1、qualificationprocesssolutions, inc.proprietary information:unauthorized duplication is prohibiteddocument numberrevision numbera1date: 7 dec 2005page: 1 of 44author: narlin beatyrevision date: n/aequipment user requirementsequipment name:water for injection system1user requirements for awater for in
2、jectionsystemforinstallationatfirst approvalsecond approvalsignature:signature:print name:print name:print title:print title:qualification process solutions13406 blythenia rdphoenix, md 21131qualificationprocesssolutions, inc.proprietary information:unauthorized duplication is prohibiteddocument num
3、berrevision numbera1date: 7 dec 2005page: 2 of 44author: narlin beatyrevision date: n/aequipment user requirementsequipment name:water for injection system2table of contents1introduction .52overview.63operational requirements.73.1functions.73.1.1operation.73.1.2i/o streams.83.1.3process description:
4、.83.1.4cleaning and sanitization.103.1.5configuration (arrangement & materials of construction) .113.1.6operating parameters and quality requirements .193.1.7utilities required.203.1.8control system.213.1.9power failure and recovery.243.1.10“emergency stop” switch.243.1.11alarms and warnings .24
5、3.2data & security.263.2.1interfaces .263.2.2interface with operators.273.2.3the following shall be accessible only to supervisors .273.2.4interface with other systems.283.2.5data collection.283.2.6data collection and storage requirements:.293.3environment.293.3.1layout .293.3.2physical conditio
6、ns.294constraints.304.1milestones and timelines.304.2compatibility.304.2.1plc controllers.304.2.2utilities.314.2.3available drains:.314.2.4materials of construction.324.3availability.324.4procedural constraints.32qualificationprocesssolutions, inc.proprietary information:unauthorized duplication is
7、prohibiteddocument numberrevision numbera1date: 7 dec 2005page: 3 of 44author: narlin beatyrevision date: n/aequipment user requirementsequipment name:water for injection system35life-cycle.335.1development.335.2testing.335.3delivery.345.4documentation.345.5support.356glossary .367references.378calc
8、ulations.388.1water consumption data sheet.388.2wfi tank simulation.398.3wfi flow rate calculations.408.4wfi distribution pressure drop calculations.418.5pump selection.428.6steam distribution calculations.43qualificationprocesssolutions, inc.proprietary information:unauthorized duplication is prohi
9、biteddocument numberrevision numbera1date: 7 dec 2005page: 4 of 44author: narlin beatyrevision date: n/aequipment user requirementsequipment name:water for injection system4revision historyrev.dateapprovalrevision summary05 dec 2005qualificationprocesssolutions, inc.proprietary information:unauthori
10、zed duplication is prohibiteddocument numberrevision numbera1date: 7 dec 2005page: 5 of 44author: narlin beatyrevision date: n/aequipment user requirementsequipment name:water for injection system51introductionproject no.:document no.:document description: this document constitutes the user requirem
11、ent document under gamp for a wfi-ps water system, distribution loop, and pure steam system. this document starts with the manufacture of distilled water and pure steam. a separate document describes the manufacture of purified feed water using reverse osmosis and deionization methods.qualificationp
12、rocesssolutions, inc.proprietary information:unauthorized duplication is prohibiteddocument numberrevision numbera1date: 7 dec 2005page: 6 of 44author: narlin beatyrevision date: n/aequipment user requirementsequipment name:water for injection system62overviewthis is a critical utility system. major
13、 equipment included in this system includes:equipment descriptionp&id identification number1wfi-ps generator2wfi condenser3wfi storage tank4wfi tank vent filter5wfi circulation pump6pou heat exchanger7pou heat exchangerrefer to the p&ids for the interrelationship of the major equipment, as w
14、ell as the major utilities required for operation. p&id titledrawing number1wfi distribution p&id2pure steam distribution p&id3wfi condenser p&id4wfi-ps generation p&id5utility routing diagram6isometric wfi arrangement drawingthe storage tank and the hot circulation loop are self
15、-sanitizing at 80oc. operator intervention is required for periodic passivation and removal of accumulated rouge. the room temperature distribution sites require periodic sanitization with 80c water. the sanitization is performed semi-automatically, but requires operator intervention to properly con
16、figure downstream equipment.this specification does not include the ro/di system.qualificationprocesssolutions, inc.proprietary information:unauthorized duplication is prohibiteddocument numberrevision numbera1date: 7 dec 2005page: 7 of 44author: narlin beatyrevision date: n/aequipment user requirem
