目錄

第一章編制說(shuō)明................................................4

1.1編制范圍..................................................................4

1.2編制依據(jù)..................................................................4

1.3本工程采用的法規(guī)、規(guī)范、標(biāo)準(zhǔn)及其它......................................4

1.3.1法律及規(guī)章.............................................................4

132施工及驗(yàn)收規(guī)范和規(guī)程、標(biāo)準(zhǔn).............................................4

第二章工程概況................................................7

2.1工程簡(jiǎn)介...................................................................7

2.2工程內(nèi)容..................................................................7

2.2.1工程范圍...............................................................7

2.2.2工程概況...............................................................7

2.3氣象、地質(zhì)和水文條件......................................................8

2.3.1氣象條件...............................................................8

2.3.2工程地質(zhì)條件...........................................................9

2.3.3水文條件...............................................................9

2.4現(xiàn)場(chǎng)條件.................................................................10

2.4.1地形條件..............................................................10

2.4.2現(xiàn)場(chǎng)水電條件..........................................................10

2.4.3現(xiàn)場(chǎng)交通條件..........................................................10

2.4.4施工場(chǎng)地條件..........................................................10

第三章工程特點(diǎn)................................................11

3.1工程特點(diǎn)..................................................................11

3.2工程難點(diǎn).................................................................11

3.2.1基坑降水..............................................................11

3.2.2結(jié)構(gòu)現(xiàn)澆混凝土數(shù)量大、抗?jié)B混凝土數(shù)量大..............................11

3.2.3池壁施工..............................................................11

3.2.4變形縫與加強(qiáng)帶施工...................................................12

1

3.2.5滿水試驗(yàn)..............................................................12

3.2.6土建施工與工藝設(shè)備安裝的配合.........................................12

3.2.7施工交叉作業(yè)多........................................................12

3.2.8冬雨季施工............................................................12

3.3施工難點(diǎn)對(duì)策..............................................................12

3.3.1合理調(diào)配各種資源投入.................................................12

3.3.2制定有針對(duì)性的專項(xiàng)工程施工方案.......................................12

3.3.3采用先進(jìn)的管理手段,確保質(zhì)量目標(biāo)的實(shí)現(xiàn)..............................12

3.3.4認(rèn)真做好幾項(xiàng)關(guān)鍵工序,嚴(yán)把質(zhì)量.......................................13

3.3.5做好與各單位的施工配合...............................................13

第四章施工部署...............................................14

4.1施工總體策劃.............................................................14

4.1.1項(xiàng)目管理目標(biāo)..........................................................14

4.1.2項(xiàng)目管理機(jī)構(gòu)..........................................................15

4.1.3總進(jìn)度計(jì)劃控制........................................................18

4.2施工流程及施工段劃分.....................................................18

4.2.1施工區(qū)段劃分..........................................................18

4.2.2施工流程..............................................................18

4.3施工準(zhǔn)備工作計(jì)劃.........................................................19

4.3.1施工準(zhǔn)備工作..........................................................19

4.3.2施工準(zhǔn)備工作計(jì)劃表...................................................19

4.4資源配置計(jì)劃.............................................................20

4.4.1勞動(dòng)力資源配置計(jì)劃...................................................20

4.4.2施工機(jī)械設(shè)備配置計(jì)劃.................................................22

4.4.3主要試驗(yàn)檢測(cè)設(shè)備配置計(jì)劃.............................................26

4.5資金使用計(jì)劃.............................................................26

4.5.1資金需求計(jì)劃..........................................................27

4.5.2資金管理措施..........................................................28

第五章施工現(xiàn)場(chǎng)總平面布置.....................................30

2

5.1施工現(xiàn)場(chǎng)條件.............................................................30

5.2現(xiàn)場(chǎng)總平面布置的原則....................................................30

5.3施工平面布置依據(jù).........................................................30

5.4施工平面總體規(guī)劃及功能區(qū)劃分............................................30

5.4.1施工平面總體規(guī)劃.....................................................30

5.4.2功能區(qū)劃分............................................................31

5.5現(xiàn)場(chǎng)臨水布置.............................................................31

5.5.1臨水用量計(jì)算..........................................................31

5.5.2水源選擇..............................................................32

5.5.3施工用水布置.........................................................32

5.6施工現(xiàn)場(chǎng)臨時(shí)用電布置....................................................33

