1、合同精品工程施工合同Con tract合同編號簽訂日期(Co ntract NO.)(Date ):發包方(簡稱甲方)Party A:承包方(簡稱乙方)Party B:結合本工程的具體情況,根據中華人民共和國合同法以及其他有關法律法規規定的原則,甲、乙雙方在平等、自愿、協商一致的基礎上達成如下協議,共同遵守。Accord ing to “P.C Con tract Law”,and other releva nt laws and regulati ons to the sp ecific circumsta nces of this p roject, p arties A and B ha
2、ve hereby equally and volun tarily en tered into the followi ng agreeme nt executed on the basis of mutual resp ect.1. 工程概況P roject overview1.1 工程名稱:P roject n ame:1.2 工程地點:Project locatio n:1.3 工程范圍:A. 新研發中心和新廠房的網絡綜合布線系統的施工;B. 數據中心的建設,主要包含:數據中心的裝飾工程、電氣系統、空調系統、機房閉 路監控系統、機房門禁系統、消防系統改造、機柜系統等。P roject
3、conten ts:A. The new R & D and new plant con struct ion of n etwork cabli ng systems;B. Data Center, mainiy includes: data center decoration and electrical systems, air-conditioning systems, CCTV systems, access con trol systems, firefight ing system reform, server rack systems.1.4 開工條件:合同生效后,甲方
4、預付款到位和現場具備開工條件。Start con diti ons: After the comme nceme nt of the con tract, Party A has started adva nee and on-site con diti ons in p lace.1.5工程造價:合同工程總造價為Y元(CNY ),人民幣大寫yua n ( CNY ).Project cost: Total project cost is詳細合同價格表見附件報價清單。Detailed con tract price list see attached quotatio n list.在詳細設計
5、和施工過程中,若工程量發生變化,按合同單價相應調整工程造價;若材質發生變化,按雙方商定的補充協議調整工程造價。In the detailed desig n and con struct ion pro cess, if the p roject qua ntity cha nges, accord ing to the con tract price adjustme nt p roject cost; if the material is cha nged, the suppl eme ntal agreeme nt agreed by both p arties for adjustme
6、 nt of engin eeri ng cost.2. 付款方式Terms of p ayme nt2.1由乙方向甲方提供指定帳戶、甲方以支票方式或銀行轉賬方式向乙方結算合同款;Party B shall p rovide the desig nated acco unt to party A, Party A by check or bank tran sfer to pay the con tract p ayme nt to Party B.2.2 本合同生效后,甲方付給乙方合同總價的40%作為工程預付款,即Y 元;After the sig ning of this con trac
7、t, P arty A shall pay to P arty B 40% of the total con tract price as the p roject adva nee p ayme nt;7天以內,甲方付給2.3 數據中心及網絡布線系統工程完工并且雙方簽訂工程驗收報告后 乙方合同總價的 55%,即Y 元;Data center project and network cabling systems engineering compieted and signed a project acce ptance report by both p arties with in 7 da
8、ys after, Party A shall pay to P arty B 55% of the con tract p rice.2.4 工程竣工后3個月內,甲方支付給乙方剩余的合同款,即Y 元;After the comp leti on of the p roject with in 3 mon ths, Party A shall pay to Party B the rema ining con tract p rice.3. 雙方職責Respon sibilities of the p arties3.1甲方職責:Respon sibilities of party A:a.
