




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
鐵道機(jī)車專業(yè)教學(xué)資源庫吉林鐵道職業(yè)技術(shù)學(xué)院主講:王顏明DesignLiaisonMeeting
JT56ACe-Underframe&Carbody底架與車體FiniteElementAnalysis–JT56ACeLocomotive機(jī)車的有限單元分析
DesignLoadCases 設(shè)計(jì)載荷
UnderframeStructureAnalysis`車底架結(jié)構(gòu)分析
CarbodyStructureAnalysis 車體結(jié)構(gòu)分析
DesignLoadCases
設(shè)計(jì)載荷YieldLoadCases 屈服載荷1gVertical+2670kNBuffLoad1gVertical+2670kNDragLoadCrowbarTorque(T=327,619.85N-m)1gVertical+/-3gLongitudinal1gVertical+/-1.5gLateral2gVerticalEMDEngineFootLoadCasesBogiesinterfaceloadsatunderframeattachmentslocationsFatigueLoadCases 疲勞載荷MeanTorque(T=46802.836N-m)1gvertical+(+/-).25gvertical)+(+/-).5glateral1gvertical+(+/-).25gvertical)+(+/-).5glongitudinal1gvertical+(+/-)0.35gverticalDesignLoadCases設(shè)計(jì)載荷HarmonicLoadCases 諧波載荷EngineFootForcesat17.5HzCrashAnalysisLoadCases(GB6770-2000,EMD) 碰撞分析的載荷CollisionPostLoads(300kN)Anti-ClimberLoads(445kN)CowCatcherLoadsCabInterlockLoadsVibration
振動(dòng)DynamicperformanceshouldcomplyTB/T2360VibrationperformanceofequipmentshouldcomplyGB/T5913RideQuality,Durability
乘車的舒適RideQuality(Cab)asperTB-T2360-93FSSZ,1,LEFT/RIGHTFSSZ,2,LEFT/RIGHTFSSZ,3,LEFT/RIGHTFSSZ,4,LEFT/RIGHTFCBLX,1,LEFT/RIGHTFCBLX,2,LEFT/RIGHTFCOUPLERXUnderframe&BogieInteractionLoads車底架與轉(zhuǎn)向架相互間的載荷
DesignLoadCases設(shè)計(jì)載荷Secondaryyawdamperfatigueload:FSYD
=30kNDamperloadis28kNat0.3m/sSecondarylateraldamperfatigueload:FSYD
=25kNDamperloadis20kNat0.3m/sSecondarylateralstoploadfatigueload:FSLS
=70kNCarbodyof110,000kgat0.2g reducedby80kNforspringshearloadSecondarylateralstoploadyieldload:FSLS
=150kNCarbodyof110,000kgat0.35g
reducedby80kNforspringshearloadSecondaryyawstopload:FSYS
=70kNUseloadoflateralstopUnderframe&BogieInteractionLoads車底架與轉(zhuǎn)向架之間的相互作用力DesignLoadCases
設(shè)計(jì)載荷DesignLoadCases
設(shè)計(jì)載荷ENGINEGENIdentificationofloadsU/FTest-Fzload@EngFrLeDesignLoadCases
設(shè)計(jì)載荷ForceIdentificationTeston16HEngine-1stOrder 16H柴油機(jī)試驗(yàn)中測(cè)試得到的力DesignLoadCases
設(shè)計(jì)載荷Engine&GeneratorSupportFootForces(N)FromTestData根據(jù)試驗(yàn)數(shù)據(jù)獲得柴油機(jī)和發(fā)電機(jī)支座的作用力
DesignLoadCases
設(shè)計(jì)載荷YieldLoadCasesbasedEngineMass:柴油機(jī)質(zhì)量的屈服載荷
1gVerticaland3gLongitudinal1gVerticaland1.5gLateral2gVertical
EMDEngineFootLoadCases 柴油機(jī)支座載荷SpecialYieldLoadCases:
