




下載本文檔
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、AAR Manual of Standards and Recommended PracticesSpecifications for Tank CarsCHAPTER 1 FINAL CLEAN 1.4 1.4.4M-10021.4 Procedures for Securing Approval1.4.1 GeneralParagraph 1.3.6 of this specification and U.S. Department of Transportation (DOT) and Transport Canada (TC) regulations require AAR Tank
2、Car Committee (Committee) approval of designs and materials used for the construction, conversion, alteration, or welded repair of tank car tanks. The Committee has delegated to the AAR Safety and Operations Department the authority on its behalf to approve applications provided that they have been
3、reviewed and deemed to be in accord with AAR, DOT, and TC requirements by an independent third party (ITP) that has been certified by the Committee in accord with Section 1.5.The AAR may elect to request a Committee ballot on any application for approval. In such case the AAR must inform the applica
4、nt within 10 business days including the date committee ballots are due.Applications for approval of pressure relief devices and other valves and fittings will continue to be approved by the Tank Car Committee in accord with paragraphs 1.4.5 and 1.4.6.Pressure relief devices and other valves and fit
5、tings require a service trial in accordance with paragraph 1.4.10.Approvals of pressure relief devices are valid for ten (10) years. They must be renewed in accordance with paragraph 1.4.91.4.1.1 Application SubmissionApplication packages must printed or legibly hand written. Packages are to be subm
6、itted to the: Executive Director, Tank Cars; Association of American Railroads; 425 Third Street, SW Suite 1000; Washington DC 20024.1.4.1.2 Application Fee1.4.1.2.1 Each application will be assessed a nonrefundable application fee of US $180, payable to the Association of American Railroads. This f
7、ee must be submitted with the original application to AAR, unless a deposit account has been previously established by the applicant. All transactions must include the application number(s) that the payment covers.1.4.1.2.2 In addition, applicants will reimburse the AAR for costs associated with the
8、 review of applications by an ITP. Deposit accounts established to cover costs of ITP application review will be reconciled on a periodic basis, and reports will be furnished to applicants on request.1.4.2 Approval of Tank Car Designs (Form AAR 4-2)1.4.2.1 To secure approval as required by paragraph
9、 1.3.6, applications for approval must be submitted to the Executive DirectorTank Car Safety using Form AAR 4-2, Application for Approval and Certificate of Construction. Form AAR 4-2 is reproduced in Appendix F of this manual in Fig. 1.1 with paragraph 4.2 containing instructions for its completion
10、. Aplications will be reviewed and evaluated by a certified ITP, selected by AAR staff from a list of contractors approved by the Tank Car Committee. Handling of applications is further described in paragraph 1.4.2.2.Blocks of application numbers will be provided by the Executive director to each bu
11、ilder. In the event a builder does not have an application number, they must request one from the Executive Director.1.4.2.1 Applications1.4.2.2.1 Applicants must submit two copies of the application package with one package for the AAR and one copy of the application package for the ITP. 1.4.2.2.2
12、Applications for approval of new construction should be submitted no later than 45 days prior to date that cars subject to the approval will be manufactured. Applications for alterations, conversions, welded repairs and duplicate approvals should be submitted no later than 45 days prior to date that
13、 cars subject to the approval will be manufactured.1.4.2.2.3 Applicant shall maintain a priority list of the applications with estimated start date of manufacture with the AAR.1.4.2.2.4 The ITP assigned by AAR staff will review the application for compliance with AAR and DOT/TC requirements and will
14、 deal directly with the applicant to resolve any discrepancies. The Director must receive copies of all correspondence related to resolution of questions on the application. The ITP will notify AAR when the application is satisfactory. The ITP is required to respond to either the applicant or AAR, a
15、s appropriate, within 21 days of receipt of the application. If a discrepancy leads to an application revision, the ITP is required to respond to the applicant or AAR within 14 days of receipt of the revised application.1.4.2.2.5 In the event that an ITP and the applicant cannot resolve discrepancie
16、s in an application and the ITP recommends against approval, the applicant may request Tank Car Committee review of the application in accord with the process outlined in paragraph 1.4.2.12.1.4.2.2.6 For new construction the applicant must be the tank car builder.1.4.2.2.7 For alteration, conversion
17、, or repair, the applicant must be the car owner or his designee, or the facility authorized to perform such work.1.4.2.2.8 To secure approval as required by paragraph 1.3.6, application for tank cars must be submitted by the applicant to the Tank Car Committee on Form AAR 4-2, Application for Appro
18、val and Certificate of Construction. All submitted materials must be marked with the number of the application for which they are submitted. Application package must include:· Form AAR 4-2,· Copy of all drawings referenced, · Material required by 4.2.1.8, 4.2.1.9 and 4.2.1 10 of Appen
19、dix F,· Supplemental information as applicable, and· Application fee per 1.4.1.2.1.4.2.3General Design Requirements All tank cars for which AAR Approval is requested must comply with the requirements in 1.1.3 and 1.1.4 of Chapter 1. Tank cars designed for gross rail loads in excess of 286,
20、000 lb on four axles must have the car structure approved by the Equipment Engineering Committee.Applications for increased truck capacity must be supported by justification (with calculations if necessary) to verify the structural adequacy of the car for increased capacity and braking requirements.