17、entsequipment name:water for injection system73operational requirements3.1functions3.1.1operationthe wfi-ps generator shall produce 800 #/hr of pure steam and 25 gph of water-for-injection (wfi) as defined by the current united states pharmacopoeia (usp). the wfi system will store and circulate wate
18、r at 80c from a 400 gallon ss316l storage tank and through ss316l piping to three distribution points. distribution site 1: a vial washing station that will accept water at 80c.distribution site 2: a wash sink requiring wfi at 40c after passage through a heat exchanger.distribution site 3: a compoun
19、ding station that will require variable temperature delivery of water from a heat exchanger. temperature range will be 23c to 80c. the ps system will distribute pure steam through ss316l piping to three distribution points.distribution site 1: autoclave (200 #/hr)distribution site 2: lyophilizer (50
20、0 #/hr)distribution site 3: vial washer (50 #/hr)the system shall operate automatically. automatic operation shall be initiated locally through operator input. qualificationprocesssolutions, inc.proprietary information:unauthorized duplication is prohibiteddocument numberrevision numbera1date: 7 dec
21、 2005page: 8 of 44author: narlin beatyrevision date: n/aequipment user requirementsequipment name:water for injection system8the system shall have fault/alarm indicator automatic shutdown based on operator programming for the severity and type of fault.3.1.2i/o streamsinput streams:cold rodi water t
22、o the wfi-ps generation equipmenthot wfi makeup from the wfi-ps generation equipment.plant steam for wfi-ps generation, heating stored or circulating wfi, and for maintaining the vent filters in a non-condensing condition.chilled water for cooling (cold wfi drops and wfi generation).output streams:h
23、ot wfi (from hot wfi drops and wfi generation)cold wfi (from cold wfi drops)psvents tank and condensers are equipped with absolute rated 0.2 m hydrophobic vent filters to maintain vessel pressure at or near atmospheric. gas & vapor flow is in both directions, as required.steam condensate dischar
24、ged through steam traps to the process drain.warm chilled water returned from cold wfi drops and wfi generation.pure steam condensate / excess steam to drain.3.1.3process description:the elements of the wfi-ps generation and storage and distribution systems work together to maintain the quality of t
25、he wfi and ps from production through to delivery to end users at various locations in the facility. the key concept is the continuous circulation of hot wfi to maintain contacted surfaces in a sanitary and clean condition. the following process flow description follows the flow of wfi and ps from t
26、he wfi-ps generator through the wfi storage and distribution systems.qualificationprocesssolutions, inc.proprietary information:unauthorized duplication is prohibiteddocument numberrevision numbera1date: 7 dec 2005page: 9 of 44author: narlin beatyrevision date: n/aequipment user requirementsequipmen
27、t name:water for injection system9wfi-ps generatorrodi water is fed to the generator on a demand based on operating state of the equipment.the generator converts the rodi water through distillation into pure steam for distribution to the users.the pure steam is condensed into wfi at 80 2c based on t
28、ank level. wfi is diverted to drain until the proper temperature and conductivity levels are achieved.wfi storage tankwfi from the wfi-ps generation equipment is fed to the storage tank on a demand based on level. storage tank is maintained at 80 2c by plant steam through a tank heating jacket. the
29、tank temperature is used to adjust the set point of the temperature controller.wfi returning from the hot wfi circulation loop is sprayed into storage tank through a spray ball to ensure that the tanks internal surfaces are completely and continuously wetted by hot wfi and are thus maintained in a s
30、anitary and clean condition.the tank is maintained at atmospheric pressure by a steam-traced hydrophobic vent filter.hot wfi circulation loopwfi is continuously circulated through a single 1.5” od tubing supply header running through the building.the header is designed to maintain wfi velocity betwe
31、en 10 feet per second (fps) with no user loads and 3 fps during periods of high demand. this ensures that flow is kept fully turbulent in the header. these velocities correspond to circulation flow rates of between 13.78 and 45.95 gpm. this velocity range is maintained based on the hydraulic design
