




版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、Update date I 1Product Design CommunicationVehicle: Volvo XC90Lamp: V526 RLSummaryProject introductionStyle and layoutExplosive view Optical SolutionThermal and condensationVibration simulationMechanical simulationIsostatismProcessManufacturabilityElectronicsProject introductionDesign evolution:Expe
2、rtise 2021.11 RFQ: 2021.11-2021.7 PH1:2021.8-2021.2 PH2:2021. 3-2021.8Side reflexStyle and layoutTail(21Leds)Fresnel and micro-prismSide-marker(22Leds)Fresnel and micro-prismSide-reflexStop(15Leds)Fresnel and cube inner lensReverse(PSX24 Bulb)TI(12Leds)Fresnel and cube inner lensFog(3Leds)Fresnel an
3、d cube inner lens718mmExplosive view and sectionsOptical SolutionOptical SolutionFresnel + Micro prism solution For constant optical aspect of Tail and Side-marker.Optical SolutionFresnel + Ice screen For Stop-TI-Fog function.Fresnel screenIce screen50cm for SAE regulation(Stop)50cm for SAE regulati
4、on(TI)100cm between Fog and StopFogOptical SolutionP24W BulbPSX24W for Reverse Function(mounting in Y direction)15mm heightThermal and condensationBulb or LEDLED RthFunctionDissipated Power at 13.5 V (W) SimulationTest at 60C PSX24W*Reverse18.2W5 min on/ 5 min off24 W Continuously onThis test is to
5、simulate the impact of the PSX24W bulb to all other components.Thermal and condensationPC, temperature limit 150 C: NOKSolution is to make Shiny metallization on rear surface of main bezelThermal and condensationPMMA, temperature limit 105-110 C: NOKSolution is to Change material of stop screen to P
6、MMA-HT or adjust Flux of PSX 24W bulb.Thermal and condensationSmall risky area, its ok.PMMA, temperature limit 105-110 C: NOKThermal and condensationPC, temperature limit 150 C: NOKSmall risky area, its ok.Thermal and condensationTail/SM PCBAdd SM PCBStop LEDs PCBTI LEDs PCBDriver boardThermal and c
7、ondensationSimulation 20 : 60 , SAE, TAIL, SM, STOP,TI, PmaxThermal and condensationGiven area is cold area and the air velocity is very low here . We make a gore-tex pad to solve this problemThermal and condensationSimulation teams propose to increase the gap at 5mm Min. as the style limit , we kee
8、p current definition.Vibration MECHANICAL SIMULATION Fender Modal Harmonic PSD Trunk Modal Harmonic PSD Slamming Vibration simulationVibration simulationVibration simulation6-screws to increase the connection between Main mask and housing Lots of location dot to decrease the “LAdd re-enforce rib on
9、housing to increase “AVibration simulationMechanical SimulationObjective:Context:Check frequency on the lamp assemblyCheck first frequencyTools:Reference doc:Criteria:ANSYS 13 SP2Vibration methodology V3Vibration Material V9First frequency100 HzSecond frequency120HzResults and conclusion:The first f
10、requency is 72Hz.Contact risk between main bezel and lens , main bezel and side markerKORecommendations:Add contacts between black bezel and housingMode 1 72HzMode 2 79HzUpdate date I 23Vibration simulationStress fatigue limit of 21MPablack bezelmain bezelMax stress at contact surface Vibration simu
11、lationPenetration :7.5-3.5-0.7=3.3mm lens and main bezelGap=0.7mmContact risk in Y direction, visibleGap=3.5mmPenetration :7.5-0.7-1.4=5.4mm side marker and main bezelmechanical simulation Simulation target: 1.Ensure RL resist to the clamping effort 2.Ensure RL displacement. Apply the torque of 6N.M
12、 on the RL screw fixing 1) Apply a displacement of +/-1.5mm on RL trunk bottom screw fixing 2)Check the Von-Mises stress (mechanical resistance)mechanical simulationAdd ribs on HousingIncrease local area thickness from 2.5mm to 3mm localAdd ribs on HousingIts ok after modificationIts ok after modifi
13、cationmechanical simulationDisplacement resultIsostatismA1A2Adjusted screws A3B1B2C1Half-BCCBBCBAauxiliary-ABIsostatismIsostatismHalf-B ,CBAHalf-B ,CAAIsostatismBCCAAAABCCAAAAAACBBPls find the inner components fixation as below:ProcessStep-1 Housing Assem(With Harness, gasket, screws, P24W bulbs CP)
14、Step-2 With Stop and TI Fresnel Assem+ Reverse reflector (PCBs and Fresnel screens ,reverse reflector)Step-3 With Back bezel Assem(Back bezel, Tail blade, Side marker, PCBs and harness)Step-4 With Main bezel Assem(Main mask ,Stop and TI screen, Reflex reflector)Step-5 With Lens(Hot-plate welding pro
15、cess)ManufacturabilityLensHousingsMain bezelAs images shown above ,there are big deflection on Lens, Housing and Main bezel. we can only improve it by mold adjustment(cooling,adjusting Jigs, mold adjustment.)ManufacturabilityWe take much time adjusting thickness of Main bezel. Base on its structure
16、defect, the component still have much risk on Welding lines, air traps and sink mark.ManufacturabilityEjectorOriginal stateejector stateTake the lens by manipulator Extract directionManufacturabilityThree sliders for Reverse reflector.Slider for Bulb mounting in Y directionSlider-Top is to avoid optical surface losingSlider-Bottom i
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 婁底幼兒師范高等專科學校《水資源與取水工程》2023-2024學年第一學期期末試卷
- 2025年制造業數字化轉型數據治理與工業物聯網應用研究報告
- 撫順師范高等專科學校《經典醫方書寫》2023-2024學年第一學期期末試卷
- 河南推拿職業學院《習概》2023-2024學年第一學期期末試卷
- 玉林師范學院《成癮醫學》2023-2024學年第一學期期末試卷
- 安徽藝術職業學院《西方音樂史(二)》2023-2024學年第一學期期末試卷
- 2025年制造業數字化轉型數據治理數據治理與企業可持續發展研究報告
- 2025年制造業工業互聯網安全防護技術與應用研究報告
- 免疫衰老與關節疾病-洞察及研究
- 審美主體活動方案
- 2025年安徽新華傳媒股份有限公司招聘筆試參考題庫含答案解析
- 《國防動員實施》課件
- 高處墜落安全課件
- H3CNE認證考試題庫及答案詳解
- 景觀綠化工程監理規劃范文
- 公路工程施工質量控制培訓
- 中國高血壓防治指南(2024年修訂版)
- 2025國家公務員政治理論應知應會知識考試題庫(含答案)
- 蔬菜種植基地管理手冊
- 【MOOC】微處理器與嵌入式系統設計-電子科技大學 中國大學慕課MOOC答案
- epc項目勞務分包合同
評論
0/150
提交評論