21、 1.4.2.3.1Application for approval of new tanks to be mounted on existing car structures must be accompanied by a statement that “Car structure complies with all requirements of the AAR Interchange Rules and is suitable for continued service.” Car life is based on the life of the under frame; this a
22、pplication will not extend its life.1.4.2.3.2Applications for conversion, alteration, or repair must indicate current specification, former lading, date built new, and previous certificate number(s) and must show specification and new commodity. Supply a supplemental sheet, if necessary, to associat
23、e the car numbers with their previous certificate numbers.1.4.2.3.3For applications covering welded repairs on tanks using procedures or materials that have not been previously approved, description of damage to tank, date, place, and circumstances of damage, together with proposed method of making
24、repairs, must also be submitted.1.4.2.3.4Reconditioning of bolted manway covers for tank cars covered by DOT179.100 to original design do not require approval, otherwise submit data on original construction, certificate numbers, and car specification, with drawing numbers used in original constructi
25、on. Application must include drawings and a detailed explanation of how repairs are to be made.Reconditioning of bolted manway covers for tank cars covered by DOT179.200 to original design do not require approval. Otherwise the conditions above apply.1.4.2.3.5Applications submitted by facilities oth
26、er than the tank fabricator for assembly of new tank cars must be accompanied by a statement that “Tank fabrication by certified facility (a currently certified Class A or B facility). Completed car will comply with all applicable AAR and DOT requirements.”1.4.2.3.6 If car designs, appurtenances, va
27、lves, fittings, or attachments may be declared by the Tank Car Committee to be subject to service trials before general acceptance for new construction of the cars or other devices. Such service trials and their restrictions must be identified by the applicant. Service trial numbers are assigned by
28、the Director. See Chapter 1 paragraph 1.4.10 .1.4.2.3.7DOT special permits, competent authorities (CAs) or Canadian equivilentcy certificates applicable to the car or commodity must be identified on the application. A copy of the latest revision must be submitted with the application.1.4.2.3.8Valves
29、 are to be identified by manufacturer, size, model, identification number, and approval on the drawings or application, whether or not supplied by the proponent.1.4.2.3.9The method of anchoring the jacket must be submitted with the application, if the car is so equipped.1.4.2.3.10 Applications for n
30、ew construction must include a drawing that indicates structural welds; such as, tank closure, tank to pad, and sill to pad welds; to be inspected during qualification. For jacketed cars, the drawing must include dimensions referenced to a visible area of the car. 1.4.2.4New and Untried TypesApplica
31、tions for approval of new and untried types of tank cars must be made to the Tank Car Committee and must include a completed Form AAR 4-2 with all drawings and data pertaining to the tank and appurtenances. Approval by the Tank Car Committee is required for completion of the Certificate of Construct
32、ion.Applications for approval of designs where the components of the car structure, whose primary function is to support loadings exclusive of internal tank pressure, are of a new and untried type as defined in Section 1.2.1 of AAR Specification M-1001, require approval of the Equipment Engi- neerin
33、g Committee. Applicant must submit a cover letter with 15 sets of applicable arrangement and detail drawings and other supporting data to the Executive Director for distribution to that committee.Applications for approval of designs where the brake equipment or its operation are of a new and untried
34、 type, as defined in Section 1.2.1 of AAR Specification M-1001, require approval of the Equipment Engineering Committee and the Braking Systems Committee. Applicant must submit a cover letter with 25 sets of brake arrangement drawings and other supporting data to the Executive Director for distribut
35、ion to the committees.When tests are conducted in support of new and untried cars designs or of cars incorporating changes of a new and untried type, tests must comply with paragraph 6.3 of this specification and/ or applicable chapters of Specification M-1001.The first tank cars produced by a new m
36、anufacturer or an new plant of a existing manufacturer are subject to a service trial.1.4.2.5Alteration, or Repair1.4.2.5.1 For alterations, or welded repairs using previously approved procedures and materials, an Exhibit R1 report in compliance with Appendix R must be submitted. After construction,
37、 changes in operating stencil and fittings changes only, must be reported on a Exhibit R-1. For alterations, or welded repairs using procedures or materials that have not been previously approved, an application must be submitted on Form AAR 4-2. Such applications will be handled as outlined in para
