NATIONALSTANDARD
OFTHEPEOPLESREPUBLICOFCHINA
ElectricEquipmentInstallationEngineering-
StandardforHand-overTestofElectricEquipment
GB50150-2016
ChiefDevelopmentDepartment:ChinaElectricityCouncil
ApprovalDepartment:MinistryofHousingandUrbanRural
-
DevelopmentofthePeoplesRepublicofChina
ImplementationDate:December1,2016專用
人人文庫
ChinaPlanningPress
Beijing2019
ChineseeditionfirstpublishedinthePeoplesRepublicofChinain2006
EnglisheditionfirstpublishedinthePeoplesRepublicofChinain2019
byChinaPlanningPress
rd
,,專用
3FloorCTowerGuohongBuilding
No.A11,Muxidi-Beili,XichengDistrict
Beijing,100038
PrintedinChinabyBeijingJingyintangGraphicPrintingCenter
?2019byMinistryofHousingandUrban-RuralDevelopmentof
thePeoplesRepublicofChina
Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor
byanymeans人人文庫,graphic,electronic,ormechanical,includingphotocopying,recording,
oranyinformationstorageandretrievalsystems,withoutwrittenpermissionofthepublisher.
Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,
resold,hiredoutorotherwisecirculatedwithoutthepublisherspriorconsentinanyformof
blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition
includingthisconditionbeingimposedonthesubsequentpurchaser.
ISBN978-7-5182-1140-1
中華人民共和國住房和城鄉建設部公告
2019年第338號
住房和城鄉建設部關于發布《電氣裝置安裝工程
接地裝置施工及驗收規范》
等10項工程建設標準英文版的公告
現批準《電氣裝置安裝工程接地裝置施工及驗收規范》(GB50169—2016)、《±800kV直
流換流站設計規范》(GB/T50789—2012)、《1000kV系統電氣裝置安裝工程電氣設備交接試
驗標準》(GB/T50832—2013)、《光伏發電站施工規范》(GB/T50794專用—2012)、《光伏發電站設
計規范》(GB/T50797—2012)、《光伏發電工程驗收規范》(GB/T50796—2012)、《電氣裝置安
裝工程電氣設備交接試驗標準》(GB50150—2016)、《電力設施抗震設計規范》(GB50260—
2013)、《110kV~750kV架空輸電線路施工及驗收規范》(GB50233—2014)、《電氣裝置安裝工
程串聯電容器補償裝置施工及驗收規范》(GB51049—2014)英文版。工程建設標準英文版
與中文版出現異議時,以中文版為準。
工程建設標準英文版由住房和城鄉建設部組織中國計劃出版社出版發行。
中華人民共和國住房和城鄉建設部
2019年12月11日
人人文庫
Foreword
ThisStandardisrevisedbyChinaElectricPowerResearchInstituteandrelevantdepartmentson
thebasisofStandardforHandOverTestofElectricEquipmentElectricEquipmentInstallationEngi-
--
neeringGB50150-2006accordingtotherequirementsofDocumentJianBiao〔2009〕No.88issuedby
MinistryofHousingandUrbanRuralDevelopmentofthePeoplesRepublicofChina"NoticeonPrint-
--
ingtheDevelopmentandRevisionPlanofNationalEngineeringConstructionStandardsin2009".
Intheprocessofrevisingthisstandard,wehavesummedupthenewrequirementsandrelevantex-
perienceofscienceandtechnologyaswellasfieldpractice,andsolicitedtheopinionsextensivelyfromthe
concerneddepartmentsnationwide.Wehavedeliberatedandincorporatedthefeedbackcommentsand
submittedthedraftversionforapproval.Afterreviewing,thelatestversionofthisstandardisfinalized.
Thisstandardcomprises26chaptersand9appendixeswiththemaincontentsasfollows:general
provisions,terms,basicrequirements,synchronousgeneratorandsynchronouscompensator,direct
currentDCmachine,intermediatefrequencygenerator,alternatecurrentACmotor,powertrans-
()-()
former,reactorandarcsuppressioncoil,instrumenttransformer,vacuumcircuitbreaker,sulfurhexa-
-專用
fluorideSFcircuitbreaker,gasinsulatedmetalenclosedswitchgear,disconnectorandloadbreak
(6)---
switchandhighvoltagefuse,bushing,suspensioninsulator,postinsulator,powercablelines,capaci-
-
tor,insulatingoilandSFgas,lightningarrester,electrostaticprecipitator,secondarycircuit,distribu-
6
tionequipmentandfeedercircuitwithvoltagesof1kVandbelow,overheadpowerlineswithvoltages
above1kV,groundingconnectionandthelowvoltageelectricalapparatus,etc.
-
ThecontentsthathavebeenrevisedinthisStandardmainlyinclude:1.Theapplicationscopeof
ACvoltageforhandovertestofelectricequipmenthasbeenextendedfrom"500kVandbelow"to"
-
750kVandbelow".2.Termsintheoriginalstandardhavebeenrevised.3.Thechapterof"basicrequire-
ments"hasbeenadded.4.Thechaptersof"OilCircuitBreaker"and"AirandMagneticBlowoutCircuit
-
Breaker”intheoriginalstandardhavebeendeleted.5.Sometestitemsandstandardsusedforsynchro-
nousgeneratorandsynchronouscompensator,powertransformer,reactorandarcsuppressioncoil,in-
-
strumenttransformer,vacuumcircuitbreaker,sulfurhexafluorideSFcircuitbreaker,gasinsulated
(6)-
metalenclosedswitchgear,powercablelines,andcapacitor,havebeenrevised.6.Thetestitemand
-
standardforlimited人人文庫valueofparticulatepollutantintransformeroilhavebeenadded.7.Testitemsand
standardsforthemeasurementofsurfacepotentialdistributionof,touchpotentialdifference,stepvolt-
ageanddivertingpotentialforgroundingdevicehavebeenadded.8.TheAppendixD"DCLeakageCur-
rentReferenceValueofOilImmersedPowerTransformerWinding"intheoriginalstandardhasbeen
-
deleted.9.TheAppendixC"TemperatureConversionofDielectricLossTangenttanδ(%)forWinding
togetherwithBushing",AppendixD"VoltageappliedinACVoltageWithstandTestforPowerTrans-
formerandReactor"andAppendixE"TestofCircuitBreakerOperatingMechanism"havebeenadded.
