




版權說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權,請進行舉報或認領
文檔簡介
大橋鋼箱梁施工組織設計
目錄
第一章總則........................................................................7
1,編制范圍........................................................................7
2、編制依據(jù)........................................................................7
3、編制原則........................................................................7
第二章工程概況.....................................................................7
1、橋梁結構及路線概況..............................................................7
2、橋址環(huán)境........................................................................7
2.1場區(qū)地形她貌特征.................................................................8
2.2氣象、水文.......................................................................8
2.3地質構造及地質巖性.......................................................................................................................9
2.3.1區(qū)域地質構造......................................................................9
2.3.2巖土層工程地質特征...............................................................10
3、主要技術標準...................................................................10
4、通航標準.......................................................................11
5、主要工程項目及數(shù)量.............................................................11
6、工程特點、難點及重點...........................................................11
第三章施工總體規(guī)劃................................................................13
1、施工環(huán)境.......................................................................13
1.1交通運輸條件....................................................................13
1.2鋼材、水泥、砂石料等主要材料供應...............................................13
1.3水資源...........................................................................13
1.4電力供應.......................................................................13
1.5通訊條件.......................................................................13
2、工程建設目標...................................................................13
2.1質量目標.......................................................................13
2.2工期目標.......................................................................13
2.3安全目標.......................................................................14
2.4環(huán)保目標.......................................................................14
2.5文明施工目標...................................................................14
3、施工組織機構...................................................................14
3.1施工組,織機構框圖...............................................................14
3.2施工組織機構及主要職責.........................................................15
3.2.1項目經(jīng)理部主要職責...............................................................15
3.2.2項目經(jīng)理主要職責.................................................................)5
3.2.3項目副經(jīng)理主要職責...............................................................15
3.2.5工程管理部主要職責...............................................................16
3.2.6安全質量管理部主要職責...........................................................16
3.2.7機“物資:理部主要職責..........................................................16
4、施工場地布置....1........................................17
4.1場地布置原則...................................................................17
4.2施工場地布置..................................................................17
5、主要大型臨時設施...............................................................17
5I施工便道17
5.3臨時碼頭.........................................................................................................................................79