32、of the system; pump is not speed-controlled.qualificationprocesssolutions, inc.proprietary information:unauthorized duplication is prohibiteddocument numberrevision numbera1date: 7 dec 2005page: 10 of 44author: narlin beatyrevision date: n/aequipment user requirementsequipment name:water for injecti
33、on system10note: individual user drop flows vary widely depending on user requirements. drop usage is not coordinated and wfi demand can vary randomly.wfi returning to storage tank is throttled to maintain a minimum backpressure of 20 psig on the header. this maintains sufficient pressure at the use
34、r drops to ensure adequate wfi flow and to maintain positive pressure at all points in the loop. short periods of low end-of-header flow due to high wfi demand do not adversely affect the ability of the system to maintain a sanitary condition.header temperature is controlled by the heating jacket, w
35、ith the controller set-point adjusted based on the temperature in storage tank (cascade control).end-of-header water conductivity is monitored on-line.pure steam distributionps is continuously distributed through a single 1.5” od tubing supply header running through the building.the header is design
36、ed to supply ps at 45 psi with a pressure drop less than 10% of the supply value.the header is designed with sanitary steam traps to remove condensate on a continuous basis. 3.1.4cleaning and sanitizationthe wfi storage and distribution systems are effectively self sanitizing and self cleaning.on st
37、art-up, water from the wfi-ps generator is directed to waste until it meets specification. this feature is self contained on the condensing unit.the wfi storage and distribution systems are periodically passivated to reduce corrosion.the wfi storage and distribution systems are periodically de-rouge
38、d to maintain smooth, clean surfaces and reduce the potential for biological contamination.qualificationprocesssolutions, inc.proprietary information:unauthorized duplication is prohibiteddocument numberrevision numbera1date: 7 dec 2005page: 11 of 44author: narlin beatyrevision date: n/aequipment us
39、er requirementsequipment name:water for injection system113.1.5configuration (arrangement & materials of construction)wfi -ps generatorthe wfi-ps generator is designed to produce water-for-injection (wfi) quality, pyrogen-free steam. the pyrogen-free steam produced, when condensed, meets all cri
40、teria for water-for-injection, as directed by the latest edition of the u.s. pharmacopoeia. the wfi-ps system is designed to produce sterile, pyrogen-free water-for-injection (wfi), as well. the distillate produced meets all criteria directed by the latest edition of the u.s. pharmacopoeia. the wfi-
41、ps system is configured to produce both pure steam and distillate concurrently.the wfi-ps generator is designed and constructed to meet all requirements of current good manufacturing practices (cgmps), as enforced by the u.s. food and drug administration. the separation of entrained impurities and p
42、yrogenic material is accomplished using gravity and centrifugal force.impurities collected in the separation process are continuously removed through the waste outlet.all surfaces in contact with feed water and pure steam are constructed of type 316l stainless steel for protection against carbide pr
43、ecipitation during the welding process.evaporator & separatorthe evaporator is a double-tubesheet, straight-tube, shell-and-tube heat exchanger, welded and constructed per asme, section viii, division 1, for unfired pressure vessels. all connections are sanitary-clamp type fittings.condenserqual
44、ificationprocesssolutions, inc.proprietary information:unauthorized duplication is prohibiteddocument numberrevision numbera1date: 7 dec 2005page: 12 of 44author: narlin beatyrevision date: n/aequipment user requirementsequipment name:water for injection system12the condenser is a u-tube shell-and-t
45、ube heat exchanger of double-tubesheet design, to ensure that coolant will not leak into the pure vapor and distillate. the tube side of the condenser is asme code stamped per section viii, division 1, for unfired pressure vessels.the condenser shell is mounted horizontally and pitched toward its ro
46、und end, with the distillate outlet at the lowest point to ensure full drainage.the condenser is vented to atmosphere in order to remove non-condensable gases and to equalize pressure during cooling. the vent is protected by a hydrophobic, pharmaceutical-grade, 0.2 m filter, preventing the passage o
