1、地面磚、花崗巖鋪貼施工方案Construction Scheme of Floor tile and Granite tile InstallationPreparations彈水平線,確定室內地磚完成面0.00The horizontal line, make sure indoor floor tile finish surface elevation of+ /-0.00.水電管線已安裝完畢。Water and electricity line already deployed.二、預備材料 Preparation of materials1. 425425 cement and med
2、ium sand and white cement.2. 800*800*25,600*600*25600*600*12800 * 800 * 25 granite, 600 * 600 * 25 granite, 600 * 600 * 12 floor tile.construction procedure1、工藝流程 construction process材料預備彈樓地面面層標高把握線基層處理彈線找中找方鋪貼基準把握標筋鋪貼面層鋪貼踢腳板養護與成品保護Prepare materialsBomb the ground floor surface elevation control lin
3、eBase treatmentBomb line Lay up the benchmark control standardscreedlay up surface courseLay up the baseboardMaintenance andprotection for the final product2Tile installation order、大面積施工時,應用分段挨次鋪貼。Large area construction, segmented order paving。 For the entire building, first tile separate rooms, th
4、en passgeways or corridors.、對于一般房間承受退步法先由房間中部向兩側鋪貼。對于有獨立柱的大廳,要先鋪貼柱間局部,然后再向兩邊開放。For General rooms, use regression method by laying up from the central to both sides. For the great hall with independent column, firsttile column section, then expand to both sides.、全部房間先鋪貼整塊板材,非整塊板材最終鋪貼。地面鋪貼完后再鋪貼踢腳板。All
5、 the rooms firstly paved with block plate ,or tile at last. Skirtingboard tiled after the ground .3、鋪貼方法:Tile installation method1好后可單邊掛線。Baseed on marking screed made before, the first row plate hang line onboth sides , after the first raw is tiled , it can be hang line on one side.、結合層與板材面層應分段同時鋪砌
6、。先進展試鋪,將干 平鋪到干硬性水泥砂漿上(干硬程度以手捏成團,落地即散為宜),用橡皮錘用力敲擊板面,使攤鋪的干硬性水泥砂漿結合層密2-5mm。Combined course and plate surface course should be tiled at the sametime. First trial laying, flat the rigid cement mortar to the paving part, andits thickness should be appropriated. Thentile the plank to dry, rigidcement morta
7、 (Advisable degree of dry is can be kneaded together, and scattered when dropped on land ). Use a rubber mallet hard strike theboard to make the pavingdry rigid cement mortar layer combination is close-grained, and make the surface 2-5 mm below the ground elevation control sheet.、試鋪適宜后,將板材揭起,在密實的干硬性
8、水泥砂漿結粘結,然后將板材再原位置再次安放。After appropriate trial paving,lift up the plate.Spread a layer of dry cement to the dry, rigid close-grained cement mortar,and wet it once by the watering can, or water a layer of cement paste for mudbonding, then put the plate back at the position.線吻合便完成一塊板材鋪貼,再依次鋪貼下一塊。When p
9、laced again, four corners of the plank should be dropped at the same time. After layed down steadily ,use a rubber hammer to strike it to make it flat and bonded firmlywith the combined course .The plank paving is done when the plank surface is coincided with the elevation ofthe ground control, then
10、 pave the next one .鋪貼時要隨時找平找直,做到四角平坦,縱橫縫隙對齊。When paving ,be sure that it is flat and straight. Make sure the fourcorners flat, and vertical and horizontal crack aligned.Quality requirements1Marble, granite主控工程Dominant item面層與下一層應結合結實無空鼓。Surface course should be combined firmly with the next one ,wi