特殊的屈服載荷
EdgeLoad:88964N(20000lbs)oneachpadinY-direction)ThermalLoad:111205N(25000lbs)oneachpadinX-direction)ClampLoad:0.127mm(0.005inch)inz-directiononouteredgeofpadFatigueLoadCases:
疲勞載荷
MeanEngineTorque
VibrationForces
1gvertical+(+/-).25gvertical)+(+/-).5glateral1gvertical+(+/-).25gvertical)+(+/-).5glongitudinal1gvertical+(+/-)0.35gverticalUnderframeStructuralAnalysis車底架結(jié)構(gòu)的分析EngineSupport
柴油機(jī)支座
GeneratorSupport 發(fā)電機(jī)支座
CabRearIsolatorSupport 司機(jī)室后部減振器的支撐
CollisionPost
防撞裝置
Anticlimber 防爬裝置
Cowcatcher
排障裝置
BatteryBox
電池箱
DB/ECStructure 電阻/電器室
FanHatchStructure 冷卻風(fēng)扇安裝蓋
EngineHatch
柴油機(jī)室頂蓋
RadiatorHatch 散熱器頂蓋
WaterTank
水箱
PhaseModuleRack 逆變器模塊支架UnderframeStructuralAnalysis車底架結(jié)構(gòu)分析FiniteElementModelofEngineSupportStructure柴油機(jī)支座結(jié)構(gòu)的有限單元模型UnderframeStructuralAnalysis車底架結(jié)構(gòu)的分析YieldLoadCase1:1gV+3gLongMaterialYieldLimit=325Mpa,DesignLimit=100MpaMaximumequivalentstress=98.8MpaFiniteElementAnalysisofEngineSupportStructure(YieldLoadCases) 柴油機(jī)支座結(jié)構(gòu)的有限單元分析(3GX軸向載荷+1G垂直載荷)UnderframeStructuralAnalysis車底架結(jié)構(gòu)分析YieldLoadCase2:1gV+1.5gLongMaterialYieldLimit=325Mpa,DesignLimit=100MpaMaximumequivalentstress=102MpaFiniteElementAnalysisofEngineSupportStructure(YieldLoadCases)柴油機(jī)支座結(jié)構(gòu)的有限單元分析(1.5G橫向載荷+1G垂直載荷)UnderframeStructuralAnalysisYieldLoadCase3:2gVMaterialYieldLimit=325Mpa,DesignLimit=100MpaMaximumequivalentstress=56MpaFiniteElementAnalysisofEngineSupportStructure(YieldLoadCases)柴油機(jī)支座結(jié)構(gòu)的有限單元分析(2G垂直載荷)UnderframeStructuralAnalysisFiniteElementAnalysisofEngineSupportStructure(SpecialLoadCases)柴油機(jī)支座結(jié)構(gòu)的有限單元分析(特殊邊緣載荷)SpecialLoadCase1:EdgeLoad88,964N(20000lbs)inY-directionMaterialYieldLimit=325MPaMaximumequivalentstress=28MPaUnderframeStructuralAnalysis車底架結(jié)構(gòu)分析FiniteElementAnalysisofEngineSupportStructure(SpecialLoadCases)柴油機(jī)支座結(jié)構(gòu)的有限單元分析(特殊的熱載荷)SpecialLoadCase2:ThermalLoad111,205N(25000lbs)inX-directionMaterialYieldLimit=325MPaMaximumequivalentstress=34MPaUnderframeStructuralAnalysis車底架結(jié)構(gòu)分析FiniteElementAnalysisofEngineSupportStructure柴油機(jī)支座結(jié)構(gòu)的有限單元分析---匯表UnderframeStructuralAnalysis車底架結(jié)構(gòu)分析FiniteElementAnalysisofEngineSupportStructure(FatigueLoadCases)柴油機(jī)支座結(jié)構(gòu)的有限單元分析(疲勞載荷)FatigueLoadSet1:MeanEngineTorque
