版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、電路板焊錫作業分析及改進(Analysis and improvement of PCB soldering operation)This article is contributed by wenjunfa123Pdf documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.IdsiniergadMaaenNo620nutaEgeinngmetrlnn.,
2、08Ding engineering and management20, 608th yearArticle number: 0752 (080 - 14010 - 4920) 602 - 4Analysis and improvement of PCB soldering operationDragons, Lin Lan, Jiang Zuhua(mechanical and dynamic force on the sea Jiaotong University College of engineering, Shanghai 204) Abstract: the 020 circuit
3、 board soldering, the work efficiency is not high, but the operator fatigue is larger, the need to improve. Applied ergonomicsThe principle and method of field measurement were carried out, and the causes of influencing work efficiency and labor intensity were analyzed. Workers who redistribute thei
4、r left and right handsThe task and the corresponding equipment are to adjust the layout of working procedures; operation simulation before and after improvement and AC and comparative analysis using JK software, the suggestions for the improvement of the station. Keywords: circuit board solder opera
5、tion; job simulation; ERGONOMICS; CLC number: 22TB8F4; 1; document identification code: AAnlssadIayinmprvmefSleigPrcsnCiciadoentoodrnoesorutBorL0NGn, LNaYiILn, jNAG - uIZuha(hnhiioogUnvriyShofMehnclEniern, hnhi020CiaSagaatniestcolcaiagneigSaga04, HN) Jo2AbtatIpoeetseddnsleigrcsocrutorcnieighsrc:mrvm
6、nineeiodrnpoesnicibadosdrnteIefcecntircsnhihftgedgefoeaosThsaeplshnfiinyihspoesadtehgaiuereoprtr.ipprapiteePicpeadtemehdounegneigtodrnrcsncrutbadBaenrnilnhtofhmaniernosleigpoesoicior.sdofluvyhatrfetnhfiinyoodrnrcsnhnestflbraeidsre,T E F C O S F C I G T E L E I G C FS組P O E S D T E I T n我O O R E y一個是
7、E,R P S D S L E I G P O E C N I E SR SG我G T E T S F RRG TA D L F、H、N、S、N、L、E P O O O ZD E R C O D RN的SD R E S N H K O N E T D I hD ajsig T E LY U F TE雪橇了NS的LT E B O N莫SD C N杜T H O T O H R Q IME T.我D L AE N J K n我的FWA UL O O P R T E P O O E O T R S B C M E H R P S D E C T O Wi莫再RN P O D E S T T我SG涂DL
8、 H U R N S樂IG R C S. N IH F JS G E SA E S我我P O E T R I C U G S I N R。LO G V N T M R V H S P O E S克R S O D R C S N Cr RN U TB D我u我N Y和D:S L E I G P O E所以我O R;SM L T;H馬我E Rn。O U N E G N E I G1電路板的焊錫作業概述在電路板的制造過程中,電路板焊錫作業是整個流水線的第2道工序,中的一個流水線環節是3其導書,此道工序的基本步驟如下。()用雙手把電路板從流水線上拿下來;1()左手把電容L來放在電路板上;2拿()左手把
9、電容1固定在電路板的位置1;3上()左手拿過錫線,在電容1的邊緣,手拿4放右來電烙鐵;(5)左手握住錫線,右手進行焊接;對把電路板上焊上電容再放上流水線上去現有的。電路板焊錫作業的工作效率不高,而且操作者疲勞度較大廠方和工人都希望進行改進,以提高效率,并降低操作工的疲勞度。目前已有許多提高工作效率的作業研究和應用工作L J 1。本文通過實地測量()放回焊線和電烙鐵;6(2)左手把電容拿來放在電路板上;7(2)左手把電容固定在電路板的位置2;8上和仿真等方法,出改進措施。提2電路板焊錫作業分析2 1工序分析。根據現場和錄像的觀察,結合該工序的操作指收稿日期:0 80 0 0 80 5修回日期:2
10、 0-22;2 0 62()左手拿過錫線,9 put on the edge of capacitor 2, right handCall soldering iron;(0I) hold the tin wire in the left hand, welding with the right hand; (11) return the welding line and the electric iron;Biography: Dragons (95), 18 female Hunan Chenzhou, the main research direction for the modelin
11、g, simulation and optimization of transportation.14 - 2IdsrlniergadMaaenNo620nutigneinngmetaEn., 08Industrial Engineering and management20, sixth, 08 years(21) return the circuit board back to the assembly line with both hands.Take and put it on the circuit board, where the actual manual operation t
12、ime is only 1s, that is to say, there is 1.3s moving in all kinds of work, 6176 isRepeat () (2). Analysis of both hands before improvement, as shown in table 11) L. The working procedure of the station should be said to be relatively simple, with only 1 steps in total. But on many occasions, the res
13、ults show that 0 people workThe time required to complete a process is not the same, and the program is not strictly controlled. The average time is about 2.3S, and the Jc level is 776 (AK simulation)Take 2.3s. 776)Tool. In this 1.3s, 176, not only delayed the time, and too many andThe move can caus
14、e the worker to feel more tired. This point fully illustrates, in this station, workers left and right handsThe cooperation is out of step. The worker has more than 13 of the time in the repetitive movement / animal body, and the right hand is in a waiting state for a long timeIt's a pretty wast