5.6.1現(xiàn)場(chǎng)施工用電計(jì)算.....................................................33

5.6.2變壓器選擇............................................................33

5.6.3施工現(xiàn)場(chǎng)用電平面布置.................................................33

5.7現(xiàn)場(chǎng)道路布置.............................................................33

5.8垂直運(yùn)輸設(shè)備布置.........................................................34

5.9施工總平面布置管理.......................................................34

5.9.1管理原則..............................................................34

5.9.2管理體系..............................................................34

5.9.3管理計(jì)劃與實(shí)施.......................................................34

5.10施工現(xiàn)場(chǎng)總平面布置圖(附后)...........................................34

第六章施工進(jìn)度計(jì)劃及保證措施.................................35

6.1施工進(jìn)度控制目標(biāo).........................................................35

6.2施工進(jìn)度計(jì)劃安排原則....................................................35

6.3施工進(jìn)度控制點(diǎn)...........................................................35

6.3.1施工進(jìn)度一級(jí)控制點(diǎn)...................................................35

6.3.2施工進(jìn)度二級(jí)控制點(diǎn)...................................................35

6.4施工進(jìn)度總計(jì)劃...........................................................37

6.4.1編制說(shuō)明..............................................................37

3

6.4.2施工進(jìn)度總計(jì)劃圖.....................................................37

6.4.3分期分批施工工程的開工、完工日期及工期一覽表........................37

6.4.4資源需求量供應(yīng)平衡表.................................................39

6.5主要工程施工進(jìn)度計(jì)劃....................................................40

6.5.1編制說(shuō)明..............................................................40

6.5.2主要工程施工進(jìn)度計(jì)劃.................................................40

6.5.3單位工程施工進(jìn)度計(jì)劃的風(fēng)險(xiǎn)分析及控制措施............................41

6.6施工進(jìn)度保證措施.........................................................42

6.6.1確保開工時(shí)間..........................................................42

6.6.2合理的施工方案.......................................................42

6.6.3做好各種資源的供應(yīng)...................................................43

6.6.4嚴(yán)格的管理與控制.....................................................43

6.6.5機(jī)械、水、電等設(shè)施的施工保證.........................................44

第七章施工配合與協(xié)調(diào).........................................45

7.1施工方與業(yè)主、監(jiān)理、設(shè)計(jì)的協(xié)調(diào)管理......................................45

7.1.1與業(yè)主關(guān)系的協(xié)調(diào).....................................................45

7.1.2與監(jiān)理關(guān)系的協(xié)調(diào).....................................................45

7.1.3與設(shè)計(jì)關(guān)系的協(xié)調(diào).....................................................46

7.2與工藝設(shè)備供貨商的配合協(xié)調(diào)..............................................46

7.3施工方與社會(huì)關(guān)系的協(xié)調(diào)..................................................47

7.3.1施工方與各種材料供應(yīng)單位的關(guān)系協(xié)調(diào)..................................47

7.3.2施工方與政府各部門的關(guān)系協(xié)調(diào)........................................47

7.3.3施工方與周圍居民及村委會(huì)的關(guān)系協(xié)調(diào)..................................48

第八章施工技術(shù)方案...........................................49

8.1主要單位工程施工技術(shù)方案................................................49

8.1.1初沉池、二沉池施工方案...............................................49

8.1.2運(yùn)營(yíng)管理樓施工方案...................................................53

8.1.3混凝土箱涵施工方案...................................................53

8.2土建工程施工方法.........................................................57

4

8.2.1施工測(cè)量..............................................................57

8.2.2土方工程..............................................................59

8.2.3鋼筋工程.............................................................62

8.2.4模板工程..............................................................70

8.2.5混凝土工程............................................................75

8.2.6防水工程..............................................................81

8.2.7砌筑工程..............................................................82

8.2.8裝飾工程..............................................................84

8.2.10屋面工程.............................................................89

8.2.10腳手架工程..........................................................91

8.2.11門窗工程.............................................................92

8.2.12吊頂工程.............................................................93

8.2.13樓地面工程..........................................................94

8.2.14試驗(yàn)、檢驗(yàn)與計(jì)量....................................................98