VibrationForcesSubLoadcase1:MeanEngineTorque+VibrationForces
MaterialYieldLimit=325MPaMaximumequivalentstress=37MPaUnderframeStructuralAnalysis
車底架結(jié)構(gòu)的分析FiniteElementAnalysisofEngineSupportStructure(FatigueLoadCases)柴油機(jī)支座結(jié)構(gòu)的有限單元分析(疲勞載荷)FatigueLoadSet1:MeanEngineTorque
VibrationForcesSubLoadcase2:MeanEngineTorque-VibrationForces
MaterialYieldLimit=325MPaMaximumequivalentstress=26MpaUnderframeStructuralAnalysis車底架結(jié)構(gòu)的分析FiniteElementAnalysisofEngineSupportStructure(Fatigue)柴油機(jī)支座結(jié)構(gòu)的有限單元分析(疲勞載荷)UnderframeStructuralAnalysis
車底架結(jié)構(gòu)分析BoltLoadsforGeneratorPadStructure
發(fā)電機(jī)緩沖墊的螺拴載荷UnderframeStructuralAnalysis 車底架結(jié)構(gòu)的分析StressAnalysisofGeneratorPadStructure(1gVertical+3gLongitudinal)發(fā)電機(jī)緩沖墊結(jié)構(gòu)的應(yīng)力分析(3GX軸向+1G垂直)MaximumDisplacement:0.193mmMaximumEquivalentStress:47.3MPaUnderframeStructuralAnalysis車底架結(jié)構(gòu)分析StressAnalysisofGeneratorPadStructure(1gVertical+1.5gLateral)發(fā)電機(jī)緩沖墊結(jié)構(gòu)的應(yīng)力分析(1.5G橫向+1G垂直)MaximumDisplacement:0.118mmMaximumEquivalentStress:29.6MPaUnderframeStructuralAnalysis 車底架結(jié)構(gòu)的分析StressAnalysisofGeneratorPadStructure(2gVertical)發(fā)電機(jī)緩沖墊結(jié)構(gòu)的應(yīng)力分析(2G垂直載荷)MaximumDisplacement:0.146mmMaximumEquivalentStress:44.3MPaUnderframeStructuralAnalysis 車底架結(jié)構(gòu)的分析CabRearIsolatorSupportStructure司機(jī)室后部減振器支座結(jié)構(gòu)Fx=43,870N(3gLongitudinal)Fy=21,940N(1.5gLateral)Fz=19,500N(2gVertical)VonMisesStress=85MpaUnderframeStructuralAnalysis車底架結(jié)構(gòu)分析UnderframeSecondarySupportStructure
車底架二系彈簧支撐結(jié)構(gòu)LocalShellModel局部有限單元模型Displacement=1.34mmFz=274,250N(2gVertical)UnderframeStructuralAnalysis 車底架結(jié)構(gòu)分析家VonMisesStress=110MpaVonMisesStress=82MpaSubModelingUnderframeSecondarySupportStructure車底架二系彈簧支撐結(jié)構(gòu)
UnderframeStructuralAnalysis 車底架結(jié)構(gòu)分析Fz=274,250N(2gVertical)UnderframeStructuralAnalysis 車底架結(jié)構(gòu)分析DisplacementVonMisesStressCBTractionRodLoad:150KNin–VeX-Direction車體牽引桿載荷:150KNX軸反方向CBTractionRodLoad:150KNin+VeX-Direction車體牽引桿載荷:150KNX軸正方向Displacement位移VonMisesStress相當(dāng)應(yīng)力UnderframeStructuralAnalysis 車底架結(jié)構(gòu)分析SecondaryYawDamperLoad:30KNonface抗蛇形減振器DisplacementVonMisesStressUnderframeStructuralAnalysis