47、f unfiltered air into the condenser and protecting the condenser from microbial contamination. filter shall be heat traced with isolation valves for maintenance purposes.the condenser is constructed of type 316l stainless steel. the connections for feed water, pure steam, and distillate are sanitary
48、-clamp type connections. coolant connections are npt fittings.feed water pump the feed water pump is contained entirely on the wfi-ps generator skid and includes all piping and wiring for automatic operation, contactor and overload, and alarm functions.all connections are sanitary-clamp type fitting
49、s.minimum feed water pressure to the pump is 2 psig.the pump is a sanitary, centrifugal-type, 316l stainless pump manufactured by _. it operates on 460 vac (or 208 vac), 3-phase, 60 hz, electrical current.table: wfi-ps generator & associated equipmentqualificationprocesssolutions, inc.proprietar
50、y information:unauthorized duplication is prohibiteddocument numberrevision numbera1date: 7 dec 2005page: 13 of 44author: narlin beatyrevision date: n/aequipment user requirementsequipment name:water for injection system13design attributewfi-ps generatorwfi condensermanufacturer/sncapacity (working)
51、800 # / hr25 gphpressure rating_ psig _ psigtemperature rating132 c132 cmaterial316l316lwfi contact surfaces20 -inch ra, passivated20 -inch ra, passivatednozzles2:1 aspect ratio, free draining, sanitary fittingsn.a.overpressure protection_none installedqualificationprocesssolutions, inc.proprietary
52、information:unauthorized duplication is prohibiteddocument numberrevision numbera1date: 7 dec 2005page: 14 of 44author: narlin beatyrevision date: n/aequipment user requirementsequipment name:water for injection system14wfi storage tank:the storage tank is a vertical, cylindrical tank of sanitary de
53、sign. all wfi contact surfaces are 316l stainless steel with a 20 inch ra or better surface finish. all internal surfaces on the tanks are kept wetted by spray balls on the circulation loop returns. the tanks are designed to be free draining. nozzles are designed for 2:1 depth to diameter ratio to e
54、nsure good spray penetration. the tanks are asme pressure vessels, although they are normally operated at atmospheric pressure, maintained through steam heated, hydrophobic aseptic filters. the following table summarizes the key characteristics of the one storage tank.table: wfi storage tank & a
55、ssociated equipmentdesign attributewfi storage tankwfi storage tank jacketmanufacturer/sncapacity (working)400 galn.a.diameter_” id_” idstraight side_” t/t_”headsasme f&dn.a.pressure rating45 psig & full vacuum100 psigtemperature rating132 c132 cmaterial316l304 (non-contact)wfi contact surfa
56、ces20 -inch ra, passivatedn.a.nozzles2:1 aspect ratio, free draining, sanitary fittingsn.a.overpressure protectionsanitary rupture discnone installedwfi tank vent filterqualificationprocesssolutions, inc.proprietary information:unauthorized duplication is prohibiteddocument numberrevision numbera1da
57、te: 7 dec 2005page: 15 of 44author: narlin beatyrevision date: n/aequipment user requirementsequipment name:water for injection system15the wfi tank vent filter is a sanitary design absolute rated 0.2m filter. the following table summarizes the key characteristics of the one filter.table: wfi tank v
58、ent filterdesign attributewfi tank vent filter cartrdigewfi vent filter housingmanufacturermillipore_model_typesanitarysanitaryutility side ratings125 c continuous150 psig / -20 to 350 futilityn/asteamwfi contact mocpvdf316lsealsvitonvitonwfi side surface finishn/a25 inch rafiltration surface area_
59、ft2wfi circulation pump:qualificationprocesssolutions, inc.proprietary information:unauthorized duplication is prohibiteddocument numberrevision numbera1date: 7 dec 2005page: 16 of 44author: narlin beatyrevision date: n/aequipment user requirementsequipment name:water for injection system16the wfi p
60、ump is a sanitary design centrifugal pumps. the following table summarizes the key characteristics of the one pump.table: wfi circulation pumpdesign attributewfi circulation pumpmanufacturer / model_serial number_inlet2”outlet1.5”impeller115 mmrated flow30 gpmrated tdh85 feetmaterial316linternal surface finish25 inch raseal typedouble, sic sic / c ceramic
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年教育行業數字化教材在在線教育中的市場分析報告
- 2025年工業互聯網平臺量子通信技術在智能電網調度中的應用研究報告
- 跨文化交流能力在2025年國際化教育中的跨文化教育發展
- 短視頻行業內容監管與平臺內容生態建設報告
- 2025年重慶市中考歷史真題(原卷版)
- 衛生院內部采購管理制度
- 景區售票部門管理制度
- 縣硬筆書法協會管理制度
- 公司賬目及資金管理制度
- 景區營銷培訓管理制度
- 食材配送服務方案(技術方案)
- 大學體育與健康課件:健康體適能
- 中泰威變頻器使用說明書
- 國開電大本科《中國法律史》在線形考(任務一至十二)試題及答案
- 中建硅墨烯保溫板外墻保溫施工方案
- 單片機原理及應用完整全套PPT教學課件
- 初三自主招生自薦信 自主招生自薦信
- 山東省濟寧市兗州區2022-2023學年八年級下學期期末數學試題(含答案)
- 南京醫科大學自主招生面試試題綜合素質答案技巧-南京醫學院自主招生題
- 武陟縣袁肯紙業有限公司紙箱項目環評報告
- 大學啟示錄:如何讀大學(上海交通大學)【超星爾雅學習通】章節答案
評論
0/150
提交評論