭區段約 1.25 萬約 2.56 萬 m3考慮放坡長度零售商業區段約 3.30 萬約 2.36 萬 m3考慮放坡長度連廊區段約 0.34 萬約 1.64 萬 m3考慮放坡長度通風管廊區段約 0.30 萬約 0.82 萬 m3/ 備注:以上數據僅做參考,不做商務依據。17 / 28figure 17 :過程回填平面圖(一)說明:錨索基礎和連廊土方開挖過程中土質較好的土運至東西側廣場,同步進行土方分層回填。土方回填位置距開挖基
25、坑2.00m ,邊坡坡比1:1。機械種類配備情況:反鏟挖掘機,土方車,推土機,平地機,壓路機。figure 18 :過程回填平面圖(二)18 / 28說明:商業零售區土方開挖過程中土質較好的土運至北側通風管廊區,同步進行土方分層回填。土方回填至標高 +6.000m 處,邊坡坡比 1:1。機械種類配備情況: 反鏟挖掘機, 土方車,推土機,平地機,壓路機。1.2.3 開挖施工要點a.本工程大面土方開挖擬采用大型反鏟挖掘機進行開挖,后八輪自卸車外運棄土;底層預留300mm 厚人工清底,采用小型挖掘機配合轉土。b.出土臨時坡道按照1:6 進行放坡,臨時坡道兩側土方根據土質情況按照1:11:2 進行放坡
26、。c.基坑底采用小型反鏟結合人工清底至底板底,并開挖基坑內周邊的排水溝。土方開挖完成后應及時進行驗槽并澆筑墊層混凝土,避免基底土長時間暴露。d.在大面土方開挖過程中,將同時進行超灌工程樁破除及樁間土的掏挖,樁間土使用小挖機及人工進行清理,挖除樁間土過程中避免挖機與工程樁的碰撞。1.3 基坑支護、降排水方案本次基坑支護、降排水方案為補充內容,范圍針對連廊(corridor ) 、零售商業區(retail ) 、通風管廊( plenums ) 、中庭( atrium )區域基坑,不包含錨索基礎基坑。1.3.1 基坑總體概況根據設計圖紙,基坑周長約810m ,基坑面積約2260 。場地自然標高約+2
27、.000m ,基坑開 挖 底 標 高 考 慮 為 基 礎 墊 層 底 , 墊 層 厚100mm , 即 中 庭 區 基 礎 基 坑 開 挖 底 標 高 為-0.800m/-2.250m, 開 挖 深 度 為2.800m/4.250m; 零 售 商 業 區 基 礎 開 挖 底 標 高 為+1.350m/-0.700m,開挖深度為0.650m/2.700m;連廊區基礎開挖底標高為-1.800m ,開挖深度為 3.800m ; 通風管廊區基礎開挖底標高為+1.450m/-0.700m, 開挖深度為0.550m/2.700m 。1.3.2 基坑支護方案土方開挖過程中需對邊坡進行處理,根據實際開挖深度,
28、基坑邊坡擬采用支護型式為:一級放坡、二級放坡。其中放坡坡比為1:1,平臺寬度為2m。具體基坑支護方案如下圖表。19 / 28figure 19 :基坑支護分區分段圖table 14 :基坑支護情況統計表序號圖例分段場地整平標高( m)基坑底標高( m)開挖深度(m)支護方案1 aa1 、de、d1e1 2.000 -2.250 4.250 二級放坡2 ab、cd、a1b1 、c1d1 2.000 -1.800 3.800 二級放坡3 ef、e1f1 2.000 -0.800 2.800 一級放坡4 fg、f1g1 2.000 +1.350 0.650 一級放坡5 hg、h1g1 2.000 -
29、0.700 2.700 一級放坡table 15 :基坑支護設計情況表20 / 28figure 20 :基坑開挖及放坡支護剖面圖1.3.3 排水方案本工程土方開挖過程降排水采用集水明排方案,由地下排水溝、集水井、沉淀池、排水管組成。基坑底布設排水溝, 排水溝用 120 磚砌筑, 紅磚鋪底, 內抹 20mm 水泥砂漿, 凈截面 300300mm 。根據現場的大小,集水坑設定為直徑0.8m 深 1m 磚砌集水井,井內抹15mm 水泥砂漿,按每4060m距離布置,在土方開挖過程中,集水坑深度及布置視實際開挖情況而定。根據實際情況, 基坑頂設置簡易沉淀池2m1m1m,基坑內積水通過各個集水井采用抽水
30、泵抽排至基坑頂,排水經多級沉淀池沉淀后,由中水系統統一處理。figure 21 :排水溝剖面詳圖figure 22 :集水井剖面詳圖rammed earth50 thick c10 concrete cushion brick masonry120503001512015 thick 1:3 cement mortar plaster 120 thick limesand30015a fall of 0.5%drain ditch with240 thick brick wall15 thick 1:3 cement mortar plaster300 thick gravel50 thick
31、 c10 concrete cushionrammed earth21 / 28figure 23 :集水井 1-1 詳圖figure 24 :沉淀池剖面詳圖1.4 土方回填方案1.4.1 土方回填概況本工程土方回填主要分布在廣場區域及通風管廊區段。自然地面標高約+2.000m ,土方回填總量約 270 萬 m3。根據設計圖紙及現場實際情況,各區回填概況如下圖表。table 16 :土方回填概況表部位自然地面標高回填高度面積廣場區段約+2.000m 約 1621m 約 11.4 萬通風管廊區段約+2.000m 約 17m 約 1.4 萬figure 25 :土方回填區域平面圖22 / 28備注
32、:以上數據僅做參考,不做商務依據。1.4.2 土方回填施工部署a.土方回填分區本工程土方回填主要包括兩大部分:專有土方工程和廣場回填。專有土方回填包含兩個區域:中庭外圍回填、零售商業區外圍回填。table 17 :土方回填概況表序號部位回填區域平面圖方量( m3)1 專有土方工程約 18 萬 m3(回填要求壓實度不小于98% )23 / 282 廣場回填約 252 萬 m3(回填要求壓實度不小于95% )備注:以上數據僅做參考,不做商務依據。b.土方分層回填土方開挖施工應由內向外,由低向高,分層回填。采用振動打夯機配合壓路機進行壓實。table 18 :土方回填說明表figure 26 :結構外圍土方回填分層圖24 / 28figure 27 :廣場土方回填分層圖c.回填施工階段劃分c.1 階段一:通風管廊土方回填。table 19 :土方回填流程表(一)階段一回填區域通風管廊回填時間30 個工作日(樁基施工之
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 工業固廢資源化利用研究
- 工業機器人技術在汽車制造中的應用研究
- 工業控制系統信息安全防護
- 工業機器人技術提升產品質量的研究
- 工業機器人與AI技術的融合趨勢分析
- 工業機器人產品開發與上市流程
- 工業生產中的滅菌技術與策略
- 工業自動化與智能制造技術探索
- 工業設計中的數字化技術應用
- 工作中的有效溝通策略
- 《真空系統設計》課件
- 家庭語言環境與兒童語言發展
- 短視頻起號運營全攻略
- 清華人工骨成人顱骨修補首選課件
- 班主任微創意:59招讓班級管理腦洞大開
- 水工渡槽課程設計
- 《統計學》 課件 廖穎文 1. 緒 論
- 07FK02防空地下室通風設備安裝圖集
- 歷屆圖靈獎獲獎者
- 溝通與演講2023學習通超星課后章節答案期末考試題庫2023年
- 第四講 堅持以人民為中心PPT習概論2023優化版教學課件
評論
0/150
提交評論