


下載本文檔
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、產品購銷合同(PURCHASE CONTRACT)甲方(買方)Buyer乙方(賣方)Supplier :買賣雙方同意成交下列產品訂立條款如下The un dersig ned Seller and Buyer agree follow ing tran sact ion, terms and con diti ons are specified as below:第一條定購產品:Art.1 Ordered products:第二條質量要求及技術標準:Art. 2 Quality requireme nts and tech ni cal specificati ons:2.1按照本合同第一條約
2、定的規格生產產品,質量標準按照生產廠商技術標準。2.1 In accordance with prescribed products description of Art.1, the quality standard is based on manu facturer 'chni cal sta ndard.第三條發貨時間和發貨方式:Art. 3 Delivery time and terms of shipment:3.1發貨時間:3.1 Lead Time: 3.2 發貨方式:3.2 Terms of shipment:第四條付款方式:Art. 4 Terms of payme
3、nt:第五條收貨和驗收條款:Art. 5 Goods recepti on and accepta nce:5.1驗收標準:按照本合同第二條約定的質量要求及技術標準。5.1 Accepta nce criteria: accord ing to the Art. 2 Quality requireme nts and tech ni cal specificati ons of the prese ntcon tract第六條違約責任:Art. 6 Liability for breach of con tract:6.1甲方延期付款的,乙方交付產品的時間可相應順延,甲方按照延期支付金額的0.
4、5% /日向乙方支付滯納金,直至款項付清之日。 甲方延期支付超過三十日的,乙方有權選擇解除合同,甲方按照合同滯納金標準向乙方支付違約金(支付至乙方提出解除日),向乙方返還產品,甲方已經支付的款項作為賠償,如不足以彌補乙方的損失的,由甲方另行賠償。6.1 Should Party A postp one payme nt. Party B has right to delay shipme nt date; Party A should co n seque ntly pay late fees of 0.5% per day of the con tract amount to party B
5、 till date of full payme n t. Should party A defers payme nt over 30 days, party B may dissolve the con tract and Party A, acc ording to above stipulated late fees rate, should pay Party B liquidated damages (until dissolution date released by party B) and Party A should retur n the goods to Party B
6、. Actual amount paid by p arty A is con sidered as a compe nsati on to Party B; party A should compe nsate the loss of party B additi on ally if above said compe nsati on is not able to cover all the damage caused.6.2乙方按照本合同約定的時間、地點、質量要求和技術標準向甲方提供定購產品,如延期 交付的,按照未交付產品金額的0.5% /日向甲方支付滯納金。因乙方延期到貨給甲方造成的損
7、失由乙方賠償。(因甲方未按期支付價款導致延期交貨的除外)6-2 Party B should provide ordered goods to party A based on lead time, place, quality requireme nts and tech ni cal specificatio ns stipulated on the prese nt con tract. Late fees, charged to party B, of 0.5% per day will be applied on values of goods overdue. Compe nsat
8、i on of loss & damage caus ed by late delivery should be chargedto party B. (except late shipme nt due to overdue payme nt b y party A)6.3甲方未按合同約定收貨或無正當理由提出異議拒絕收貨的,乙方將產品運輸至交貨地點 之日視為甲方收到貨物和驗收合格的時間,由此造成的損失由甲方負責。6.3 Should party A fails to receive goods or refuse receiving goods delivered without j
9、ustified or v alid reas on, the day whe n goods shipped to stipulated locatio n will be con sidered as the day of re cepti on and accepta nee, party A is resp on sible for loss & damage caused.第七條 不可抗力:Art. 7 The force majeure:戰爭、動亂、瘟疫、地震、臺風、洪水、物體墜落或其他非合同雙方責任造成的爆炸、火災、意外事故和自然災害。任何一方由于不可抗力原因不能履行合同
10、時,應在不可抗力事件發生后3日內通知對方,盡力減少損失。不可抗力造成的損失,由雙方自行承擔。Definition: war, unrest, plague, earthquake, typhoon, flood, falling objects or any other explosion, fire, accidents and natural disasters which are excluded by both parties r6sponsibilities of the pr ese nt con tract. Should one party is un able to fulf
11、ill the con tract due to the force majeure, the par ty concerned should inform the other party in 3 days from the date of the event and should try all means to reduce loss caused. The damage caused by the force majeure should be born by each p arty 'wn risk.第八條 爭議解決: Art. 8 Dispute resolutions:雙
12、方發生爭議的,應協商解決,協商不成的,由非第一和第二方所在地有管轄權的人民法 院裁決。 All even tual disputes should be settled through frien dly n egotiati on. If con sultati on fails, arb itrati on should be settled by a jurisdicti on court located in a country other tha n both parties ' on es.第九條 其他:Article 9 Miscellanea:9.1雙方應對合同履行過程
13、中的技術信息和商業秘密承擔保密責任,如因任何一方未盡此義 務導致他方經濟損失,應予賠償。9.1 Both parties are resp on sible to maintain con fide ntiality regard ing all tech ni cal and commercia l information. Economic losses caused by lack of fulfillment of the duty should be compensated b y the party concerned. 9.2本合同未盡事宜或合同變更,經雙方協商一致后簽訂補充合同, 效力與本合同一致。9.2 Any modificati on or compleme ntary clauses to the prese nt con tract should be n egotiated and ame ndedwh
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025至2030年中國實木兒童衣架行業投資前景及策略咨詢報告
- 2025至2030年中國土絲行業投資前景及策略咨詢報告
- 2025至2030年中國充氣攀巖跑道行業投資前景及策略咨詢報告
- 閱讀實訓室管理制度
- 露天菜市場管理制度
- 非資金入庫管理制度
- 黑校車排查管理制度
- 贛州師范高等??茖W校《主項理論與實踐(五)》2023-2024學年第二學期期末試卷
- 三明學院《慧眼識雜草喂鹿尋童趣》2023-2024學年第二學期期末試卷
- 朔州師范高等??茖W校《思想政治教育學原理》2023-2024學年第二學期期末試卷
- 七年級課外名著閱讀知識競賽試題及答案
- 贛美版八年級美術下冊《第5課 產品包裝設計》教學設計
- 中國血脂管理指南理論知識考核試題及答案
- 村級積分制管理
- Nikon尼康D3100中文說明書
- 國家開放大學2024春《1494員工勞動關系管理》期末考試真題及答案-開
- DBJ∕T 13-234-2024 不發火建筑地面應用技術標準
- 2024年安徽省高考政治+歷史+地理試卷(真題+答案)
- 2024年新疆中考地理真題卷及答案
- 人教版初三物理總復習電學專題復習教學設計
- 項目風險記錄及跟蹤表
評論
0/150
提交評論