車底架結(jié)構(gòu)分析LiftingofLocomotivewith1.5gV=412KN機(jī)車起升座DisplacementVonMisesStressUnderframeStructuralAnalysis 車底架結(jié)構(gòu)分析CarBodyJackingwith1.5gV=242.25KN車體架車支撐座
DisplacementVonMisesStressUnderframeStructuralAnalysis 車底架結(jié)構(gòu)分析UnderframeStructuralAnalysis 車底架結(jié)構(gòu)分析Figure1. StressDistributionofCollision-Anti-ClimbStructureunder CollisionLoadof300kN.防爬裝置碰撞時(shí)應(yīng)力分布(30KN碰撞力)
(MaximumVonMisesStress=248MPa)UnderframeStructuralAnalysis車底架結(jié)構(gòu)分析Figure2. StressDistributionofCollision-Anti-ClimbStructureunderAnti-ClimbLoadof443kN.防爬裝置碰撞時(shí)應(yīng)力分布(443KN力)
(MaximumVonMisesStress=340MPa)UnderframeStructuralAnalysis車底架結(jié)構(gòu)分析Figure3. StressDistributionofCollision-Anti-ClimbStructureunder Anti-ClimbLoadof443kN.防爬裝置碰撞時(shí)應(yīng)力分布(443KN力)
(MaximumVonMisesStress=319MPa)UnderframeStructuralAnalysis底架結(jié)構(gòu)分析Figure4. StressDistributionofCollision-Anti-ClimbStructureunder Anti-ClimbLoadof443kN.防撞防爬裝置在443KN載荷下的應(yīng)力分布
(MaximumVonMisesStress=284MPa)UnderframeStructuralAnalysis底架結(jié)構(gòu)分析Figure5. StressDistributionofCollision-Anti-ClimbStructureunder Anti-ClimbLoadof443kN.防撞防爬裝置在443KN載荷下的應(yīng)力分布
(MaximumVonMisesStress=305MPa)UnderframeStructuralAnalysis底架結(jié)構(gòu)分析Figure6. StressDistributionofCollision-Anti-ClimbStructureunder Anti-ClimbLoadof443kN.防撞防爬裝置在443KN載荷下的應(yīng)力分布
(MaximumVonMisesStress=259MPa)UnderframeStructuralAnalysis底架結(jié)構(gòu)分析Figure7. StressDistributionofCollision-Anti-ClimbStructureunder CabSpringLoadof38kN.防撞防爬結(jié)構(gòu)在司機(jī)室
在38KN彈簧載荷下的應(yīng)力分布
(MaximumVonMisesStress=65.8MPa)UnderframeStructuralAnalysis底架結(jié)構(gòu)分析Figure8. StressDistributionofCollision-Anti-ClimbStructureunder CabLateralLoadof70kN.防撞防爬結(jié)構(gòu)在司機(jī)室在70KN橫向載荷下的應(yīng)力分布
(MaximumVonMisesStress=164MPa)UnderframeStructuralAnalysis底架結(jié)構(gòu)分析Figure9. StressDistributionofCollision-Anti-ClimbStructureunder CabInter-LokLoadof250kN.防撞防爬結(jié)構(gòu)在司機(jī)室Inter-lok250KN下的應(yīng)力分布
(MaximumVonMisesStress=389MPa)UnderframeStructuralAnalysis底架結(jié)構(gòu)分析CowCatcher排障器UnderframeStructuralAnalysis底架結(jié)構(gòu)分析Figure1. StressDistributiononCowCatcherStructureunder LongitudinalLoadof140kN.排障器縱向受力在140KN的應(yīng)力分部
(MaximumVonMisesStress=263MPa)UnderframeStructuralAnalysis底架結(jié)構(gòu)分析BatteryBox電池箱UnderframeStructuralAnalysis底架結(jié)構(gòu)分析Figure2. FEAResultofBatteryandRe-railerBox.Battery&Re-railer箱體有限元分析結(jié)果