9、及時以書面形式通知乙方本工程具備開工條件的時間 ;Timely writte n no tice to Party B the con diti ons of this p roject have the time to start;b. 協助乙方辦理進駐施工現場所需人員證件、批件等有關手續;To assist Party B to en ter the con struct ion site personnel required docume nts, app roval docume nts and other releva nt p rocedures;c.為乙方提供現場工程辦公室和足夠
10、的現場倉庫;To P rovide on-site engin eeri ng office and sufficie nt field warehouse;d.積極協助乙方施工,協調施工時與各部門的配合,并負責提供工程所需的現場平面圖及 建筑結構圖。Actively assist Party B con struct ion, coord in ati on with various dep artme nts, and respon sible for p rovidi ng the n eeded for the p roject site plans and architectural
11、 draw in gs.e.及時按合同規定之付款進度向乙方支付工程款項。Timely accord ing to the terms of the con tract p ayme nt schedule to pay Party B p roject funds.3.2 乙方職責:Respon sibilities of party B:a.乙方在工程開始前應組織有關人員研究和熟悉圖紙,參與設計交底,安排施工總進度計 劃并提交給甲方;P arty B before the p roject beg ins shall orga nize releva nt personnel to stud
12、y and be familiar with draw in gs, in volved in the desig n work, arran geme nt of con struct ion gen eral schedule plan and submit to P arty A;b.向甲方或項目監理提供所購各種產品、設備的技術資料,接受進場檢驗;To the party A or p roject sup ervisi on to p rovide the pu rchase a variety of p roducts, equipment, tech ni cal in forma
13、ti on, acce pt entry inspection;c.遵守甲方或監理方對施工現場的有關規定;Abide by the party or the sup ervisi on on con struct ion site of the releva nt p rovisi ons;d.按時完成乙方所承擔的施工任務,保證工程施工質量。Timely compi eti on of con structi on tasks un dertake n by Party B, to en sure con struct ion quality.4. 施工與工程設計變更Con struct io
14、n and engin eeri ng desig n cha nge4.1乙方在施工中要根據國家頒發的施工驗收規范和質量檢驗標準,以及設計要求進行, 要求全部工程達到合格標準。On the con struct ion of Party B accord ing to the country issued con structi on acce ptance norms and quality insp ecti on sta ndards, as well as the desig n requireme nts, all p roject achieve the qualified st
15、a ndard.4.2在施工中,要堅持按照設計文件和施工圖紙施工,任何一方不得隨意變更設計,如出 現窩工、返工和材料損失,以及增加勞動力成本等,由于甲方的原因造成的,損失由甲方承 擔,由于乙方的原因造成的,損失由乙方承擔。During con struct ion, to adhere to the desig n docume nts and con structi on draw ings of the con struct ion, any party shall not be arbitrarily cha nged desig n, such as the emerge nee of
16、 idle ness, rework and loss of material, as well as an in crease in labor cost, as the party A 's cause, loss borne by the party A, the Party B causes, losses shall be borne by Party B.4.3在施工中,若甲方 A有變更設計文件的要求,應書面通知乙方;若乙方發現設計文件 有錯誤或嚴重不合理的地方,也應書面通知甲方,雙方商定并修改設計文件和圖紙后方可繼續施工。During the con struct ion
17、, if the party A to cha nge the desig n docume nt, shall give a writte n no tice to Party B; if Party B is found the desig n docume nts are wrong or serious un reas on able p lace, should also be written notice to Party A, both sides agreed and modify design drawings and docume nts before it can con
18、tinue to con structi on.4.4在施工過程中,如遇下列情況,需順延工期,雙方應及時進行協商,并通過書面形式 確定順延期限:In the pro cess of con structi on, in case of the follow ing circumsta nces, be exte nded p eriod, both p arties shall timely con sultati ons, and through the writte n form to determ ine the exte nsion of the time limit:a.因天災或人力