Theprovisionsprintedinboldtypearecompulsoryonesandmustbeenforcedstrictly.
TheMinistryofHousingandUrbanRuralDevelopmentofthePeoplesRepublicofChinaisin
-
·1·
chargeoftheadministrationandexplanationonthemandatoryclauses.ChinaElectricityCouncilisre-
sponsiblefortheroutinemanagementofthisstandardandChinaElectricPowerResearchInstitutefor
theexplanationonthedetailedtechnicalcontents.
Allrelevantorganizationsarekindlyrequestedtosumupandaccumulateyourexperienceinactual
practicesduringtheprocessofimplementingthisStandard.Therelevantopinionsandadvice,whenever
necessary,canbepostedorpassedontoChinaElectricPowerResearchInstitute(Address:No.33,
SouthBinheRoad,XuanwuDistrict,BeijingCity,Postalcode:100055)forreferenceinfuturerevision.
ThefollowingaretheChiefDevelopmentOrganization,ParticipatingDevelopmentOrganiza-
tions,ParticipatingOrganization,ChiefDraftingStaffandChiefReviewStaffofthisStandard:
ChiefDevelopmentOrganization:
ChinaElectricPowerResearchInstitute
ParticipatingDevelopmentOrganizations:
StateGridPowerGridResearchInstitute
NortheastChinaElectricPowerResearchInstituteCo.,Ltd.
NorthChinaElectricPowerResearchInstituteCo.,Ltd.
HebeiElectricPowerResearchInstitute
ShanghaiElectricPowerResearchInstitute
AnhuiElectricPowerResearchInstitute專用
HubeiElectricPowerResearchInstitute
BeijingElectricPowerCompany
ChinaEnergyEngineeringGroupTianjinElectricPowerConstructionCo.,Ltd.
SEPCO1ElectricPowerConstructionCorporation
NortheastChinaPowerAdministrationNo.2ConstructionCompany
ShenzhenPowerSupplyBureauCo.,Ltd.ShenzhenPowerTechnologyResearch
Center
GuangdongElectricTransmissionandTransformationCompany
ShandongDachiElectricCo.,Ltd.
ParticipatingOrganization:
ShandongTaikaiTransformerCo.,Ltd.
ChiefDraftingStaff:
GaoKeliWangXiaoqiLiJinzhongJingJinLiuXiuliSunQianZhangShuqi
人人文庫GaoFeiFanHuiBaiYaminTianXiaoYangRongkaiRuanLingGeZhanyu
LiuZhiliangYaoShenjingLiuWensongGuChaoChenZinianDengChun
LiHaishengChenWeimin
ChiefReviewingStaff:
HanHonggangChenFayuYuXiaoyanZhuChunWangJinyao
ShanYingzhongLiYuejinZhengXuHuangGuoqiangLiuShihuaJiaYibao
ZhangChengYangJunhai
ChiefInterpreteringStaff:
TianxiaoLiKaizhouXuJunGeZhanyuZengGuangyuGuWei
ChengYangchunHeFeiZhuHong
·2·
Contents
1GeneralProvisions……………(1)
2Terms…………………………(2)
3BasicRequirements……………(3)
4SynchronousGeneratorandSynchronousCompensator………(6)
5DCMotor………………………(13)
6IntermediatefrequencyGenerator……………(15)
-
7ACMotor………………………(16)
8PowerTransformer……………(19)
9ReactorandArcSuppressionCoil……………(25)
10InstrumentTransformer………………………(27)
11VacuumCircuitBreaker………………………(32)
12SulfurHexafluorideSFCircuitBreaker34
(6)……………………()
13GasinsulatedMetalenclosedSwitchgear(GIS)……………(37)
--
14Disconnector,LoadbreakSwitchandHighVoltageFuse……(39)
-
15Bushing………………………專用(41)
16SuspensionInsulatorandPostInsulator………(43)
17PowerCableLine……………(44)
18Capacitor………………………(47)
19InsulationOilandSFGas49
6……………………()
20SurgeArrester…………………(52)
21ElectrostaticPrecipitator………………………(54)
22SecondaryCircuit……………(56)
23DistributionEquipmentandFeederLinewithVoltageLevelof1kVorBelow……………(57)
24OverheadPowerLinewithVoltageLevelofabove1kV……(58)
25GroundingConnection………………………(59)
26LowvoltageElectricApparatus………………(61)
-
AppendixASpecialTestItems…………………(62)
AppendixBConversionCoefficientforInsulationResistanceValues
ofGeneratorStatorWindingConvertedintoThoseatOperatingTemperature…(64)
AppendixCTemperatureConversionofDielectricLossTangent(tanδ,%)for
Winding人人文庫TogetherwithBushing65
……………………()
AppendixDVoltageAppliedinACVoltageWithstandTestforPower
TransformerandReactor……………(66)
AppendixETestofCircuitBreakerOperatingMechanism……(67)
AppendixFVoltageAppliedinPowerfrequencyVoltageWithstandTestfor
-
InsulationofHVElectricEquipment………………(69)
AppendixGTestMethodsandRequirementsforCrossbondedSystemofPowerCableLine…(70)
-
ExplanationofWordinginThisStandard…………(72)
ListofQuotedStandards…………(73)
1GeneralProvisions
Thisstandardisformulatedwithaviewtomeettherequirementsofhandovertestofelectric
1.0.1-
equipmentinelectricequipmentinstallationprojectsandpromotetheextensionandapplicationofnew
technologiesforhandovertestofelectricequipment.
