




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、west london partnership !0th february 2011 agenda item 3 high speed 2 (hs2) briefing issues and opportunities report by mva consultants for wlp 1.1.1 on 21st december 2010 the government announced the proposed route of hs2 between london euston and birmingham as a first phase of the national high-sp
2、eed rail network. public consultation on the route and on the governments strategy for high speed rail is due to start at end february 2011; the consultation period will be 5 months. the timeline for construction has not yet been advised by the government.1.1.2 plans of the route through west london
3、 are attached. from the east, the route includes a below-ground-level station at old oak common providing a connection to crossrail, with hs2 emerging to at-grade level at north action and then aligned on the north side and adjacent to the central line and then the chiltern line to west ruislip. wes
4、t of west ruislip the route departs north westwards from the chiltern line. 1.1.3 hs2 will have new bridges over roads, rivers and canals and the lul line at ruislip. there will be a new retaining structure between northolt and south ruislip. the london to west midlands report notes that the recomme
5、nded option at northolt/south ruislip is to lower the hs2 line and raise the chiltern line on a new alignment including a viaduct. the government announcement notes that this will move the alignment slightly further away from housing.1.1.4 the government also plans a spur route to heathrow airport r
6、unning at ground level close to the m25 form part of its length as a second phase of the network. government has asked hs2 ltd “to carry out further work on such a spur route with a view to public consultation later in this parliament alongside the routes to manchester and leeds.” some construction
7、work for the spur would be included in phase 1 such as an underbridge and a length of retaining wall at northolt.1.1.5 a direct connection to hs1, the channel tunnel line to europe, is also planned. this will be via a new tunnel from old oak common to the north london line near chalk farm, from wher
8、e existing infrastructure can be used to reach the hs1 line north of st pancras1.1.6 when the consultation is launched, the government “will also publish a revised business case; a full appraisal of sustainability; noise contour maps; and route visualisations; all of which can only be completed now
9、that the final preferred route for consultation has been determined” (from ministers statement). 2 key issues for west london2.1.1 these key issues can be categorised as:n environmental and social concerns, construction plans and property impactsn regeneration and economic opportunitiesn connectivit
10、y and accessibility improvements2.1.2 some borough draft lips have included comments on hs2 and these are listed in appendix 2.2.2 environmental and social concerns, construction plans and property impacts2.2.1 the hs2 construction plans will affect adjacent land and infrastructure and will have imp
11、acts on properties in the boroughs of ealing, hillingdon, hammersmith and fulham and potentially also brent. the 2009 arup route engineering report states that: “this would necessitate land take to the north of the rail corridor, and this would affect both industrial and residential properties. in m
12、ost areas the additional width required would be less than 10m.” “l(fā)and take would be minimised by the extensive use of retaining walls, but some acquisition of residential property (generally gardens) and industrial property would be inevitable”. 2.2.2 the report also states that: “in order to mitig
13、ate the noise created by hs trains, hs2 ltd agreed to limit the maximum line speed locally to 250kph”. 2.2.3 the impacts will be felt particularly lb ealing for properties at hanger lane and in greenford, perivale and northolt close to the line. the more recent route alignment drawings showing the r
14、ecommended option at northolt/ south ruislip have been adjusted from those shown in the 2009 arup report. in the case of ealing, the northolt corridor has been reduced in width from 22m to 16m and the alignment adjusted in parts to move away from housing (a definite improvement). for lb hillingdon t
15、he impacts will be felt particularly in south ruislip, ruislip gardens and west ruislip close to the line.2.2.4 several bridges will need to be rebuilt and existing stations remodelled/modified.2.2.5 the environmental and social impacts cannot yet be determined in detail. no doubt, the consultation
16、documents will contain more detailed information on the route enabling these impacts to be assessed.2.3 regeneration and economic opportunities2.3.1 the direct regeneration opportunities are at old oak common in the borough of hammersmith and fulham near the new hs2 and crossrail stations. nearby si
17、tes within park royal will benefit; this will affect the borough of hammersmith and fulham, brent and ealing. there may also be regeneration benefits for kensal green in rb kensington and chelsea.2.3.2 the new stations may also bring economic benefits for areas further away from old oak common parti
18、cularly in the boroughs of hammersmith and fulham, brent and ealing.2.3.3 the lb hammersmith and fulham communications briefing note refers to the station at old oak being named park royal international and states that “10,000 new homes and 5,000 new jobs will be created at old oak an area which is
19、crying out for a boost with unemployment well above the national average and poor access to housing and other services a major problem for local people”. the note also states that: “the area within 2km of old oak contains some of the most deprived communities in england”.2.4 connectivity and accessi