8.2.15道路工程............................................................103

8.2.16圍墻工程............................................................107

8.2.17樁基工程............................................................107

8.2.18綠化工程............................................................111

8.3機(jī)電儀表安裝工程.........................................................118

8.3.1機(jī)械設(shè)備安裝工程.....................................................118

8.3.2管道安裝工程.........................................................133

8.3.3電氣設(shè)備和電器安裝工程..............................................144

8.3.4儀表及自動(dòng)化安裝工程................................................150

第九章專項(xiàng)工程施工方案及措施................................161

9.1地基加固處理............................................................161

9.2現(xiàn)場(chǎng)攪拌混凝土專項(xiàng)施工方案..............................................161

9.2.1工程概況.............................................................161

9.2.2施工部署.............................................................162

9.2.3施工工藝.............................................................163

5

9.3膨脹加強(qiáng)帶施工技術(shù)措施..................................................178

9.3.1概述.................................................................178

9.3.2施工方法.............................................................178

9.4變形縫施工技術(shù)方案......................................................178

9.4.1概述.................................................................178

9.4.2施工方法.............................................................179

9.5施工縫施工技術(shù)措施......................................................180

9.5.1構(gòu)筑物施工縫留設(shè)方法.................................................180

9.5.2施工縫處混凝土鑿毛方法..............................................180

9.5.3施工縫部位中防止漏漿措施............................................180

9.5.4池壁碎澆筑前準(zhǔn)備工作................................................180

9.6碎結(jié)構(gòu)抗?jié)B性能、抗裂措施................................................181

9.6.1提高碎結(jié)構(gòu)抗?jié)B性能保證措施..........................................181

9.6.2碎結(jié)構(gòu)防裂縫措施.....................................................182

9.7薄壁高墻施工質(zhì)量控制措施................................................183

9.8地下交叉管線基礎(chǔ)處理保證措施............................................183

9.9機(jī)電安裝特殊技術(shù)保障措施................................................184

第十章降低成本措施...........................................186

10.1組織措施................................................................186

10.2技術(shù)措施................................................................186

第十一章季節(jié)性施工措施.........................................188

11.1雨期施工措施............................................................188

11.1.1雨期施工準(zhǔn)備........................................................188

11.1.2雨期施工措施........................................................189

11.2冬期施工措施............................................................190

11.2.1冬期施工準(zhǔn)備........................................................190

11.2.2冬期施工措施........................................................190

11.2.3冬施期間對(duì)已施工完的構(gòu)筑物防凍保護(hù)措施.............................192

11.3炎熱高溫天氣施工措施...................................................193

6

11.3.1施工準(zhǔn)備工作........................................................193

11.3.2施工技術(shù)措施........................................................193

第十二章質(zhì)量管理及保證措施.....................................194

12.1質(zhì)量管理目標(biāo)............................................................194

12.2質(zhì)量管理體系...........................................................194

12.2.1質(zhì)量管理組織體系建立................................................195

12.2.2質(zhì)量管理控制體系建立...............................................199

12.3保證工程質(zhì)量控制措施...................................................203

12.3.1施工準(zhǔn)備階段的質(zhì)量控制措施.........................................204

12.3.2施工階段的質(zhì)量控制措施.............................................204

12.3.3竣工驗(yàn)收階段的質(zhì)量控制措施.........................................205

12.3.4各施工要素的質(zhì)量控制措施...........................................206

12.3.5全面質(zhì)量管理........................................................213

12.4成品保護(hù)措施...........................................................213

12.4.1鋼筋綁扎成型的成品質(zhì)量保護(hù).........................................213

12.4.2模板保護(hù)............................................................213

12.4.3混凝土成品保護(hù).....................................................214

12.4.4砌體成品質(zhì)量保護(hù)...................................................214

12.4.5樓地面成品保護(hù).....................................................214

12.4.6預(yù)留預(yù)埋件、水電安裝成品保護(hù).......................................215

12.4.7制成品保護(hù)..........................................................215

12.4.8交工前成品保護(hù)措施.................................................215

12.5工程質(zhì)量控制計(jì)劃.......................................................215

12.5.1質(zhì)量控制點(diǎn)與控制要求...............................................215

12.5.2質(zhì)量保證措施.......................................................216

第十三章”新材料、新產(chǎn)品、新工藝、新技術(shù)”的應(yīng)用..............230

13.1新技術(shù)、新材料、新產(chǎn)品、新工藝應(yīng)用的目標(biāo)..............................230

13.2新產(chǎn)品、新材料的應(yīng)用...................................................230

13.2.1新型模板應(yīng)用技術(shù)...................................................230

7

13.2.2快易收口網(wǎng)..........................................................223

13.3新技術(shù)的應(yīng)用............................................................223