-
ThisstandardisapplicabletothehandovertestofnewlyinstalledelectricequipmentwithAC
1.0.2--
voltagesof750kVandbelowthatconformstotherelevantnationalstandardsforfactoryacceptancetest.
Thehandovertestsforrelayprotection,automation,telecontrol,communication,measuringand
1.0.3-
rectifyingdevices,DCfieldequipmentandthemechanicalpartofelectricequipment,shallbeconducted
respectivelyaccordingtoprovisionsofthecurrentrelevantnationalcodes.
Inadditiontofollowingtheprovisionsofthisstandard,thehandovertestofelectricequipment
1.0.4-
inelectricequipmentinstallationengineeringshallcomplywiththerelevantprovisionsofthecurrent
nationalstandards.
專用
人人文庫
·1·
2Terms
Automaticdeexcitationequipment
2.0.1-
Itisanautomaticdevicethatisusedfordeexcitationofgeneratorandexciter.
-
Inductivevoltagetransformer
2.0.2
Itisakindofvoltagetransformerthattransformsprimaryvoltageintosecondaryvoltagein
proportionbyelectromagneticinduction.Theotherelectricalcomponentsthattransformprimary
voltagearenotattachedtothiskindoftransformer.
Capacitorvoltagetransformer
2.0.3
Itisakindofvoltagetransformerthatconsistsofcapacitivevoltagedividerandelectromagnetic
unit.Itsdesignandinternalwiringenablethesecondaryvoltageinelectromagneticunittobeindirect
proportiontotheprimaryvoltagethatisappliedtocapacitivevoltagedivider.Whenitisconnectedina
correctmanner,itsphasedifferenceisclosetozero.
Invertedcurrenttransformer
2.0.4
Itisakindofcurrenttransformerthatitssecondarywindingandironcorearelocatedatthetopof
thewholestructure.專用
Selfcontainedoilfilledcable
2.0.5--
Itisakindofpowercablethateliminatesairgapininsulatinglayerintheprincipleof
supplementaryimpregnationsoastoimproveoperationfieldstrength.
Couplingcapacitor
2.0.6
Itisakindofcapacitorthattransmitsinformationinelectricsystems.
Electrostaticprecipitator
2.0.7
Itmeansaprecipitatorthatseparatesdustfromdustygasthroughutilizingtheadsorptioneffect
imposedonchargeddustbyhighvoltageelectricfield.
Secondarycircuit
2.0.8
Itcomprisescircuitssuchasoperatingcircuit,protectioncircuit,measuringcircuitandsignalcircuit
ofelectricequipment,actuatorcoil,contactorrelay,instrumentandsecondarywindingofinstrument
transformer,etc.
Feederline
2.0.9
Itisatransmission人人文庫linethroughwhichpowerissuppliedfrompowersourceendtoloading
equipment.
Largescalegroundingconnection
2.0.10-
Itreferstothegroundingconnectionsinsubstationswithvoltagesof110(66)kVandabove,fossil
firedorhydraulicpowerplantswithcapacitiesof200MWandabove;orgroundingconnectionswith
equivalentplaneof5000m2andabove.
·2·
3BasicRequirements
ACvoltagewithstandingtestofelectricalequipmentshallbeconductedaccordingtothis
3.0.1
Standardandshallmeetthefollowingrequirements:
DuringtheACvoltagewithstandingtest,whenthevoltageisincreasedtostandardvoltageof
1
thetest,thelastingtimeshallbe1minuteifthereisnospecialinstruction.
Whenthevoltagevalueofwithstandingtestiscalculatedbasedonthemultiplesofrated
2
voltage,thevoltageforgeneratorandelectricmotorshallbeaccordingtoratedvoltageinnameplate.
ThevoltageforcablemaybecalculatedbymethodsstipulatedinChapter17ofthisstandard.
Asprescribedinthisstandard,thevoltagevalueofACwithstandtestfornonstandardvoltage
3-
equipmentmaybecalculatedbyinterpolationmethodinproportiontoadjacentvoltagelevelswhen
thereisnospecialrequirement.
Whentheinsulationtestismade,theconnectedequipmentordevicesshouldbeseparatedto
3.0.2
conductindividualtestexceptforthecompletesetofequipmentassembledbymanufacturer.Equipment
withthesameteststandardmaybeconnectedfortesting.Inordertobeconvenientfortest,electric
equipmentatthesamevoltagelevelwithdifferentteststandardsand專用factoryacceptancerecordsmay
alsobeconnectedtogetherwhensingletestisdifficult.Theteststandardshalladopttheminimum
standardamongalltheconnectedequipment.
Theinsulationtestforoilimmersedtypetransformerandreactorshallnotbeconducteduntil
3.0.3-
theyarefilledwithqualifiedoilandairbubblesareeliminatedafterstandingforacertaintime.Standing
timecomplieswiththemanufacturersrequirement.Whenthereisnorequirementbymanufacturer,the
relationshipbetweenvoltageclassoftheoilimmersedtypetransformerandreactorandstandingtime
-
shallbedeterminedaccordingtothosesetoutinTable3.0.3.