20、bility improvements2.4.1 there will be the direct benefit of improved connectivity of all of west london to the west midlands (and beyond) and to europe and of improved accessibility to crossrail for residents and businesses close to the new station at old oak common.2.4.2 much greater connectivity
21、and accessibility benefits will be achieved if transport for london plans, described in the west london subregional transport plan, are implemented. these plans involve direct interchange at old oak common with the west london and north london lines and new passenger links to hounslow and to brent c
22、ross. this would improve journey-time access between west london and both south and north london. it would also improve journey-time access within west london particularly for orbital movements between locations in the boroughs of harrow, brent, ealing, hammersmith and fulham, hillingdon and hounslo
23、w. 2.4.3 but there is a concern raised by lb brent that a new station at old oak common could become a barrier to addressing the issues facing brent residents rather than an opportunity.2.4.4 a further benefit of the greater connectivity and accessibility would be a switch from car to public transpo
24、rt for journeys from south and north london to key destinations in west london including heathrow. this would result in reduced highway congestion, pollutants and carbon emissions in west london.2.4.5 a figure illustrating this connectivity, taken from the west london subregional plan (figure 2.9),
25、follows.note: hs2 shown in bluecrossrail and great western rail shown in brownlocal rail lines shown in orange2.4.6 appendix 1 key documentskey relevant documents to date are listed below. the first five can be found on the hs2 website:n government announcement of hs2 proposed route for consultation
26、, 21st december 2010n ministers statement to house of commons of 21st december 2010n options for connection to the heathrow airport area, final report, arup, 2010n london to the west midlands and beyond, confirming the line of route: supplementary report, 3rd december 2010n route engineering study f
27、inal report: a report for high speed two ltd, arup, 2009n lb hammersmith and fulham communications briefing note of 20th december 2010appendix 2 borough draft lipslb brentlb brents draft lip includes this objective and follows with further comments and a concern:“objective 3: securing benefits from
28、hs2. (i) to support the development of the new high speed rail link between london, the west midlands and the north of england - high-speed 2 (hs2). particularly, to secure the benefits to brent regarding a new interchange station with crossrail/hs2 - at old oak common - are maximised by way of a su
29、b-surface travellator linking to willesden junction station, near harlesden town centre.”“hs2 / old oak common and willesden junction station. there are significant benefits to be reaped by brent in relation to hs2 and a new interchange at old oak common. presently there are two main issues, in the
30、short to medium term the onus is on improving the poor conditions at the station & environs. longer term, the issues relate to the (potential) barriers and maximising the opportunities to brent associated with old oak common proposals at present, there is a rail connectivity team; looking at (i) new
31、 station to west (acton wells) connecting down onto ooc hub (this would connect with the north london line and provide the dudden hill line opportunity) and (ii) shifting north london & west london lines to a new station next to hs2. all this is very early days but, at present, officers can see litt
32、le sign of hs2 or tfl prioritising access for brent residents (currently provided for by willesden junction). this is of significant concern to the borough and we will strive to ensure that the project brings about ease of access via willesden junction. ultimately, there is a risk that a new station
33、 at old oak common could become a barrier to addressing the issues facing brent residents rather than an opportunity.” lb harrowlb harrows draft lip comments:“specifically, harrow will be working with other west london boroughs and tfl to do the following: consider the impact of high speed 2 (hs2) r
34、ail connections to heathrow and the potential interchange with crossrail at old oak common or iver parkway. if old oak common is the selected interchange location, then a further crossrail station would be needed at the station. west london including harrow favours the interchange at old oak common
35、which will have significant benefits for the whole area.”lbs ealing, hounslow and hillingdoni could not find reference to hs2 or old oak common in the lb ealing and hounslow draft lips. the lb hillingdon draft lip mentions hs2 as a major transportation infrastructure proposal but does not comment on its impact. lb hammersmith and fulhamlb hammersmith and fulhams draft lip sets out its objective for regeneration areas and comments further:support sustainable population and employment growth in the five regeneration areas - white city opportunity area, north fulham regeneration
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 內(nèi)部股權(quán)轉(zhuǎn)讓協(xié)議文件
- 某商超社區(qū)協(xié)作制度
- ××中學(xué)防疫物資儲(chǔ)備辦法
- 傳承文化弘揚(yáng)民族精神6篇范文
- 2025年車用電池項(xiàng)目規(guī)劃申請(qǐng)報(bào)告模板
- 2025年評(píng)茶員(高級(jí))考試試卷:茶葉市場(chǎng)調(diào)研與品牌競(jìng)爭(zhēng)力分析
- 2025年院前急救信息系統(tǒng)項(xiàng)目申請(qǐng)報(bào)告
- 2025年成人高考《語文》古詩詞鑒賞經(jīng)典名篇分析試題庫
- 旅游業(yè)導(dǎo)游工作證明及收入說明(8篇)
- 2025年賽力皮革染料項(xiàng)目規(guī)劃申請(qǐng)報(bào)告
- 第九章 西半球的國(guó)家 單元教學(xué)設(shè)計(jì)-2023-2024學(xué)年七年級(jí)地理下學(xué)期人教版
- 湖南長(zhǎng)沙四大名校系丘班選拔試題
- 病案管理法律法規(guī)課件
- 七年級(jí)數(shù)學(xué)下冊(cè) 第二學(xué)期 期末測(cè)試卷(蘇科版 2025年春)
- 高級(jí)私人馬術(shù)俱樂部會(huì)員權(quán)益協(xié)議
- 政務(wù)服務(wù)窗口人員培訓(xùn)
- 農(nóng)村自建房流程
- 2025年江蘇南京河西新城區(qū)國(guó)有資產(chǎn)經(jīng)營(yíng)控股集團(tuán)招聘筆試參考題庫附帶答案詳解
- 云南錫業(yè)職業(yè)技術(shù)學(xué)院《影視劇配音》2023-2024學(xué)年第一學(xué)期期末試卷
- 《路徑規(guī)劃算法》課件
- 弱電工程施工方案和施工措施
評(píng)論
0/150
提交評(píng)論