5.4鋼箱梁拱試拼裝場地.............................................................20
5.5主橋混凝土澆筑場地.....................................................................................................................27
5.5.1場地概述.........................................................................21
5.5.2施工工藝.........................................................................22
5.6臨時供電、供水及通訊.................................................................................................................22
6、總體施工進度計劃..................................................................23
7、資源配置計劃......................................................................24
7.1勞動力配置......................................................................24
7.2機械、儀器設備、大臨設施配置...................................................24
第四章主要工程施工方案、方法與技術措施..............................................24
1、引橋工程施工......................................................................24
1.1設計結構概況....................................................................24
1.2引橋下部結構施工......................................................................................................................25
1.3引橋上部結構現(xiàn)澆梁施工...........................................................................................................25
1.3.1地基處理........................................................................26
1.3.2支架安裝.........................................................................28
1.3.3支架預壓.........................................................................29
1.3.4模板工程.........................................................................30
1.3.5支座安裝.........................................................................32
1.3.6鋼筋工程........................................................................32
1.3.7混凝土施工......................................................................33
1.3.8預應力工程.......................................................................35
L3.9支架拆除.........................................................................38
1.4橋面系施工....................................................................38
1)橋面鋪裝.............................................................................38
2)人行道及防撞護欄....................................................................39
3)橋面排水............................................................................39
4)伸縮縫..............................................................................39
5)照蔓及供電..........................................................................40
2)施工工藝40
2,主橋下部結構工程施工..............................................................41
2.1設計結構概況..................................................................41
2.2施工總體方案..................................................................41
2.3總體施工工藝流程圖..............................................................42
2.4各分項分部工程施工工藝.........................................................43
2.4.1交界墩12#、16#墩施.工...........................................................43
2.4.3主墩14#墩、15#墩基礎、拱座施工.................................................71
3,主橋上部鋼結構鋼箱梁、拱制造工程施工.............................................91
3.1結構設計概況...............................................................................................................................97
3.1.1鋼箱拱肋.........................................................................91
3.1.2鋼箱梁...........................................................................91
3.1.3縱梁.............................................................................92
3.1.4橫梁.............................................................................92
3.1.5吊桿.............................................................................93