Table3.0.3Relationshipbetweenvoltageclassoftheoil-immersedtype
transformerandreactorandstandingtimeafteroilfilling
Voltageclass(kV)110(66)andbelow220-330500750
Standingtime(h)≥24≥48≥72≥96
Ifonlyindividualitemscannotsatisfyprovisionsofthisstandardduringthemeasurementand
3.0.4
testonelectricinsulation人人文庫,itshallmakesyntheticjudgmentoncomprehensivetestrecords,andthe
eligibleonesmaybeputintooperation.
Iftheratedvoltageofelectricequipmentisdifferentfromtheactualworkingvoltage,the
3.0.5
standardsfortestvoltageshallbedeterminedaccordingtothefollowingprovisions:
Whenelectricequipmentwithhigherratedvoltageisusedtoreinforcetheinsulation,itshallbe
1
determinedaccordingtoteststandardsofratedvoltage;
Whenelectricequipmentwithhigherratedvoltageisusedtomeettherequirementsofproduct
2
universalityandmechanicalstrength,itmaybedeterminedaccordingtoteststandardoftheactual
voltage;
Whenelectricequipmentwithhigherratedvoltageisusedtomeettherequirementsforhigh
3
·3·
altitudeareas,itshallbedeterminedaccordingtoteststandardofactualvoltageatinstallationsite.
Whenconductingvarioustestsrelatedtotemperatureandhumidity,itshallmeasure
3.0.6
simultaneouslythetemperatureandhumidityaroundthetestedobjects.Insulatingtestshallbecarried
outingoodweatherandundertheconditionsthatthetemperaturearoundtestedobjectsandinstrument
shouldnotbelowerthan5℃andtheairrelativehumidityshouldnotbehigherthan80%.Iftest
conditionsfailtomeettheabovementionedrequirementsfortemperatureandhumidity,themeasured
-
testdatashallbeanalyzedsyntheticallytojudgewhethertheelectricequipmentcanbeputinto
operation.Attentionsshallbepaidtotheinfluenceofenvironmentaltemperatureduringthetest.Asto
oilimmersedtypetransformer,reactorandarcsuppressioncoil,theoiltemperatureatupperlevelofthe
--
testedobjectshallbeconsideredasthetesttemperature.
AstomeasurementoninsulationresistancelistedinthisStandard,thevalueofinsulation
3.0.7
resistancemeasuredat60secondshallbeusedtheratiobetweenandthevalueat15second
(R60);R60
shallbeappliedforthemeasurementonabsorptancepolarizationindexshallbetheratiobetween
(R15);
valuesofinsulationresistancesat10minuteand1minute.
Wheninsulatingtestisconductedformultiplewindingequipment,shortcircuitgroundshallbe
3.0.8--
appliedtonontestedwindings.
-
Thevoltageclassofmegohmmetershallbeusedtomeasuretheinsulationresistance.Ifthereis
3.0.9
nospecialrequirementinthisStandard,therelationshipbetweenvoltageclassofequipmentandthe
adoptionofmegohmmetershallbeinaccordancewiththosespecifiedin專用Table3.0.9;whenitisusedfor
mensurationofpolarizationindex,theshortcircuitcurrentofmegohmmetershallnotbelessthan2mA.
-
Table3.0.9Relationshipbetweenvoltageclassofequipmentandadoptionofmegohmmeter
SerialMinimumrangeof
Voltageclassofequipment(V)Voltageclassofmegohmmeter(V)
Numbermegohmmeter(MΩ)
1<10025050
2<500500100
3<300010002000
4<10000250010000
5≥100002500or500010000
Thehighvoltagetestmethodsinthisstandardshallcomplywithrequirementsofthecurrent
3.0.10-
nationalstandards,suchasHighVoltageTestTechniquesPart1:GeneralDefinitionsandTest
-
RequirementsGB/T人人文庫16927.1,HighVoltageTestTechniquesPart2:MeasuringSystemsGB/T
-
16927.2,GuideforInsulationTestonSiteDL/T474.1~DL/T474.5,andotherrelevantstandardsfor
equipment.
Handovertestofimportedequipmentshallbeconductedaccordingtothestandardsstipulated
3.0.11-
incontract,andtheteststandardforsametestitemshallnotbelowerthanspecificationsofthisstandard.
Thestandardofwithstandvoltagetestforonlinemonitoringdevicethatbearsrunningvoltage
3.0.12
shallbeequivalenttothewithstandvoltagelevelofitsconnectedelectricequipment.
Handovertestforequipmentwithspecialincominglineshouldbeconductedindividually
3.0.13-
beforeitisconnectedtoadjacentdevices.Whentestcannotbeconductedindividuallyortestcanonlybe
·4·
doneaftertheequipmentisconnectedtocablesandGISthroughoilSFimmersedbushingoroil
-6
casing,theirmutualinfluenceshouldbetakenintoaccount.
Testitemthatistechnicallydifficultandrequiresspecialtestingequipmentshallbelistedas
3.0.14
specialtestitem,andshallbeconductedbytestingagencythathasthecorrespondingcompetence.
SpecialtestitemshallmeettherelevantrequirementsinAppendixAtothisstandard.