LoadCase:3gLongitudinal+1gVertical
(MaximumVonMisesStress=128MPa)UnderframeStructuralAnalysis底架結(jié)構(gòu)分析Figure3. FEAResultofBatteryandRe-railerBox.Battery&Re-railer箱體有限元分析結(jié)果
LoadCase:1.5gLateral+1gVertical
(MaximumVonMisesStress=56.5MPa)UnderframeStructuralAnalysis底架結(jié)構(gòu)分析Figure4. FEAResultofBatteryandRe-railerBox.Battery&Re-railer箱體有限元分析結(jié)果
LoadCase:2gVertical
(MaximumVonMisesStress=49.8MPa)UnderframeStructuralAnalysis底架結(jié)構(gòu)分析Figure5. FEAResultofBatteryandRe-railerBox.Battery&Re-railer箱體有限元分析結(jié)果
LoadCase:2gVerticalwithDoorOpen
(MaximumVonMisesStress=130MPa)UnderframeStructuralAnalysis底架結(jié)構(gòu)分析Figure6. FEAModalAnalysisResultofBatteryandRe-railerBox.箱體形態(tài)有限元分析結(jié)果
Mode#1,F=24Hz. LongitudinalMovement.UnderframeStructuralAnalysis底架結(jié)構(gòu)分析Figure7. FEAModalAnalysisResultofatteryandRe-railerBox.Battery&Re-railer箱體有限元分析結(jié)構(gòu)
Mode#2,F=30Hz. VerticalBendingofBoxBottomStructure.箱體結(jié)構(gòu)縱向彎曲UnderframeStructuralAnalysi底架結(jié)構(gòu)分析Figure8. FEAModalAnalysisResultofBatteryandRe-railerBox.Battery&Re-railer箱體有限元分析結(jié)構(gòu)
Mode#3,F=33Hz. VerticalBendingofBoxBottomStructure.箱體結(jié)構(gòu)縱向彎曲UnderframeStructuralAnalysi底架結(jié)構(gòu)分析Figure9. FEAModalAnalysisResultofbatteryandRe-railerBox.Battery&Re-railer箱體有限元分析結(jié)構(gòu)
Mode#4,F=45Hz. VerticalBendingofBoxBottomStructure.箱體結(jié)構(gòu)縱向彎曲UnderframeStructuralAnalysi底架結(jié)構(gòu)分析UnderframeStructuralAnalysi底架結(jié)構(gòu)分析UnderframeStructuralAnalysi底架結(jié)構(gòu)分析UnderframeStructuralAnalysi底架結(jié)構(gòu)分析UnderframeStructuralAnalysi底架結(jié)構(gòu)分析UnderframeStructuralAnalysi底架結(jié)構(gòu)分析UnderframeStructuralAnalysi底架結(jié)構(gòu)分析UnderframeStructuralAnalysi底架結(jié)構(gòu)分析UnderframeStructuralAnalysi底架結(jié)構(gòu)分析UnderframeStructuralAnalysi底架結(jié)構(gòu)分析DBHatchSupportStructure(1gVertical+3gLongitudinal)DB
頂蓋支架結(jié)構(gòu)Max.Stress:56.2MpaMax.Displacement:1.01mmCarbodyStructuralAnalysis車體結(jié)構(gòu)分析Displacement變形VonMisesStress平均應(yīng)力DBHatchSupportStructure(1gVertical+1.5gLateral)
DB
頂蓋支架結(jié)構(gòu)Max.Stress:40.1MpaMax.Displacement:1.12mmCarbodyStructuralAnalysis車體結(jié)構(gòu)分析Displacement變形VonMisesStress平均應(yīng)力DBHatchSupportStructure(2gVertical)DB