3.1.6檢修設施.........................................................................94
3.1.7鋼結構涂裝.......................................................................95
3.2鋼箱梁拱的制造...........................................................................................................................96
3.2.1,總'華"月96
3.2.2?■隼制造工藝流程圖見下頁.......................................................99
3.2.5鋼構^f裝場布日-及規(guī)劃...................................................................................................124
3.2.6鋼梁、拱試拼裝..................................................................129
3.2.7鋼箱梁拱的涂裝..................................................................134
3.2.8產(chǎn)品驗收........................................................................136
3.2.10’鋼箱梁拱制造密源配置...........................................................139
3.3鋼箱梁拱的安裝.................................................................142
3.3.2三角剛構安裝....................................................................144
334鋼箱梁板安裝|55
3.4鋼箱梁拱安裝焊接...............................................................156
3.4.1現(xiàn)場焊接........................................................................156
3.4.2橋上焊接基本要求................................................................156
3.4.6工地點接質量和檢驗..............................................................158
3.4.7臨時連接件及吊點割除和焊后處理..................................................159
3.4鋼箱梁拱安裝臨時設施..........................................................159
3.4.1三角剛構墩旁支架施工工藝.......................................................159
4、主橋橋面京工程施工..............................................................178
4.1橋面結構......................................................................178
4.2橋面系施工工藝................................................................179
第五章鋼箱梁安裝監(jiān)控措施............................................................181
1、施工監(jiān)控的必要性與目的...........................................................181
2、施工監(jiān)控內(nèi)容.....................................................................181
2.1施工監(jiān)控主要內(nèi)容..............................................................181
2.2施工監(jiān)控主要對象.............................................................182
2.3提交施工監(jiān)控指令及監(jiān)控報告...................................................182
2.3.2施工監(jiān)控分析報告說明...........................................................182
3、,施工監(jiān)控技術要求.................................................................183
3.1.4索力監(jiān)測.......................................................................183
3.2測量誤差要求.................................................................184
3.2.1幾何?測;.....................................................................184
3.3監(jiān)控'精,要手…:.................................................................184
3.3.3)JA”.......................................................................................................................185
34i應力測量186
342炭形測量189
3.4.4測點的保護...............................................................192
4、監(jiān)控重點......................................................................192
4.1測量和測試精度的保證..........................................................192
4.2三角剛架施工監(jiān)控...............................................................193
4.3鋼箱拱肋和橋面系施工監(jiān)控......................................................193
第六章工期的保證體系及保證措施...................................................194
1、工期目標......................................................................194
2、工期保證體系..................................................................194