13.3.1電子計(jì)量混凝土攪拌站...............................................223

13.3.2計(jì)算機(jī)及管理軟件的應(yīng)用.............................................223

第十四章竣工驗(yàn)收..............................................225

14.1竣工驗(yàn)收?qǐng)?zhí)行的標(biāo)準(zhǔn).....................................................225

14.2竣工驗(yàn)收的條件.........................................................225

14.3分部工程的驗(yàn)收.........................................................225

14.3.1分部工程驗(yàn)收的條件.................................................225

14.3.2分部工程的驗(yàn)收.....................................................225

14.4驗(yàn)收申請(qǐng)...............................................................225

14.5驗(yàn)收程序和組織.........................................................226

14.6竣工檢驗(yàn)的內(nèi)容.........................................................226

14.7需提交的主要竣工文件..................................................226

14.8竣工移交...............................................................227

第十五章環(huán)境保護(hù)管理..........................................228

15.1環(huán)境保護(hù)管理目標(biāo).......................................................228

15.1.1環(huán)境管理意義........................................................228

15.1.2環(huán)境保護(hù)管理目標(biāo)...................................................228

15.2環(huán)境保護(hù)管理體系.......................................................228

15.2.1環(huán)境保護(hù)管理體系的建立.............................................228

15.2.2環(huán)境管理流程圖(程序).............................................229

15.3環(huán)境保護(hù)管理措施.......................................................230

15.3.1防止大氣污染措施...................................................230

15.3.2防止水污染措施.....................................................230

15.3.3防止噪音污染措施...................................................230

15.3.4其它污染的控制措施.................................................231

15.3.5培訓(xùn)................................................................231

15.3.6信息交流與傳送.....................................................231

1

15.3.7文件控制............................................................231

15.3.8監(jiān)測(cè)和測(cè)量..........................................................232

15.3.9不符合項(xiàng)的糾正與預(yù)防措施...........................................232

15.3.10記錄...............................................................232

15.3.11環(huán)境管理體系的審核................................................232

第十六章文明施工管理..........................................233

16.1文明施工管理目標(biāo).......................................................233

16.2文明施工管理體系.......................................................233

16.2.1文明施工管理體系的建立.............................................233

16.2.2文明施工管理體系運(yùn)行...............................................234

16.3文明施工管理措施.......................................................234

16.3.1現(xiàn)場(chǎng)管理原則........................................................234

16.3.2文明施工措施.......................................................235

第十七章職業(yè)健康管理..........................................237

17.1職業(yè)健康管理目標(biāo).......................................................237

17.2職業(yè)健康管理體系.......................................................238

17.2.1職業(yè)健康管理組織體系的建立.........................................238

17.2.2職業(yè)健康管理運(yùn)行體系的建立.........................................239

17.3職業(yè)健康管理措施.......................................................240

17.3.1危險(xiǎn)因素識(shí)別與評(píng)價(jià).................................................240

17.3.2應(yīng)急準(zhǔn)備和響應(yīng)程序.................................................242

17.3.3職業(yè)傷害的預(yù)防.....................................................244

第十八章施工安全管理..........................................245

18.1施工安全管理目標(biāo).......................................................245

18.1.1管理方針............................................................245

18.1.2管理目標(biāo)............................................................245

18.2施工安全管理體系.......................................................245

18.3施工安全管理措施.......................................................252

2

18.3.1安全技術(shù)措施管理辦法...............................................252

18.3.2安全技術(shù)操作規(guī)程施工細(xì)則...........................................253

18.3.3安全防護(hù)的重點(diǎn)分析.................................................255

第十九章消防保衛(wèi)管理..........................................257

19.1消防保衛(wèi)管理目標(biāo).......................................................257