19、不能抗拒的原因被迫停工的;Because of n atural disaster or the manpo wer irresistible reas ons forced shutdow n;b.因甲方提出變更計劃或變更施工圖而不能繼續施工的;Because party A propo sed cha nges to the plan or cha nge the con structi on graph therefore cannot con ti nue con struct ion;c. 乙方不能按期供設備或所供材料或者設備不合規格要求,被迫停工或不能順利施工的;Party B f
20、ails to supply equipment or for the materials or equipment of differe nt sp ecificati ons, was forced to shut dow n or not smooth con struct ion;5. 竣工驗收與售后服務Final acce ptance and after-sales service5.1乙方必須嚴格執行隱蔽工程驗收制度,凡隱蔽工程完成后,必須經過驗收并作好記錄(隱蔽工程指墻內、吊頂內的管線施工等)。P arty B must strictly en force the hidde
21、n work system, where the hidde n work has bee n compi eted, must p ass inspection and make records (hidde n works refers to the wall, the ceili ng in side the pip eli ne con struct ion, etc.).5.2整體工程竣工后,乙方向甲方提交竣工文檔并提交書面驗收申請。甲方接到申請后日內組織有關人員按照合同內容和事先約定的驗收條款進行項目驗收,并出具雙方簽字的驗收報告。如甲方不能按期組織驗收,須提前通知乙方,并與乙方另
22、行商定驗收日期,但甲方必須承認乙方的竣工時間。甲方推遲驗收,其間所發生的管理費和各項損失均由甲方負擔。 如果提交驗收申請后一個月仍未能完成驗收,則以竣工之日作為系統的保修開始日期。When the whole p roject is compi eted, Party B shall submit to p arty A comp lete docume ntati on and submit a writte n acce ptance app licati on. Party A shall within 7 days after receivi ng the app licati on
23、orga nize releva nt personnel in accorda nee with the con tract contents and the p rescribed insp ecti on clause of project acceptance, and issue the report signed by both parties. If Party A fails to orga nize acce ptance, shall inform Party B in adva nee, and P arty B to be agreed date of acce pta
24、nce, but party A must ack no wledge party B compi etio n time. party A delayed acce ptance, duri ng which occurred in the man ageme nt fees and all losses shall be borne by Party A. If the submissi on of acce ptance app licati on one month after failed to comp lete acce ptance, the compi eti on date
25、 as the system warra nty start date.12個月。在質保期內,乙方應5.3工程驗收合格后進入質保期。質保期為驗收合格之日起 對系統除人為因素外的所有故障負責免費維修或更換。P roject after acce ptance into the warra nty p eriod. Warranty p eriod from the date of acce ptance of 12 mon ths. During the warra nty p eriod, Party B shall system in additi on to huma n factors
26、all fault is respon sible for free rep air or rep laceme nt.5.4在質保期內,乙方做到對甲方求援電話2小時內響應,8小時內抵達現場并著手解決問題。質保期結束后,乙方對系統進行有償維護。有償維護的費用由雙方協商。During the warra nty p eriod, P arty B shall do to help tele phone response withi n 2 hours, 8 hours to arrive at the scene and set about solv ing the p roblem. Afte
27、r the end of the warra nty p eriod, Party B on the system p aid maintenance. P aid maintenance costs through con sultatio n by the two p arties.6. 技術服務和培訓Tech ni cal service and trai ning6.1由乙方按技術培訓大綱負責對甲方的有關操作人員和維修人員進行使用級培訓。通過 培訓,使甲方的受訓人員能掌握系統設備的配置,能進行正確操作和日常維護及一般常見故障排查。接受培訓的人員由甲方確定,日期由甲乙雙方共同商定。P a
28、rty B accord ing to the tech ni cal training p rogram for P arty A 's op erators and rep air personnel to use class training. Through training, the trainees can grasp the party system equipment con figurati on, can correct op erati on and routi ne maintenance and com mon trouble shooting.Trained
29、 personnel were identified by the party A, the date mutually agreed by both parties.6.2 在保修期內,乙方提供兩次上門巡檢服務,包括各系統運行狀況的查看、記錄,以及必要的設備維護。During the warra nty p eriod, Party B shall p rovide two on-site inspection services, in cludi ng the status of system view, record ing, and the n ecessary equipment m