3、工期保證措施..................................................................194
3.1計劃開、竣工日期及各分項工程進度安排.........................................194
3.2確保工期的措施.................................................................195
第七章工程質量目標及保證體系......................................................196
1、工程質量目標..................................................................196
2、工程質量保證管理體系..........................................................196
3、工程質量的保證措施............................................................196
3.1關鍵工程質量保證的主要技術措施................................................197
3.1.1雙壁鋼圍堰施工............................................................197
3.1.2鋼結構的制造焊接施工......................................................198
3.1.3鋼結構的涂裝施工..........................................................199
3.1.4鋼結構的安裝施工..........................................................201
第八章安全生產(chǎn)管理體系及保證措施...................................................201
1、安全目標......................................................................201
2、安全生產(chǎn)管理體系..............................................................201
2.1安全保證體系...................................................................201
2.2安全管理制度...................................................................204
2.3安全管理職責...................................................................204
3,安全生產(chǎn)的保證措施............................................................204
3.1保證安全生產(chǎn)的組織措施........................................................204
3.2保證安全生產(chǎn)的技術措施........................................................204
第九章環(huán)境保護、水土保持保證體系及保證措施........................................205
1、環(huán)保保護、水土保持目標........................................................205
2,環(huán)保保護、水土保持保證體系....................................................206
3、環(huán)保保護、水土保持保證措施....................................................206
第十章文明施工、文物保護保證體系及保證措施.......................................206
1、文明施工保證體系與保證措施....................................................206
1.1文明施工目標...................................................................206
1.2文明施工保證體系.............................................................207
1.3文明施工保證措施...............................................................208
2、文物保護保證體系與保證措施....................................................209
第十一章項目風險預測與防范,事故應急預案.........................................209
1、項目風險預測與防范............................................................209
1.1風險管理目標及內(nèi)容............................................................209
1.2風險預測組織...................................................................210
1.3風險預測管理制度..............................................................210
2、風險預測與管理辦法............................................................210
2.1風險因素識別:................................................................210
2.2風險評估......................................................................211
2.3風險響應措施..................................................................272
3、事故應急預案.................................................................212
3.1應急組織.......................................................................272
3.2應急措施.......................................................................213
第一章總則
1、編制范圍
本項目橋梁工程,起訖樁號為:KO+O.000-K1+410.487
2、編制依據(jù)
2.1柳州市廣雅大橋兩階段施工圖設計文件。
2.2國家、交通部現(xiàn)行規(guī)范、標準、規(guī)則等。
2.3現(xiàn)場調查資料。
3、編制原則
3.1嚴格遵守設計文件的所有條款。
3.2制定科學、合理、切實可行的施工方案。
3.3積極推廣應用新技術、新工藝、新材料、新設備。保質量、保
工期、保安全、優(yōu)質高效的完成本橋的施工任務。
3.4嚴格執(zhí)行有關文明施工、環(huán)境保護及文物保護的規(guī)定。
第二章工程概況
1、橋梁結構及路線概況
廣雅大橋位于柳州市區(qū),大致呈東一西走向。大橋東岸接廣雅路,
通往市中心;西岸接河西路和磨灘路,與西環(huán)線相連。主線全長
1410.487m(含引道及橋梁總長),其中主橋長546m,橋寬36m,主橋跨