19.2消防保衛(wèi)管理體系.......................................................257

19.2.1治安保衛(wèi)管理體系的建立.............................................257

19.2.2消防組織管理體系的建立.............................................258

19.3消防保衛(wèi)管理措施.......................................................259

19.3.1治安保衛(wèi)措施........................................................259

19.3.2消防管理措施.......................................................260

3

第一章編制說(shuō)明

1.1編制范圍

本施工組織設(shè)計(jì)由我項(xiàng)目部組織技術(shù)骨干力量,在認(rèn)真閱讀了合同文件、技術(shù)規(guī)范、設(shè)計(jì)說(shuō)

明書、施工圖,并組織了施工組織設(shè)計(jì)編制相關(guān)人員考查了擬建場(chǎng)地狀況的基礎(chǔ)上,認(rèn)真編制了

本施工組織設(shè)計(jì)。

本施工組織設(shè)計(jì)內(nèi)容包括項(xiàng)目管理目標(biāo)、項(xiàng)目管理機(jī)構(gòu)設(shè)置、施工部署、總平面布置、施工

進(jìn)度計(jì)劃、主要施工方法及技術(shù)措施、專項(xiàng)施工方案、質(zhì)量、安全和文明施工等施工組織管理及

技術(shù)措施等內(nèi)容。是我項(xiàng)目部對(duì)本工程質(zhì)量、工期等方面進(jìn)行程序化管理的指導(dǎo)性文件,用以指

導(dǎo)本工程的施工和管理,確保優(yōu)質(zhì)、高速、文明完成本工程標(biāo)書要求的全部施工任務(wù)。

1.2編制依據(jù)

1.2.1XX市污水治理有限責(zé)任公司和XX國(guó)際招標(biāo)公司提供的設(shè)計(jì)圖紙、招標(biāo)文件及招標(biāo)答疑。

1.2.2我項(xiàng)目部對(duì)現(xiàn)場(chǎng)及對(duì)周邊實(shí)際情況的了解;

1.2.3總公司及工程局有關(guān)技術(shù)質(zhì)量管理、安全施工管理、文明施工、CI履蓋管理制度。

1.3本工程采用的法規(guī)、規(guī)范、標(biāo)準(zhǔn)及其它

1.3.1法律及規(guī)章

1.3.1.1《中華人民共和國(guó)建筑法》

1.3.1.2《建筑工程質(zhì)量管理?xiàng)l例》

1.3.1.3國(guó)家、行業(yè)及地方頒布的現(xiàn)行建筑設(shè)計(jì)和建筑施工的各類規(guī)程、規(guī)范及驗(yàn)收標(biāo)準(zhǔn)

1.3.L4XX市人民政府有關(guān)建筑安裝工程管理、環(huán)境保護(hù)等地方性法規(guī)、安全生產(chǎn)、文明施

工的規(guī)定

1.3.2施工及驗(yàn)收規(guī)范和規(guī)程、標(biāo)準(zhǔn)

1.3.2.1《給水排水構(gòu)筑物施工及驗(yàn)收規(guī)范》(GBJ141-90)

1.3.2.2《混凝土結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范》(GB50204-2002)

1.3.2.3《工程測(cè)量規(guī)范及條文說(shuō)明》(GB50026-93)

1.3.2.4《鋼筋焊接接頭試驗(yàn)方法標(biāo)準(zhǔn)》(JGJ/T27-2001)

1.3.2.5《鋼筋焊接及驗(yàn)收規(guī)程》(JGJ18-2003)

1.3.2.6《混凝土外加劑應(yīng)用技術(shù)規(guī)范》(GB50119-2003)

1.3.2.7《鋼筋混凝土用熱軋帶肋鋼筋》(GB1499T988)

1.3.2.8《鋼筋混凝土用熱軋光圓鋼筋》(GB13013-1991)

4

1.3.2.9《建筑工程冬期施工規(guī)范》(JGJ104-97)

1.3.2.10《建筑地基基礎(chǔ)工程施工及驗(yàn)收規(guī)范》(GB50202—2002)

1.3.2.11《全國(guó)通用給水排水標(biāo)準(zhǔn)圖集》(S2)

1.3.2.12《地下工程防水技術(shù)驗(yàn)收規(guī)范》(GB50208-2002)

1.3.2.13《地下工程防水技術(shù)規(guī)范》(GB50108—2001)

1.3.2.14《建筑機(jī)械使用安全技術(shù)規(guī)程》(JGJ33—2001)