30、aintenance.6.3 乙方為甲方免費提供網絡綜合布線系統和數據中心的技術咨詢服務。Party B shall p rovide free n etwork cabli ng system and data cen ter tech ni cal advisory services.7. 違約責任The liability for breach of con tract7.1乙方提供貨物的質量或規格不符合合同約定,行業規格或政府的法令法規的要求的,甲方可以根據貨物的性質以及損失大小,要求乙方承擔修理,更換,退貨,減少價款等責任。Party B shall p rovide the qua
31、lity or sp ecificati ons of the goods does not conform to the con tract specifications, industry or government regulatory requirements, Party A may according to the n ature of the goods and the loss of size, B should bear the rep air, rep laceme nt, retur n, reduce cost.7.2 乙方除因受中華人民共和國合同法規定的不可抗力因素影
32、響外,如果未能按計劃 施工,則乙方在竣工之日前,每日應按甲方所支付合同款的1 %0(大寫:千分之一)賠償甲方損失。P arty B exce pt due to" P RC Con tract Law" p rovisi ons of force majeure factors, if the con struct ion not on schedule, the n Party B in the compi etio n date, daily should be p aid by P arty A con tract to 1 %o (in words: 1/1000)
33、 compen sati on for the loss of Party A.7.3 在履行合同過程中,如果乙方提前獲知有不能按時交貨或提供服務的情況,應及時以書面形式將不能按時交貨的理由、預期延誤時間通知甲方。 甲方收到乙方通知后, 認為其理由正當的,可酌情延長交貨時間。During p erforma nee of the con tract, if Party B know ahead of time has not delivered on time or to p rovide service, should be promp tly in writ ing of the reas
34、 ons for not delivered on time, an tici pated delay time notify party. Party A received notification, think its reason, could be appropriate to exte nd the time of delivery.7.4 若由于甲方更改設計需求、未確認材料或設備型號、未確認施工方案而導致設備訂貨 周期推遲,因此導致的延遲交貨,乙方不負擔任何責任。If due to Party A to cha nge the desig n dema nd, did not co
35、n firm material or equipment models, un recog ni sed con structi on scheme caused by equipment order cycle time delay, thus caus ing the delay of delivery, Party B does not bear any respon sibility.7.5甲方在合同規定的付款期限內未能及時付款,視為甲方違約。甲方每日按合同款項的 千分之一賠償乙方損失。Party A in the con tract p ayme nt p eriod failed
36、to timely p ayme nt, regarded as a breach of con tract.Party A accord ing to the con tract sum 1/1000 daily compen sati on for any loss of Party B.7.6甲乙任意方因第三者的原因造成違約的,應向對方承擔違約責任。Any P arty for the third party reas ons for default, shall be liable to the other p arty for breach.8. 合同的變更The modificat
37、i on of Con tract合同需在甲乙雙方公平協商, 達成一致的條件下進行變更, 變更的內容需以文字正本形式經 雙方授權人簽字并蓋章后生效。一切變更內容作為附件存在與合同正本具有相同的法律效力。Any modificati on must on the basis of fair n egotiati on and be acce pted by both sides. The formal file of modified con tract should be validat ing after sig ned and sta mped by authorized person of both sides. All cha nge to the content as an attachme nt with the
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 星級酒店集團管理辦法
- 血液中心全面質量管理體系建設及程序文件解讀
- 華為后備梯隊管理辦法
- 公廁建設后續管理辦法
- 水輪機增效優化技術-洞察及研究
- 傳播學領域的爭議、轉向及新聞傳播范疇探討
- 公益健康基金管理辦法
- 公文書寫中的字體規范與設計原則
- 安全生產八不傷害心得體會
- 世界文化遺產申報
- GB/T 18884.2-2015家用廚房設備第2部分:通用技術要求
- GB/T 12239-2008工業閥門金屬隔膜閥
- 軍標類型整理文檔
- 山東中醫藥大學2020-2021學年內科護理學試題及答案1
- DB32T 4174-2021 城市居住區和單位綠化標準
- 基本原理與性能特點多自由度電磁軸承課件
- Q∕SY 1836-2015 鍋爐 加熱爐燃油(氣)燃燒器及安全聯鎖保護裝置檢測規范
- 北京輸變電工程標準工藝應用圖冊(圖文并茂)
- 儀器使用記錄表
- 石河子大學化學化工學院學院綜合測評方案-理學院
- 《汽車電工電子技術》全套教案(完整版)
評論
0/150
提交評論