專用
人人文庫
·5·
4SynchronousGeneratorandSynchronousCompensator
Testitemsforsynchronousgeneratorsandsynchronouscompensatorwithcapacitiesof
4.0.1
6000kWoraboveshallincludethefollowingcontents:
Measurementoninsulationresistanceandabsorptionratioorpolarizationindexofstator
1
winding;
Measurementondirectcurrent(DC)resistanceofstatorwinding;
2
DCvoltagewithstandtestandmeasurementonleakagecurrentofstatorwinding;
3
ACvoltagewithstandtestofstatorwinding;
4
Measurementoninsulationresistanceofrotorwinding;
5
MeasurementonDCresistanceofrotorwinding;
6
ACvoltagewithstandtestofrotorwinding;
7
Measurementoninsulationresistanceofexcitationcircuitofgeneratororexcitertogetherwith
8
theconnectedequipment;
ACvoltagewithstandtestofexcitationcircuitofgeneratororexcitertogetherwiththe
9
connectedequipment;專用
Measurementoninsulationresistanceforinsulatedbearingofgeneratororexciterandinlet
10
waterpedestalofrotor;
Measuringoninsulationresistanceofembeddedthermodetectorandcheckingitwhetherin
11
goodcondition;
Testforautomaticdeexcitationdeviceofgeneratorexcitationcircuit;
12-
MeasurementonACimpedanceandpowerlossofrotorwinding;
13
Measurementandrecordofthecharacteristiccurveofthreephaseshortcircuit;
14--
Measurementandrecordofnoloadcharacteristiccurve;
15-
Measurementondeexcitationtimeconstantandrotorovervoltagemultipleforgeneratorat
16-
theratednoloadvoltage;
-
Measurementonresidualvoltageofgeneratorstator;
17
Measurementonphasesequence;
18
Measurementonshaftvoltage;
19
Testondynamiccharacteristicsofstatorwindingend;
20人人文庫
MeasurementofDCvoltageappliedtomanuallywoundinsulationatstatorwindingend;
21
Rotorventilationtest;
22
Waterflowtest.
23
Thehandovertestitemsforsynchronousgeneratorsandphasemodifiersofvariouskindsshall
4.0.2-
meetthefollowingrequirements:
Handovertestforsynchronousgeneratorwithvoltageofabove1kVandcapacityofbelow
1-
6000kWshallbeconductedinaccordancewithitem1,2,3,4,5,6,7,8,9,11,12,13,14,15,16,17,18
and19ofArticle4.0.1ofthisstandard.
Handovertestforsynchronousgeneratorwithanycapacityandvoltageofnomorethan1kV
2-
·6·
shouldbeconductedinaccordancewithitem1,2,4,5,6,7,8,9,11,12,13,18and19ofArticle4.0.1of
thisstandard.
Astosynchronousphasemodifierwithoutstartingmotororitsstartingmotorcanonlyrunina
3
shortspanoftime,itmaynotconductthetestsstipulatedinitem14and15ofArticle4.0.1ofthis
standard.
Measurementoninsulationresistance,absorptionratioorpolarizationindexofstatorwinding
4.0.3
shallmeetthefollowingrequirements:
Theunbalancedcoefficientofinsulationresistanceofeachphaseshallnotbelargerthan2.
1
Theabsorptionratioforinsulationofepoxymicashallnotbelessthan1.6.Astounitwith
2
capacitiesof200MWorabove,thepolarizationindexshallbemeasuredanditshallnotbelessthan2.0.
Theinsulationofmachinewindingshallmeettherequirementsinitem1and2ofArticle4.0.3
3
beforetheACvoltagewithstandtest.
Measurementoninsulationresistanceofinternalwatercoolinggeneratorwindingshallbe
4-
carriedoutunderthecircumstancethattheeffectofresidualwateriseliminated.
Astomachinethatitswatercatchmentpipeispermanentlygrounded,themeasurementshall
5
becarriedoutunderthecircumstanceofnowater;ifitisnotpermanentlygrounded,theinsulation
resistanceshallbemeasuredforwindingandwatercatchmentpiperespectively.Inordertoeliminatethe
effectofwater,theshieldingmethodshallbeappliedtothemeasurementoftheinsulationresistanceof
winding.Themeasuredresultsshallconformtotheprovisionsstipulated專用bymanufacturer.
AstothequalifiedmachineinACvoltagewithstandtest,whenitsinsulationresistancevalueis
6
convertedintothatattheoperatingtemperature(machinewithepoxymicainsulationatnormal
-
temperature)inaccordancewiththeprovisionsofAppendixBtothisstandardandtheconvertedvalue
isnotlowerthantheratedvoltagemultipliedby1MΩ/kV,itmaybeputintooperationwithoutdrying.
However,itsendcoversshallnotbeopenedupforinternalworkingbeforetheoperation.
MeasurementonDCresistanceofstatorwindingshallmeetthefollowingrequirements:
4.0.4
DCresistanceshallbemeasuredinthecoldstate.Duringthemeasurement,thetemperature
1
differencebetweenthewindingsurfaceandthesurroundingairshallbewithintherangeof±3℃.
AstoDCresistanceofeachphaseoreachbranchwinding,thedifferencesamongthemshall,
2
afterthedeviationsduetodifferentlengthsofleadwiresarecorrected,benotlargerthan2%ofits
minimumvalue.ComparedwiththeDCresistancevaluemeasuredatthetimeofdeliveryfromthe
factoryatthesametemperature,therelativechangeshallnotbelargerthan2%.
Astothehalfandhalfjointsassembledatsite,theconnectionofcontactsurfaceshallbe
3--
checkedaftertightening人人文庫thebolttorque.Moreover,themeasurementonDCresistanceofstatorwinding
shallbecarriedoutaftertheassemblyofhalfandhalfjointsatsite.
--
DCvoltagewithstandtestandleakagecurrentmeasurementofstatorwindingshallmeetthe
4.0.5
followingrequirements:
Testvoltageshallbethreetimesoftheratedvoltageofelectricmachine.