頂蓋支架結(jié)構(gòu)Max.Stress:30.4MpaMax.Displacement:0.92mmCarbodyStructuralAnalysis車體結(jié)構(gòu)分析Displacement變形VonMisesStress平均應(yīng)力ModalAnalysisofDynamicBrakeHatch&SupportStructure動(dòng)力制動(dòng)頂蓋和支撐結(jié)構(gòu)形態(tài)分析研究10mmDBHatchPlate100x100x6mmLateralTubeCarbodyStructuralAnalysis車體結(jié)構(gòu)分析ModalAnalysisofDBHatch&SupportStructure
動(dòng)力制動(dòng)頂蓋和支撐結(jié)構(gòu)形態(tài)分析研究1stMode2ndModeFrequency=27.0HzDynamicBrakeVerticalBounceFrequency=29.2HzDynamicBrakeRoll,CarbodyTwistCarbodyStructuralAnalysis車體結(jié)構(gòu)分析ModalAnalysisofDBHatch&SupportStructure動(dòng)力制動(dòng)頂蓋和支撐結(jié)構(gòu)形態(tài)分析研究Frequency=34.8HzDynamicBrakePitch+Longitudinal3rdModeCarbodyStructuralAnalysis車體結(jié)構(gòu)分析FanHatchStructure(1gVertical+3gLongitudinal)冷卻風(fēng)扇頂蓋結(jié)構(gòu)Max.Stress:51.8MpaMax.Displacement:1.8mmDisplacement變形VonMisesStress等效應(yīng)力CarbodyStructuralAnalysis車體結(jié)構(gòu)分析FanHatchStructure(1gVertical+1.5gLateral)風(fēng)扇頂蓋結(jié)構(gòu)Max.Stress:59.4MpaMax.Displacement:1.45mmDisplacement變形VonMisesStress等效應(yīng)力CarbodyStructuralAnalysis車體結(jié)構(gòu)分析FanHatchStructure(2gVertical)Max.Stress:30.6MpaMax.Displacement:1.10mmDisplacementVonMisesStressCarbodyStructuralAnalysisModalAnalysisofCoolingFanHatch&SupportStructure100x100x6mmLateralTubeCarbodyStructuralAnalysisModalAnalysisofFanHatchStructure
Frequency=22.2HzLongitudinalMoveofFanSupportStructureFrequency=24.6HzVerticalBendingofFanSupportbeams1stMode2ndModeCarbodyStructuralAnalysisModalAnalysisofFanHatchStructure
Frequency=25.1HzFrequency=27.3Hz3rdMode4thModeVerticalBendingofFanSupportbeamsLateralBendingofFanSupportStructureCarbodyStructuralAnalysisModalAnalysisofFanHatchStructure
Frequency=28.2HzFrequency=35.8Hz5thMode6thModeVerticalBendingofLateralFanSupportBeamVerticalBendingofLongitudinalFanSupportBeams
CarbodyStructuralAnalysisBucklingAnalysisofSideWallSkinSkinSize5908mmx1975mm(EngineCompartmentSideSkin)BoundaryCondition:OneSideFixed,OtherSidewith36NofdistributedcompressiveloadCarbodyStructuralAnalysisEngineHatchStructureBoltslocationsconstrainedinX,Y,ZUGModelFEAModel&BoundaryConditionsCarbodyStructuralAnalysisEngineHatch–FiniteElementModelTopViewBottomViewCarbodyStructuralAnalysisLength–mm,Force–N,Stress-MPaEquivalentStressEngineHatch-YieldLoadCase(1gV+3gLong.)CarbodyStructuralAnalysisEngineHatch-YieldLoadCase(1gV+1.5gLat.)Length–mm,Force–N,Stress-MPaEquivalentStressCarbodyStructuralAnalysisEngineHatch-YieldLoadCase(2gV)Length–mm,Force–N,Stress-MPaCarbodyStructuralAnalysisFirstMode26.3HzSecondMode29.8HzEngineHatch–ModalAnalysisCarbodyStructuralAnalysisRadiatorHatchStructure