38、graph 1.4.2 and related subsections.1.4.2.5.2 Tank car repairs in accord with Appendix R requirements do not require 4-2 approval. Tank car repairs not in accord with Appendix R require 4-2 approval, if not previously approved. Description of tank damage to tank, date, place, and circumstances of da
39、mage, together with proposed method of making repairs, must also be submitted.1.4.2.5.3Tank cars must not be returned to service until submission of the report. Failure to submit required Exhibit R-1 report may be cause for action by the AAR1.4.2.6 ConversionFor conversions using previously approved
40、 procedures and materials, an application must be submitted on Form AAR 4-2 noted as a Duplicate Application. For conversions using procedures or materials that have not been previously approved, an application must be submitted on Form AAR 4-2. Such applications will be be handled as outlined in pa
41、ragraph 1.4.2 and related subsections.1.4.2.7 Approval of ApplicationsUpon confirmation from the ITP and any involved Technical Services Committee that an applica- tion is in good order, AAR will process the application for approval and so notify the applicant within 21 days of receipt approval from
42、 the ITP. The approved application will become the Certificate of Construction for the car or cars identified thereon when certified per paragraph 4.2 of Appendix F and serves as notice of approval to all parties.An application that the Executive Director or his designee has signed is authority to c
43、onstruct and operate cars subject to that approval.1.4.2.5 Committee ProcessApplications that are referred to the Tank Car Committee pursuant to paragraph 1.4.1 or para- graph 1.4.2.3 will be handled by mail ballot or at a scheduled committee meeting and will be approved by majority vote unless advi
44、sed by any member of the Committee or by AAR staff that approval appears to be in violation of the specifications or will represent a hazardous condition. In the event such advice is received, all com- mittee members will be notified, and those members previously voting to approve the application wi
45、ll be asked to reconsider their vote.A Committee member having comments on any application being considered must, within 15 days of receipt of the application, direct his or her comments to the applicant with copies to the balance of the Committee and to the Executive Director. The applicant must re
46、spond to Committee comments within 30 days, directing his or her response to each member of the Committee and to AAR staff. Failure to respond will be cause for disapproval of the application.Once an applicant has furnished all additional information requested in Committee comments, all Committee me
47、mber(s) initially commenting on the application must resubmit a ballot within 15 days of the applicants response. A Committee member having taken exception to an applica- tion and then approving it based on satisfactory applicant response to comments must direct approval to the Executive Director wi
48、th copies to the applicant and the balance of the Committee.If sufficient ballots to constitute action have not been received within 45 days from receipt of the application by AAR, staff will poll each member of the Committee to expedite response. AAR staff must notify the applicant of the status of
49、 his or her application within 60 days of receipt of the application. A written explanation must be provided for any application that is disapproved or held pending additional information.1.4.2.6 Disapproved Applications1.4.2.9.1 If an application is disapproved pursuant to action of the Tank Car Co
50、mmittee, the applicant may, by written notice to the Executive Director, petition the Committee for review of the application at a regular or special meeting of the Committee to be held not later than 90 days from receipt of the notice. The applicant must attend any such meeting and will be granted
51、the right to present additional information is support of the application. AAR must notify the applicant of the action of the Committee within seven business days following the meeting.1.4.2.9.2 If tank cars covered by formally disapproved applications are subsequently offered for interchange servic
52、e, the Executive Director will notify all AAR member railroads and appropriate movement restrictions will be placed in the UMLER file.1.4.3 Certificate of Construction for Tank Car Tank, Equipment, and Complete Car1.4.3.1 See DOT 179.5. The Certificate of Construction is the lower portion of Form AAR 4-2. After receipt of the approved applicati
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 工業自動化技術發展現狀
- 工業遺產改造為文化創意產業園的實踐
- 工作場所優化與管理創新
- 工業設計與產品創新策略探討
- 工作中的安全意識與防護技能
- 工程招標投標與合同管理
- 工作場合的手機使用禮儀
- 工廠布局規劃與優化方法
- 工廠機械設備的安全管理
- 市場分析與預測方法探討
- 《哈爾濱工程大學學報》模板
- DB14T 1049.1-2020 山西省用水定額 第1部分:農業用水定額
- 二、施組報審表
- 配載平衡基礎培訓
- 醫療廢物管理相關法律、法規介紹
- 漯河醫學高等??茖W校輔導員招聘考試行政管理教師崗筆試面試歷年真題庫試卷
- 政審在校證明
- 變電站一次通流-通壓試驗方法的探討與實踐
- 線槽燈安裝施工工法
- 自由公差對照表(共3頁)
- 約克YS螺桿式冷水機組_《操作手冊》6-3
評論
0/150
提交評論