


下載本文檔
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、CONTRACT FOR PROJECT INSTALLATION This Contract for project of installing Main Engine is made on_, by and between _ Company Ltd. (here- inafter called Party A) and _ Company Ltd. (hereinaftercalled Party B). 1.Name of installation work: _.2.Location of installation work: Party As_in Port A.3.Scope o
2、f installation work: As specified in the drawingsand statement attached.4.Time limit for completion:The installation work shall cordinate with the construction of _ in Party A, and shall be completed, including thetrial run for _, within _days after the completion of _.5.Total price of installation
3、work:_U.S. D only.6.Payment terms of installation work:First installment:Party A shall pay to Party B fifteen percent of the total pricefor installation work, i.e._U.S.D only, when thiscontract comes into effect.Second installment:Party A shall pay to Party B fifteen percent of the total pricefor in
4、stalatiorn work, i.e_U. S. D. only, at the commencement of construction installation.Third installment:Party A shall pay to Party B ten percent of the total pricefor installation work, i.e._U. S. D. only, duringthe installation of pipes.Fourth installment:Party A shall pay to Party B forty percent o
5、f the total pricefor installation work, i.e._U. S. D. only, at thetime when the main equipment arrives at the site.Fifth installment:Party A shall pay to Party B ten percent of the total pricefor installation work,i.e._U. S. D. only, upon comple - tion of the installation work.Sixth installment:Part
6、y A shall pay to Party B ten percent of the difference of the price for installation work, i.e._U. S. D. only, after the work received has been proved qualified.7.Penalty for default:In the event Party B shall fail to complete the work in timeowing to reasons that Party B shall be held liable, Party
7、 B shallpay a penahy for such defauh based on one out of a thousand of the total price for installation work per day , i.e._U.S.D, only for each day of such default.8.Increase or decrease of work:In case Party A has to amend,increase or decrease the working schedule, the corresponding increase or de
8、crease of total priceshall be evaluated according to the terms and conditions betweenthe two Parties, Should the work be increased, the Parties shallenter into an agreement for the unit price of additional items. Should any part of the completed work of any part of the materi - als transported to th
9、e site have to be abandoned owing to amend - ment made by Party A, Party A shall, after having received thework, pay for each completed work or materials abandoned as perthe unit price specified to Party B.9.Supervision for progress:The supervision personnel appointed by Party A and its rep - resent
10、ative shall have the authority to supervise the progress orwork and give instruction. Party B shall perform correctly in ac - cordance with such instruction given by Party As personnel orrepresentative.10.Stopage work:Should Party A notify Party B to stop the work for reasonsbeyond the responsibilit
11、y of Party B, Party B can stop the workand claim from Party A the price of finished work, materials atsite and other reasonable expenses to be added or deducted fromthe paid installments.11.Custody of work:The completed work and the materials, tools, and equipment at site shall be under the custody
12、of Party B after commencement and before completion and delivery of the work. Unless in the event of Force Majeure, Party B shall be fully responsible for any damage of the work under the custody of Party B. In case of Force Majeure, Party B shall give a list of damage according to the actual condit
13、ion and suggest an expected price and date forrecovery from such damage to Party A for checking and payment.Should Party A decide not to continue with the work, thiscontract shall be terminated according to article 10 hereof.12.Warranty for work.Party B shall warrant the promised condition of the wo
14、rk within _ year(s) after the date of receiving the work by Party A. However, Party B shall not be liable to Acts of God or misuse of the work by Party A.13.Supplemental provisions:Party B shall be held responsible if Party As personnel or other people is injured due to the negligence of Party B dur
15、ingthe progress of construction. However, such responsibility shallrest upon Party A if the injury caused is due to the negligence of Party A of technicians contracted with Party A.14.Attachments :Attachments shall become an integral part of this contractand shall be as effective as any other provis
16、ions. Attachments include:(1) Drawings(2) An estimate of cost.15.Format of this contract:The contract shall be in duplicate with two texts to be heldseparately by the Parties hereof. Each of the Parties shall alsokeep two copies of the contract for record.16.Additional Provision :Maintenace of Main Engine.Party B shall provide free periodic maintenance service forthe Main Engine of _ for _ year(s) after the receiving of the work by Party
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 山東省日照市莒縣一中2025屆高考歷史試題終極仿真預測試卷含解析
- 石家莊理工職業學院《統計軟件R語言》2023-2024學年第二學期期末試卷
- 2025年網絡安全與信息法考試試卷及答案
- 江西省上饒市信州區2024-2025學年五年級數學第二學期期末達標檢測模擬試題含答案
- 天津美術學院《腫瘤免疫治療學》2023-2024學年第二學期期末試卷
- 江蘇省興化市安豐初級中學2024-2025學年學業水平模擬考試化學試題仿真模擬試題B卷含解析
- 2025年職稱外語考試專項測試卷及答案
- 2025年注冊會計師考試試卷及答案
- 無錫工藝職業技術學院《基礎醫學實驗(二)》2023-2024學年第二學期期末試卷
- 西安建筑科技大學華清學院《房地產項目投資與融資》2023-2024學年第二學期期末試卷
- 中醫內科學(十版)
- 成品檢驗記錄表
- DB33-T 2196-2019水利工程標識牌設置規范
- 基于前藥原理的藥物設計解析課件
- 2022年上海海洋大學食品科學復試資料
- 病例報告表(CRF)模板
- 我把沒有送給你(課堂版)(1)
- 杭汽HNKS50-63-28型汽輪機大修施工方案
- Q∕GDW 12113-2021 邊緣物聯代理技術要求
- 劉半農雨散文的特點
- 濰柴發動機WD615系列分解圖冊
評論
0/150
提交評論