1
Testvoltageshallbeincreasedbystagesandattherateof50%ofratedvoltageeachstage.At
2
eachstage,thedurationofanappliedvoltageshallbe1minuteandthevalueofleakagecurrentshallbe
recorded.Underthestipulatedtestvoltages,theleakagecurrentsshallmeetthefollowingprovisions:
)Thevaluedifferencesofleakagecurrentamongallphasesshallnotbelargerthan100%ofthe
1
minimumvalue.Ifthemaximumleakagecurrentisbelow20μA,valuedifferencesamong
·7·
phasesmaynotbetakenintoaccountwhentheresultsofDCinsulationvalueandvoltage
withstandtestaresyntheticallyjudgedasgood.
)Theleakagecurrentshallnotincreasewiththeextensionoftime.
2
)Ifleakagecurrentincreasesremarkablyandisnotinproportiontovoltage,ananalysisshallbe
3
carriedouttimely.
)Ifeitherofsubitem1)and2)isnotcompliedwith,reasonsshallbefoundoutanddeviations
4-
shallbecorrected.
Thetestforhydrogencooledgeneratorshallbeconductedbeforefillinghydrogen.Itmustnot
3-
conducttestduringthereplacementofhydrogen.
Thelowvoltageshieldingmethodshouldbeappliedtothetestforinternalwatercooled
4--
generator;astogeneratorthatitswatercatchmentpipeispermanentlygrounded,thistestmaynotbe
doneatsite.
ACvoltagewithstandtestofstatorwindingshallmeetthefollowingrequirements:
4.0.6
VoltagesappliedinACvoltagewithstandtestofstatorwindingshallbedeterminedaccording
1
tothosesetoutinTable4.0.6.
InsulationACvoltagewithstandtestduringthetechnicalprocessofhydrogeneratorstator
2
windingassembledatsiteshallbecarriedoutinaccordancewiththecurrentnationalstandard
SpecificationInstallationofHydraulicTurbineGeneratorUnitsGB/T8564.
Thetestforinternalwatercooledgeneratorshallbeconducted專用underthecircumstancethat
3-
qualifiedwaterisfed;thetestforhydrogencooledgeneratorshallbeconductedbeforefillinghydrogen
-
anditmustnotconducttestduringthereplacementofhydrogen.
AstoACvoltagewithstandtestforgeneratorwithalargecapacity,whentestequipmentfor
4
powerfrequencyvoltagewithstandtestfailstomeetrequirement,itmaybereplacedbyresonant
withstandvoltage.
Table4.0.6Voltagesappliedinvoltagewithstandtestofstatorwinding
Capacity(kW)Ratedvoltage(V)Testvoltage(V)
Below10000Above361000+2×0.8thelowestis1200
(Un),
10000andtheaboveBelow240001000+2×0.8
(Un),
10000andtheabove24000andtheaboveNegotiatewithmanufacturer
Note""meanstheratedvoltageofgenerator.
:Un
Measurementoninsulationresistanceofrotorwindingshallmeetthefollowingrequirements:
4.0.7
Thevalueofinsulationresistanceofrotorwindingshouldnotbelowerthan0.5MΩ.
1人人文庫
Internalwatercooledrotorwindingshallbemeasuredbyusingmegohmmeterwithvoltageof
2-
500Vorbelow.Thevalueofinsulationresistanceshallnotbelowerthan5000Ω.
Inthecasethatinsulationresistanceofgeneratorstatorwindingmeetstherequirementsfor
3
startupandthevalueofinsulationresistanceofrotorwindingisnotlowerthan2000Ω,generatormay
-
beputintooperation.
Insulationresistanceofrotorwindingshallbemeasuredatratedrotatingspeedbeforeandafter
4
theoverspeedtest.
Thevoltageclassofmegohmmeterusedformeasurementofinsulationresistanceshallcomply
5
withthefollowingprovisions:
·8·
)Whentheratedvoltageofrotorwindingisabove200V,the2500Vmegohmmetershallbe
1
used.
)Whentheratedvoltageofrotorwindingis200Vorbelow,the1000Vmegohmmetershallbe
2
used.
Themeasurementoninsulationresistanceofrotorwindingshallmeetthefollowing
4.0.8
requirements:
TheDCresistanceofrotorwindingshallbemeasuredincoldstate.Duringthemeasurement,
1
thetemperaturedifferencebetweenthewindingsurfaceandthesurroundingairshallbenotlargerthan
3℃.ComparedwiththeDCresistancevaluemeasuredatthetimeofdeliveryfromthefactoryatthe
sametemperature,thedifferenceshallbelessthan2%.
Astosalientpoletyperotorwinding,allmagneticpolewindingsshallbemeasured;ifthe
2-
deviationexceedsthespecifiedvalue,theresistanceofconnectionpointamongallpolewindingsshall
alsobemeasured.
ACvoltagewithstandtestofrotorwindingshallmeetthefollowingrequirements:
4.0.9
Astosalientpoletyperotorreceivedintegrally,thetestvoltageshallbe7.5timesofrated
1
voltageandnotlessthan1200V.
Astosalientpoletyperotorassembledatworksite,thevoltagewithstandtestforitssingle
2
magneticpoleshallbedoneinaccordancewithprovisionsstipulatedbymanufacturer.TheACvoltage
withstandtestforrotorafteritsassemblyshallmeetthefollowingrequirements專用:
)Iftheratedexcitationvoltageis500Vorbelow,thevoltagewithstandvalueshallbe10times
1
ofratedexcitationvoltageandshallnotbelowerthan1500V.