徑組合為63+2X210+63mo主拱肋為懸鏈線變截面鋼箱拱,鋼箱拱肋采
用等寬變高的單箱單室截面,組合跨徑為主跨雙孔210m;橋面加勁梁采
用底板開口的正交異性鋼橋面板結構形式,主跨吊桿間距為9米。引橋
長512m,現(xiàn)澆連續(xù)箱梁,橋寬36m、30m、25.5m三種,西岸引橋包括兩
邊輔道寬45.5m,西岸引道長249.722m,引道總寬47m,東岸引道長
102.765m(即廣雅路改造工程),寬度30m。
2、橋址環(huán)境
2.1場區(qū)地形地貌特征
廣雅大橋呈東?西走向,橋西(右岸,大橋的起點)位于磨灘村,
橋東(左岸,大橋的止點)位于廣雅路與廣雅路北四巷相交處,橋跨越
的柳江河段寬約610m,其中水面寬約558m,據(jù)實測的橋位河床斷面圖,
河床面除近岸坡處起優(yōu)稍大外,其余河床較平緩,水深變化于7?10m
之間,其中兩個主跨范圍內(nèi)河床變化于67.70?70.04m。經(jīng)現(xiàn)場調查,
右岸岸坡建有分級的片石擋土墻,總坡高約15m,岸坡以上地形變化較
平緩,地面標高變化于88.13?92.86m之間,局部為低洼積水池塘,左
岸岸坡上部建有片石擋土墻,下部有片石砌筑的護坡面,總坡高約16m,
岸坡以上地形西高東低,沿雅儒路呈一個往東傾的斜坡,地面標高變化
于91.96?93.77m之間,兩岸岸坡均無崩塌滑坡現(xiàn)象,僅在岸坡和水面
線相交處有輕微沖刷現(xiàn)象,勘察范圍內(nèi)均為柳江河河床及I、II級沖積
階地。
2.2氣象、水文
柳州市地處亞熱帶季風區(qū),季風環(huán)流影響明顯。屬亞熱帶邊緣氣候,
盛暑漫長,炎熱多雨。年間氣溫從零下2(至39(。年平均無霜期232
天,平均降雨量1453.8mm,雨季集中在4?8月,5?8月以南風或偏南
風為主,其余月份以北風或偏北風為主。最大風速達24.3米/秒,年平
均風速2.5米/秒。
歷年極端最高氣溫:39.2℃
歷年極端低高氣溫:-3.8℃
歷年最大風速:24.3m/s
歷年最大降水量:178.6mm
歷年日最大蒸發(fā)量:14.6mm。
柳江洪水期為每年的6月中?7月中,6月中屬多,洪水一般來勢
猛,暴漲暴落,洪峰過程長則25天,短則3天,根據(jù)柳江河段水文站
歷年實測洪水頻率分析,柳江百年一遇洪水(P=l%)水位為92.21m,五
十年一遇洪水(P=2%)水位為90.32m,二十年一遇洪水(P=5%)水位為
88.32mo由于下游紅花水電站已建成蓄水,故柳江河水常年水位可穩(wěn)定
保持在78m左右,水深一般為7?11m,流速較緩慢。紅花水電站正常蓄
水位為77.50米,相應的橋位處水位為78.63米。即正常情況下,紅花
水利樞紐建成后橋位處水位將長期維持在78.63米以上。2004?2008橋
位處各月水位統(tǒng)計表。
柳州洪水均因暴雨產(chǎn)生,流域多年平均降水2000mm以上,每年四
月開始,冷空氣南下頻繁,五月以后降水逐漸增多,6月達到高峰,七
月以后逐漸減少,柳州河段水期與此密切相關。年最高水位多發(fā)生在六
月下旬至七月上旬,其發(fā)生頻率超過50%o每年較明顯的洪水過程平均
約為15次左右。一次洪水過程,時間短者3天,長者可達25天。多年
平均洪水位為82.22m,年最高水位大部分在84.00m以下,水位超過
84.00m約占28.1%。即平均每3.5年發(fā)生一次。
2004?2008橋位處各月水位統(tǒng)計表(85國家高程系統(tǒng))
V
一月二月三月目月三月六月
且高水也(m)量燃水也(m里高水色(m)?氐搬電)最高水也(m)公低水住(m)最蒼水也(m)員爸水曹(m)量傷水曲m)最高十儉儂)量士水出m()
200470.0769.2270.0969.3170.5369.3272.5569.3973.5470.0275.2170.33
2005714571.0872.8871.17717471.0971.7269.8879.8470.1483.3571.29
2006774275.7277.5476.96775577.0177.9877.2178.3777.1579.4774.37
2007776576.3177.6076.94775977.3177.6477.27778977.3280.5777.06
200877.6577.2077.6771.3977.7376.8977.7077.12791777.0988.1477.04
V;
七月AJ5九月十月H■一月十二月
最霹水也(m)最傷燉(m)最戛水做m)量上水也(m)最高水也(四量傷水性(m)最咨水做㈤量獨水也(m)最霹水也(m)最沒水自⑺最連水住他)量W不出(m)
200487.5270.9973.4570.64729169.7770.1369.4371.5869.4171.3171.12
2005755972.3373.0272.25730972.1273.7772.66749473.0275.7374.89
200680.5677.3178.507744778477.3077.6777.2577.5777.3277.6177,24
2007786476.9378.6476.6578-2976.1777.6777.2977.61772477.5677.19
2008787977.1678.0977.1978.0977.1777.8476.9178.9377.1977.8277.16
2.3地質構造及地質巖性
2.3.1區(qū)域地質構造
廣雅大橋場區(qū)左岸(東岸)有一南北走向的推測斷層,斷層走向和
大橋走向近于正交,斷層距離柳江河岸坡頂部邊線約150m,該斷層構
造運動發(fā)生于中生代白堊系之前,目前已穩(wěn)定,第四紀以來未發(fā)現(xiàn)有明
顯的新構造運動跡象。
柳州市地處較穩(wěn)定的華南地臺范疇,根據(jù)地震局所做的歷史地震調
查,柳州市及附近地區(qū)未發(fā)現(xiàn)大地震遺跡,自1483?1936年近500年
見,僅發(fā)生過兩次5.0級左右地震。70年代以來的地震記錄,2級以上
的有感地震極少。
2.3.2巖土層工程地質特征
據(jù)現(xiàn)場踏勘調查、收集沿線及附近場地已有的地質資料,結合野外
鉆探情況及室內(nèi)土工試驗成果分析,按《公路橋涵地基與基礎設計規(guī)范》
(JTGD63-2007)對地基巖土類別的劃分標準,柳州市廣雅大橋及其配
套道路沿線線路上主要土層為河流沖積形成的一般性粘土、碎石土及碳
酸鹽巖經(jīng)紅土化作用形成的紅粘土,地表處則一般有人工填土覆蓋,下
伏基巖為中石炭統(tǒng)大埔組(C2d)白云質灰?guī)r,根據(jù)各巖土層的成因、
成分及力學強度的不同,可將其劃分如下:①層雜填土素填土、②層素
填土、③層含淤泥質亞粘土、④層粘土、⑤層亞粘土、⑥層圓礫、⑦層
卵石、⑧層紅粘土、⑨層白云質灰?guī)r。
橋位河床覆蓋層比較薄,河床表面1?2.3m左右為砂卵石層,系河
床沉積物,層厚1.9?2.3m,粒徑大于20mm的顆粒含量占60?80%,粒
徑以2?5cm為主,少量粒徑可達7cm,成份以石英砂巖類為主,顆粒磨
圓度較好,渾圓度一般,充填物為黃褐?灰黃色中?粗砂,充填程度較
差。下伏基巖為中石炭統(tǒng)大埔組(C2d)白云質灰?guī)r地層。
3、主要技術標準
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 婚紗影樓開店合作合同8篇
- 幼兒園一日衛(wèi)生保健講座
- 豆豆標記設計工作社教案
- 2025石家莊科技職業(yè)學院輔導員考試試題及答案
- 2025衡水職業(yè)技術學院輔導員考試試題及答案
- 粉刺文字排版設計
- 小學生體育衛(wèi)生教育實施要點
- 天津住宅樓工程基坑降水及土方開挖施工方案
- 實訓室教學的設計與實施
- 大班垃圾分類主題活動
- 2020-2024年五年高考數(shù)學真題分類匯編專題08 直線、圓與圓錐曲線(解析版)
- 第二單元 第8課《路由路徑靠算法》說課稿2024-2025學年人教版(2024)初中信息科技七年級上冊
- 2024 年江蘇高考【生物】真題及答案解析(江蘇卷)
- 中國地理:中國的南方地區(qū)(課件)
- 企業(yè)員工心理健康輔導服務預案
- 回收二手機免責協(xié)議書模板
- 二年級道法《我能行》
- 2024年廣東省廣州市市中考英語試卷真題(含答案解析)
- 全冠修復的護理技術
- 2024年廣東省廣州市市中考英語試卷真題(含答案)
- 注射泵操作使用課件
評論
0/150
提交評論