1.3.2.15《砌體工程施工質(zhì)量與驗(yàn)收規(guī)范》(GB50203—2002)

1.3.2.16《給水排水管道工程施工及驗(yàn)收規(guī)范》(GB50268-97)

1.3.2.17《建筑工程施工質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)》(GB50300-2001)

1.3.2.18《建筑防腐工程施工及驗(yàn)收規(guī)范》(GB50212-2002)

1.3.2.19《屋面工程質(zhì)量驗(yàn)收規(guī)范》(GB5027-2002)

1.3.2.20《建筑裝飾裝修質(zhì)量驗(yàn)收規(guī)范》(GB50210-2001)

1.3.2.21《混凝土泵送施工技術(shù)規(guī)程》(JGJ/T10-95)

1.3.2.22《龍門架及井架物料提升機(jī)安全技術(shù)規(guī)范》(JGJ88-92)

1.3.2.23《建筑地面工程施工質(zhì)量驗(yàn)收規(guī)范》(GB50209-2002)

1.3.2.24《建筑電氣工程質(zhì)量驗(yàn)收規(guī)范》(GB50303-2002)

1.3.2.25《建筑給水排水及采暖工程施工質(zhì)量驗(yàn)收規(guī)范》(GB50242-2002)

1.3.2.26《建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范》(JGJ130-2001)

1.3.2.27《建筑工程文件歸檔整理規(guī)范》(GB/T50328-2001)

1.3.2.28《建筑工程項(xiàng)目管理規(guī)范》(GB/T50326-2002)

1.3.2.29《普通混凝土配合比設(shè)計(jì)規(guī)程》(JGJ98-2000)

1.3.2.30《鋼結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范》(GB50205-2001)

1.3.2.31《建筑樁基技術(shù)規(guī)范》(JGJ94-94)

1.3.2.32《建筑地基處理技術(shù)規(guī)范》(JGJ79-2002)

1.3.2.33《組合鋼模板技術(shù)規(guī)范》(GB50214—2001)

1.3.2.34《砌體工程施工質(zhì)量驗(yàn)收規(guī)范》(GB50203—2002)

1.3.2.35《建筑鋼結(jié)構(gòu)焊接規(guī)程》(JGJ81-2002)

1.3.2.36《城市道路路基基礎(chǔ)工程施工及驗(yàn)收規(guī)范》(CJJ44-91)

1.3.2.37《市政道路工程質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)》(CJJ1-90)

1.3.2.38《土工試驗(yàn)方法標(biāo)準(zhǔn)》(GB/T50123-1999)

5

1.3.2.39《給水用聚乙烯管材》(GB/T13663-2000)

1.3.2.40《水泥混凝土路面施工及驗(yàn)收規(guī)程》(GBJ97-87)

1.3.2.41《預(yù)制混凝土構(gòu)件質(zhì)量檢驗(yàn)和評(píng)定標(biāo)準(zhǔn)》(GB321-90)

1.3.2.42《埋地聚乙烯給水管道工程技術(shù)規(guī)范》(CJJ101-2004)

1.3.2.43《工業(yè)金屬管道工程施工及驗(yàn)收規(guī)范》(GB50235-97)

1.3.2.44《埋地鋼質(zhì)管道環(huán)氧煤瀝青防腐層施工及驗(yàn)收規(guī)范》(SYJ404790)

1.3.2.45《不銹鋼復(fù)合管》(GB/T18704-2002)

1.3.2.46《工業(yè)管道工程施工及驗(yàn)收規(guī)范》(GBJ235-82)

1.3.2.47《網(wǎng)架結(jié)構(gòu)設(shè)計(jì)與施工規(guī)程》(JGJ7-91)

1.3.2.48《網(wǎng)架結(jié)構(gòu)工程質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)》(JGJ78-91)

1.3.2.49《電氣裝置安裝工程接地裝置施工及驗(yàn)收規(guī)范》(GB50169-92)

1.3.2.50《低壓電器的外殼保護(hù)等級(jí)》(GB4992.2)

1.3.2.51《電氣裝置安裝工程電氣設(shè)備交接試驗(yàn)標(biāo)準(zhǔn)》(GB50150-91)

1.3.2.52《電氣安裝工程電纜線路施工及驗(yàn)收

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論