15、e. Overall, the efficiency of the system is still at a lower level, which needs to be improved. UrgentThe right hand action improves the time / S focus from the assembly lineIn addition, it was found that regardless of the fetch time (the circuit I refer to)The board is placed on the worktable and r
16、eturned to the assembly line, the capacitor 1 and the capacitor 2 will beThe left hand action L2 is from the pipeliningAs Paul Paul shift operation shift and so on to be a dynamic industry - - - - - - 1R - 1R - - - - - - -Take the road plateTake the capacitor L and 3 the solid.R of the capacitor 1 -
17、/Take the road plateWaiting to waitSeventeen point six eightL8433Position 14 take the tin line 5 hold the tin wire 6 return to the weld line 7 take the capacitor 2 and the 8 2 of the capacitorC.IC.Take the call iron all over 1O62.A tick -By L5.), shift - put back much iron welding process, 97O0 can
18、be considered with l843 waiting for waiting for some 3Set the upper 29 take the tin wire 1 hold the tin line 0l back to the weld line 1C.- -)C.Take the soldering iron call - return the soldering ironMovable knot. ringOne thousand and sixty-two.Fifty thousand and ninety-sevenL circuit board put 2 ret
19、urn linessummaryLiClassification markJob move hold-Mark left hand right handO - 1r28226OThe circuit board is put back into the assembly lineTotal4l42L768Total timewait for-OFourFourThe completion time of each circuit board is 23 seconds 776Figure 1 Analysis of both hands before improvement22. Improv
20、ement analysis221 by setting standards to reduce fluctuations in operating cycles() there is no standard to specify which capacitor is L2 and which is capacitance 2. The solution should be to set a standard to regulate the placement of capacitor 1 and capacitor 2, and to install the circuit on the c
21、ircuit board to avoid the wrong capacitor.222, through the design of the assignment of left and right hands, high.Efficiency of workHas been mentioned in the above, the position of normal working hours for the 2.3S but observed several times on the operation of workers after 776, found that in some
22、cases, the workers will be temporarily distracted due to other reasons did not get the correct capacitance, and cause the entire process from long time delay. We believe that this phenomenon is mainly caused by two reasons: (a) operation with mobile capacitance in short time, frequent alternation of
23、 1 iron and tin line, and 2 of the 1 capacitor capacitor used alternately. Workers are easily distracted. This can be done by redistributing the left hand taskThrough observation, we can see that the workers left and right hand I order allocation is not reasonable, the distribution by changing the l
24、eft hand we can attainTo improve the efficiency of the work.We can make improvements from the following aspects. (left) when the capacitor is 1, the hand takes the capacitor and the 21 is on the rightTo solve (also should pay attention to, as a kind of, people's attention will be, but this work
25、has always been in a high concentration state, but will not appear absent-minded, easy to lead, thoughWhen the capacitor is placed on the table, the capacitor 1 is placed on the left hand sideHold 2 on the right hand side;When tired, proper rest should be arranged.(2) the capacitance 1 capacitor 2 i
26、s respectively positioned by the left and the right handOne15 - 2LoongYin: PCB soldering operation analysis and improvement, etc.The fixed (according to process requirements, according to the 1 capacitor circuit board installed in the left side capacitor 2 is installed on the circuit board; (right)
27、after took the tin wire with an electric iron, with the back, 3 times a 1 capacitor capacitor 2 for welding. Advance into223 according to the improvement of the schedule, the worker stepsScheduled timeAfter improvement, the operation of the station shall be less than 2.3S and less than 776To 2.4S, t
28、he efficiency is increased by 2124, 3, while the object is moved at the same timeAnd the number is greatly reduced, the number of mobile by 1 of its 4 reduced to 1, 2 decreased by 1, 4 by comparison, we believe that the overall efficiency of the station has increased.Paul Paul and so on make shift s