11、thout any gaps.四角平坦,縱橫縫隙對齊、無色差。Four corners flat, vertical and horizontal crack aligned, colorlessdifference.一般工程 General item大理石,花崗石面層的外表應干凈,平坦,無磨痕,且應圖案清楚,色澤全都,接縫均勻,周邊順直,鑲嵌正確,板塊無裂、掉角、缺棱等缺陷。The surface of Marble and granite should be clean,flat, no grinding mark, and clear pattern , consistent color
12、, juncture uniform, straight surrounding,right Mosaic, plates without broken corners, no crack defects such as lackof edges.踢腳線外表干凈,高度全都,結合結實,出墻厚度全都。The surface of the baseboard should be clean, and consistent inheight, firmly combined, and with consistent wall thickness.樓梯踏步和臺階板塊的縫隙寬度應全都,齒角整齊,樓層10m
13、m。The stair tread and step plate should be consistent in gap width, andtidy tooth angles. The floor stage should be adjacent to the tread , ang the height difference should be no more than 10 mm.大理石和花崗石面層的允許偏差應符合:The deviation of marble and granite surface layer should beallowed to meet:、外表平坦度:1.2mm
14、 、縫格平直:1.2mm。接縫凹凸差:0.8mm。踢腳線上口平直:1.2mm。板塊間隙寬度:1.2mm。 Surface evenness:1.2mm Seam case straight:1.2mm Junctureheight differenceSkirtingline flatside :1.2mm Plategap width:1.2mm2、地面磚 Floor tile主控工程:Dominant item面層與下一層的結合粘結應結實,無空鼓。Surface course should be combined firmly with the next one ,without any
15、gaps.四角平坦,縱橫縫隙對齊,無色差。Four corners flat, vertical and horizontal crack aligned, colorlessdifference.一般工程:General item磚面層的外表應干凈,圖案清楚,色澤全都,接縫平坦,深淺全都,周邊順直,板塊無裂紋,掉角和缺損等缺陷。The surface ofbrick layer should be clean,flat, no grinding mark, and clear pattern , consistent color, juncture uniform, straight sur
16、rounding, right Mosaic, plates without broken corners, no crack defects such as lackof edges.面層鄰接處的鑲邊用料及尺寸應符合設計要求,邊角整齊,光滑。The edge materials anddimensions of surface course adjacent sideshould meet the design requirement, with tidy corners and smooth.地板磚間隙寬度:1.2Floor brick gap width:less than 1.2 mm
17、.踢腳線外表應干凈,高度全都,結合結實,離墻厚度全都。The surface of the baseboard should be clean, and consistent inheight, firmly combined, and with consistent wall thickness.面層外表的坡度應符合設計要求,不倒流水,無積水,與地漏,管道結合處應嚴密結實無滲漏。Theslope of surface course should meet the design requirement, on inverse flow, no no stagnant water.The jun
18、ction with floor drain,and pipeshould be closely solid with no leakage.五、成品保護Maintenance and protection for the final product1.1.3The paved ground can be landed 3 days later.2. 鋪的房間應臨時進展封閉,操作人員和檢查人員進入房間踩踏時,要輕踏在一塊木板上。The new paved room should be closed temporarily,when operators andinspectors enter rooms, please step on a piece of wood lightly.3. 地面
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 民事調解的方法和策略課件
- 自動門項目運營方案
- 2025年春國家開放大學《馬克思主義基本原理》期末終考試卷1參考答案試卷1
- 設備工作計劃13篇
- 幼兒園 中班科學奇妙的樹葉課件
- Unit 10 Lesson 3 Thinkign Skills and Reading Strategies 課件 2024-2025學年仁愛科普版英語七年級下冊
- 2025年Android性能優化總結BAT大廠面試總結
- 部編版五年級上冊第二單元《搭石》教案
- 建筑施工特種作業-建筑架子工附著式腳手架真題庫-6
- 色彩文案題目大全及答案
- 能源計量器具配備和管理
- 《食品經營許可證》申請報告書空白模板
- 試卷交接簽字單
- 有限空間作業及應急物資清單
- DB13(J)∕T 8060-2019 城鎮供熱管道及設備安裝工程施工質量驗收標準
- 《國際商務》課程
- 壓力容器設計管理制度
- 比亞迪員工手冊54
- 國際經濟學期末考試試題庫含答案
- 應力波理論復習資料
- 體育場地與設施
評論
0/150
提交評論