)Iftheratedexcitationvoltageisabove500V,thevoltagewithstandvalueshallbe2timesof
2
ratedexcitationvoltageplus4000V.
TheACvoltagewithstandtestfornonsalientpoletyperotorwindingmaynotbeconducted.
3-
Suchatestmaybereplacedbythemeasurementoninsulationresistancebyusing2500Vmegohmmeter.
Themeasuredvaluesofinsulationresistancefortheexcitationcircuitsofgeneratorandexciter
4.0.10
togetherwiththeconnectedequipmentshallmeetthefollowingrequirements:
Thevalueofinsulationresistanceshallnotbelowerthan0.5MΩ.
1
Equipmentthatneedstomeasuretheinsulationresistanceshallnotincludegeneratorrotorand
2
exciterarmature.
Ifthereiselectronicpartorcomponentincircuit,theplugincomponentshallbepulledoutor
3-
itstwoendsshallbeshortcircuitedbeforestartingtest.
-
TheACvoltagewithstandtestfortheexcitationcircuitsofgeneratorandexcitertogetherwith
4.0.11人人文庫
theconnectedequipmentshallmeetthefollowingrequirements:
Thetestvoltageshallbe1000Vorsuchatestmaybereplacedbythemeasurementon
1
insulationresistancebyusing2500Vmegohmmeter.
EquipmentthatneedstocarryouttheACvoltagewithstandtestshallnotincludegenerator
2
rotorandexciterarmature.
Thetestvoltageforstationarythyristorexcitationofhydrogeneratorshallbeinaccordance
3
withitem2ofArticle4.0.9ofthisstandard.
Ifthereiselectronicpartorcomponentincircuit,theplugincomponentshallbepulledoutor
4-
itstwoendsshallbeshortcircuitedbeforestartingtest.
-
·9·
Measurementoninsulationresistanceforinsulatedbearingofgeneratorandexciteraswellas
4.0.12
inletwaterpedestalofrotorshallmeetthefollowingrequirements:
Themeasurementshallbeconductedbyusing1000Vmegohmmeteraftertheoilpipeis
1
installed.Thevalueofinsulationresistanceshallnotbelowerthan0.5MΩ.
Astohydrogencooledgenerator,theinsulationresistancesforboththeinternalandexternaloil
2-
preventorcoversshallbemeasured.Thevaluesshallmeettherequirementsstipulatedbymanufacturer.
Theinsulationresistanceofembeddedtypethermodetectorshallbemeasuredtocheck
4.0.13
whetheritisingoodcondition.Itshallmeetthefollowingrequirements:
Itshalluse250Vmegohmmetertomeasuretheinsulationresistanceofthermodetector.
1
Theindicatedvalueofthermodetectorshallbecheckedandtheresultshallbefreeof
2
abnormality.
Thetestonautomaticdeexcitationdeviceinexcitationcircuitofgeneratorshallmeetthe
4.0.14-
followingrequirements:
Theactionsequencefornormallyopen/closecontact,maincontactandarcextinguishing
1
contactinmaincircuitofautomaticdeexcitationswitchshallbeinaccordancewiththesequence
-
designedbymanufacturer.
Thedeexcitationtestforsynchronousgeneratorshallbeconductedatnoloadratedvoltage;
2--
thearcextinguishingofdeexcitationswitchshallbenormal.
-
Thevoltagesforopeningandclosingofdeexcitationswitch專用shallcomplywiththe
3-
requirementsintechnicaldocumentsofproduct.Whenthevoltageappliedtodeexcitationswitchis
-
above80%ofitsratedvoltage,theswitchshallbereliablyclosed;whenitis30%-65%ofrated
voltage,theswitchingoffshallbereliablyopened;whenitislessthan30%ofratedvoltage,thede
--
excitationswitchshallnotact.
ThemeasurementonACimpedanceandpowerlossofrotorwindingshallmeetthefollowing
4.0.15
requirements:
Measurementsshallberespectivelymadeinsideandoutsidetheboreofstatorinstaticstateas
1
wellasbeforeandaftertheoverspeedtestatratedrotatingspeed.
Astosalientpoleelectricmachine,themeasurementforeachpolewindingmaybemade
2-
outsidethebore.Itshallbenoobviousdifferencebycomparisonofthemeasuredvalues.
Thepeakvalueofappliedvoltageduringthetestshallnotexceedthevalueofratedexcitation
3
voltage.
Brushlessexcitermaynotbemeasurediftheconditionsofmeasurementarenotavailable.
4
Measurementoncharacteristiccurveofthreephaseshortcircuitshallmeetthefollowing
4.0.16人人文庫--
requirements:
Thedifferencebetweenthemeasuredvalueandthevalueinfactoryacceptancetestforproduct
1
shallbewithinerrorlimit.
Astogeneratortransformerunit,ifthereisfactoryacceptancetestreportonshortcircuit
2--
characteristicsofgenerator,itmayonlyrecordtheshortcircuitcharacteristicsofgeneratortransformer
--
unitwithshortcircuitpointbeingsetonthehighvoltagesideoftransformer.
--
Measurementonnoloadcharacteristiccurveshallmeetthefollowingrequirements:
4.0.17-
Thedifferencebetweenthemeasuredvalueandthevalueinfactoryacceptancetestforproduct
1
shallbewithinerrorlimit.
·10·
Themaximumvaluesoftestvoltageatratedrotatingspeedshallbe120%ofstatorsrated
2
voltageforsteamturbinegeneratorandsynchronouscompensatorand130%forhydrogenerator.
-
However,theratedvalueofexcitationcurrentshallnotbeexceeded.