GeometricModelCarbodyStructuralAnalysisRadiatorHatch–FiniteElementModelCarbodyStructuralAnalysisBoltslocationsconstrainedinx,y,zdirectionCouplingforBoltmodelingCouplingusedinLongitudinalloadcaseBoundaryCondition–YieldLC(1gV+3gL)RadiatorHatchBoundaryConditionsCarbodyStructuralAnalysisLength–mm長(zhǎng)度-毫米Force–N
載荷-牛頓Stress–Mpa
應(yīng)力-帕斯卡RadiatorHatch–YieldLoadcase(1gV+3gLong.)散熱器天窗,屈服載荷(1g
豎向坐標(biāo),1.5g橫向坐標(biāo)CarbodyStructuralAnalysis車體結(jié)構(gòu)有限元分析EquivalentStress(MPa)等效應(yīng)力Boltslocationsconstrainedinx,y,zdirection,螺栓聯(lián)接CouplingforBoltmodelingCouplingusedinLongitudinalloadcaseBoundaryCondition–YieldLC(1gV+1.5gLat)載荷邊界條件:1g
豎向坐標(biāo),1.5g橫向坐標(biāo)RadiatorHatch散熱器天窗BoundaryConditions載荷邊界條件CarbodyStructuralAnalysis車體結(jié)構(gòu)有限元分析Length–mm長(zhǎng)度-毫米Force–N
載荷-牛頓Stress–Mpa
應(yīng)力-帕斯卡EquivalentStress(MPa)等效應(yīng)力RadiatorHatch–YieldLoadcase(1gV+1.5gLat.)載荷邊界條件:1g
豎向坐標(biāo),1.5g橫向坐標(biāo)CarbodyStructuralAnalysis車體結(jié)構(gòu)有限元分析Boltslocationsconstrainedinx,y,zdirectionCouplingforBoltmodelingBoundaryCondition–YieldLC(2gV)載荷邊界條件:2g
豎向坐標(biāo)RadiatorHatch散熱器天窗BoundaryConditions載荷邊界條件CarbodyStructuralAnalysis車體結(jié)構(gòu)有限元分析EquivalentStress(MPa)等效應(yīng)力Length–mm長(zhǎng)度-毫米Force–N
載荷-牛頓Stress–Mpa
應(yīng)力-帕斯卡RadiatorHatch–YieldLoadcase(2gV)載荷邊界條件:2g
豎向坐標(biāo)CarbodyStructuralAnalysis車體結(jié)構(gòu)有限元分析CarbodyStructuralAnalysis車體結(jié)構(gòu)有限元分析WaterTankStructuralAnalysis膨脹水箱有限元分析模型CarbodyStructuralAnalysis車體結(jié)構(gòu)有限元分析WaterTankStructuralAnalysis膨脹水箱有限元分析模型CarbodyStructuralAnalysis車體結(jié)構(gòu)有限元分析WaterTankStructuralAnalysis膨脹水箱有限元分析模型1gVertical+3gLongitudinal,載荷邊界條件:1g
豎向坐標(biāo),3g橫向坐標(biāo)CarbodyStructuralAnalysis車體結(jié)構(gòu)有限元分析WaterTankStructuralAnalysis膨脹水箱有限元分析模型1gVertical+1.5gLateral,載荷邊界條件:1g
豎向坐標(biāo),3g橫向坐標(biāo)CarbodyStructuralAnalysis車體結(jié)構(gòu)有限元分析WaterTankStructuralAnalysis膨脹水箱有限元分析模型2gVertical,載荷邊界條件:2g