29、hift to the left hand action L line from taking circuit board to be held industry right action- Administration - - 1 - - - - 1R.Time / S-Take the circuit board 1768 from the assembly line2 bring the capacitor L3 place the capacitor 1 on a fixed position 1C.-/Bring the capacitor 2 to 18.34Position 2-
30、 the solid 2 of the capacitor 310.26I.4 got the tin wireOn the capacitor 1-Take the call iron5 hold the tin wire and place the wire on the 6The capacitor 2 holds the tin line on 7C.I /) welding. WaitingweldingFive055,8 return the weld lineLi.1fPut the return soldering iron 00799 circuit board releas
31、eSummary of return line-LiCircuit board backAssembly lineOne thousand seven hundred and sixty-eightA sign; a left hand; a right handWork - - l62O360O V - keep waiting for mobileTotal4122OTotal timeThe completion time of each circuit board is 24 seconds 142Fig. 2 improved operation analysis of both h
32、andsSimulation of 3 station operation before and after improvementThe following simulation gives the simulation before and after the improvementReally, on this basis, a comparative analysis. And the whole process of operation is realized by JK's animation function. AC in order to move (HRL) unit
33、s, according to the order to show our imitation Tebi for G, according to the true out of the picture, the following is improved before and after the improved simulation screenshot.The capacitor 1 and the capacitor 2 are placed on the left of the workbench after the use of the left hand to carry the
34、capacitor. After improvement, the capacitor L is placed on the worktableTo the left, the capacitor 2 is placed on the right side of the workbench. andFigure 4 improved simulation changesCompare the quantity of 31 agentsWe can see clearly that the number of moving agents from the originalThe 2 decrea
35、se is the improved 105, and the dynamic amplitude is four of the originalFigure 3 simulation operations before improvementOne cent. This is because the right and left hand are picked up at the same time, capacitor 1 and capacitor 2 fixed,And then use solder wire and electric iron intoWhen welding, t
36、he welding capacitor 1 does not need to be put backIn the improved simulation, the working environment has changed, mainlyIs the position change of capacitor 1 and capacitor 2 on the worktable. In improvementOne126 oneIdsrlniergadMaaenNo620nutaEgneinngmetin., 08Industrial Engineering and management2
37、008 issue SixthHand, continue welding capacitor 2 following. Not only saves time, but also makes the workers more convenient and efficient labor productivity.Because of the limited space, we can't analyze the force of each part. Without losing generality, we select the spine (PN), I, SIE, andSho
38、ulder (HUdR as object of study can get sole by Ecl) Li xe,32 ergonomics analysisJK software work analysis toolkit (akAnlsACTsayisToli provides a variety of ergonomic analysis tools to use OKT) to analyze energy consumption, degree, stress, and so on. We use force and torque analysis tool block "
39、;ocnruayi" to compare FreadToqeAnlss"Curve of torque change before and after improvement. As can be seen from the data,There are two shoulder data and three spine data. For the shoulders, we make images of the left shoulder, shoulder and both averagesSpine, we only do average images, see f
40、igure 6.Freadtuunli:oebduocnoqeaaysswhloysmmayrSmmauwNgIhlr:teoudesIfhlretoude:sngeebhlow:BAnalyze the changes in the torque of each part of the body of the operatorTorque changes are used to characterize fatigue changes. Tool block analysisThe interface is shown in Figure 5 below. placeIlebellow:Itis:efwrtWhere the
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 中央廚房安全管理制度
- 專業地產項目管理制度
- 會員權益分層管理制度
- 倉庫手工臺賬管理制度
- 個人公司人員管理制度
- 教學工具與平臺在人工智能課程中的運用
- cnas實驗管理制度
- 中餐餐飲員工管理制度
- 企業品牌推廣管理制度
- 義烏低保動態管理制度
- 優化能源消耗的綠色IT部署戰略規劃
- 2025年上半年內蒙古包頭市市直事業單位招考易考易錯模擬試題(共500題)試卷后附參考答案
- 2025年度人工智能產業投資基金入股協議4篇
- 4.2.2光柵傳感器測量位移
- 2025年華遠陸港集團所屬華遠陸港網絡貨運(山西)限公司招聘(72人)管理單位筆試遴選500模擬題附帶答案詳解
- T-CCIASD 10012-2024 ISO 標準集裝箱用水性涂料
- 國家開放大學《金融學》機考題庫
- 證據法學復習資料
- 老年骨關節病康復護理
- 激越管理的22項建議(精神科患者激越的評估和管理)
- 【MOOC】機械工程測試技術-東南大學 中國大學慕課MOOC答案
評論
0/150
提交評論