豎向坐標(biāo)CarbodyStructuralAnalysis車體結(jié)構(gòu)有限元分析WaterTankStructuralAnalysis膨脹水箱有限元分析模型CarbodyStructuralAnalysis車體結(jié)構(gòu)有限元分析WaterTankStructuralAnalysis膨脹水箱有限元分析模型CarbodyStructuralAnalysis車體結(jié)構(gòu)有限元分析WaterTankStructuralAnalysis膨脹水箱有限元分析模型PhaseModuleTrayIsolation逆變器模塊底盤隔離Risksthatdrovetheisolationdecision導(dǎo)致采用隔離方案的風(fēng)險(xiǎn)因素16Henginehasnewvibrationcharacteristics16H柴油機(jī)新的振動(dòng)特性HenginemountingfeetareonthebaserailandcantransmitcrankcaseforcesandmotionsH
柴油機(jī)安裝底座傳遞來自曲軸箱的力和位移4-cycleenginehashalforders
四沖程柴油機(jī)產(chǎn)生“半階”振動(dòng)頻率(每秒轉(zhuǎn)速的一半)6000HPenginehashigherforces6000馬力柴油機(jī)產(chǎn)生更高載荷Carbodyisstifferandcantransmithigherfrequencies
高剛度車體傳遞高頻振動(dòng)Phasemodulesarelocatedveryhighinthecarbodystructure逆變器模塊位于車體頂端Phasemodulesareheavy
模塊重量大CarbodyStructuralAnalysis車體結(jié)構(gòu)有限元分析PhaseModuleTrayIsolation逆變器模塊底盤隔離Isolationconcept隔離方案Target23Hzinalldirections所有方向的自振頻率選在23HzMotionswillbesmall位移小Willpassfirstorderbutisolatehigherfrequencies
隔離柴油機(jī)二階及以上振動(dòng),不隔離一階振動(dòng)Willappear“stiff”toroadbedinducedinertialoads
對(duì)來自線路慣性載荷呈現(xiàn)“剛性”特性Fourisolatorlocations
四個(gè)減震器的位置Alignswellwiththelightweightstructure輕型結(jié)構(gòu)實(shí)現(xiàn)載荷均勻傳遞Adaptstolimitedaccessforbolting適用于有限裝配空間的裝配操作Willrequirestopsandinterlocks需要止擋及鎖定裝置Nocontactundernormaloperation
正常工作狀態(tài)下無剛性接觸CarbodyStructuralAnalysis車體結(jié)構(gòu)分析ArrangementofPhaseModuleRack逆變器模塊支架布置Isolatorsforlateralandverticalmotion橫向及垂向減震器Bellows褶式風(fēng)道AirDuct
風(fēng)道CarbodyFrame車架CarbodyStructuralAnalysis車體結(jié)構(gòu)分析PhaseModuleRack逆變器模塊支架FEModelingofPhaseModuleRackwithCarbody模塊支架與車體的有限元模型CarbodyStructuralAnalysis車體結(jié)構(gòu)分析FEModelofPhaseModuleRack模塊支架的有
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 豬鏈球菌病的臨床鑒別與防治
- 房屋更名合同協(xié)議書模板
- 物資清點(diǎn)合同協(xié)議書模板
- 某蔬菜瓜果物流園商業(yè)計(jì)劃書
- 國潮活動(dòng)策劃方案
- 美業(yè)資源合作合同協(xié)議書
- 公司土地租賃合同協(xié)議書
- 租地合租地合同協(xié)議書
- 武漢動(dòng)物基因疫苗項(xiàng)目商業(yè)計(jì)劃書范文參考
- 商丘鋁合金精密壓鑄件項(xiàng)目可行性研究報(bào)告
- GB/T 36713-2018能源管理體系能源基準(zhǔn)和能源績(jī)效參數(shù)
- GB/T 25068.1-2020信息技術(shù)安全技術(shù)網(wǎng)絡(luò)安全第1部分:綜述和概念
- “二級(jí)甲等婦幼保健院”評(píng)審匯報(bào)材料
- 《狼王夢(mèng)》讀書分享PPT
- 發(fā)展心理學(xué)第14章-兒童道德的發(fā)展課件
- 三年級(jí)美術(shù)下冊(cè)第10課《快樂的節(jié)日》優(yōu)秀課件1人教版
- 電力市場(chǎng)交易模式
- 第四課《單色版畫》 課件
- 門診手術(shù)麻醉原則課件
- 自動(dòng)噴水滅火系統(tǒng)質(zhì)量驗(yàn)收項(xiàng)目缺陷判定記錄
- 提高腸鏡患者腸道準(zhǔn)備合格率課件
評(píng)論
0/150
提交評(píng)論