Ifthereisinterturninsulationingenerator,theinterturnvoltagewithstandtestshallbedone.The
3
testshalllast5minutesat130%ofstatorsratedvoltagebutnotlargerthanthemaximumvoltageofstator.
Astogeneratortransformerunit,ifthereisfactoryacceptancetestreportonnoload
4--
characteristicsofgenerator,itmayonlyrecordthenoloadcharacteristicsofgeneratortransformerunit
--
withvoltagebeingincreasedto110%ofstatorsratedvoltage.
Themeasurementondeexcitationtimeconstantandrotorsovervoltagetimeswhengenerator
4.0.18-
isatnoloadratedvoltageshallmeetthefollowingrequirements:
-
Themeasurementandrecordingofdeexcitationtimeconstantshallbemadewhenstator
1-
windingisopencircuitedandgeneratorisatnoloadratedvoltage.
--
Astogeneratortransformerunit,themeasurementmaybemadeatthesametimetogether
2-
withunloadedtransformer.Theovervoltagetimesofrotorshallbecheckedatthesametime.Itshall
guaranteethattheovervoltagevalueofrotorisnotlargerthan30%ofvoltagevaluemeasuredinfactory
acceptancetestofexcitationwindingwhenthevalueofexcitationcurrentislessthan1.1timesofvalue
ofratedcurrent.
Themeasurementofresidualvoltageofgeneratorstatorshallmeetthefollowingrequirements:
4.0.19
Theresidualvoltageofstatorshallbemeasuredaftertheswitching專用offofdeexcitationdevice
1--
whengeneratorisatnoloadratedvoltage.
-
Ifthevalueofresidualvoltageofstatorislarge,safetyprecautionshallbetakenduringthetest.
2
Measurementonphasesequenceofgeneratorshallbeinlinewiththephasesequenceofpower
4.0.20
grid.
Measurementonshaftvoltageshallmeetthefollowingrequirements:
4.0.21
Itshallbemadeatnoloadratedvoltageandafterloadingrespectively.
1-
Whenbearingoilfilmofsteamturbinegeneratorisshortcircuited,thevalueofvoltage
2--
betweenbearingandenginebaseshallbeclosetothatattwoendsofrotorshaft.
Thevoltageofhydrogeneratorshafttoitsenginebaseshallbemeasured.
3
Thedynamiccharacteristictestofstatorwindingendshallmeetthefollowingrequirements:
4.0.22
Thesteamturbinegeneratorwithvoltageof200MWoraboveshallbetested.Ifthevoltageof
1-
steamturbinegeneratorislessthan200MW,whethertoconducttestornotshallbedeterminedasper
-
specificcircumstances.
Whensteamturbineorgasturbinegeneratorisincoldstate,therangeforshunningthenatural
2人人文庫--
frequencyofwindingbar,leadwire,andtheintegralellipseatwindingendshallbeinaccordancewith
thestipulationsinTable4.0.22.Inaddition,itshallalsobeinaccordancewiththecurrentnational
standard
DynamicCharacteristicandVibrationMeasurementMethodofTurbo-generatorsonStator
GB/T20140
WindingsandEvaluationCriteria.
MeasurementonDCvoltageappliedtomanuallywoundinsulationatstatorwindingendshall
4.0.23
meetthefollowingrequirements:
Iftheleadwiresatgeneratorendsareassembledatsite,themeasurementshallbemadeby
1
applyingDCvoltageafterinsulationwrappingmaterialsaredried.
TheDCvoltageappliedtostatorwindingshallbe"U"theratedvoltageofgenerator.
2n-
·11·
Table4.0.22Rangeforshunningthenaturalfrequencyofpartialandintegralellipseatstator
windingendofsteam-turbineorgas-turbinegenerator
RatedrotatingNaturalfrequencyofNaturalfrequencyofNaturalfrequencyofintegral
Typeofsupport
speedwindingbar(Hz)leadwire(Hz)ellipse(Hz)
Rigidsupport≤95,≥106≤95,≥108≤95,≥110
3000
Flexiblesupport≤95,≥106≤95,≥108≤95,≥112
Rigidsupport≤114,≥127≤114,≥130≤114,≥132
3600
Flexiblesupport≤114,≥127≤114,≥130≤114,≥134
TheDCelectricpotentialmeasuredatthesurfaceofwindingshallnotbelargerthanthevalue
3
stipulatedbymanufacturer.
Ifmanufacturerhasconductedtestsforsomepositionswithtestrecordsbeingmade,these
4
positionsmaynotbetested.
Themethodandlimitsforventilationtestofrotorshallcomplywiththerelevantprovisionsin
4.0.24
thecurrentprofessionalstandardMethodsandLimitsforCheckingtheDirectGasVentilationCooling
SystemofTurbogeneratorRotorJB/T6229.
Themethodandlimitsforwaterflowtestshallcomplywiththerelevantprovisionsinthe
4.0.25
currentprofessionalstandardCheckingMethodsandEvaluationofWaterCircuitwithintheWinding
ofTurboGeneratorJB/T6228.專用
人人文庫
·12·
5DCMotor
TestitemsofDCmotorshallincludethefollowingcontents:
5.0.1
Measurementoninsulationresistanceofexcitationwindingandarmature;
1
MeasurementonDCresistanceofexcitationwinding;
2
ACvoltagewithstandtestofexcitationwindingandarmature.
3
MeasurementonDCresistanceofadjustableexcitationresistor;
4
Measurementoninsulationresistanceofexcitationcircuitstogetherwithallconnected
5
equipment;
ACvoltagewithstandtestforexcitationcircuitstogetherwithallconnectedequipment;
6
Inspectiononpolarityofgeneratorwindingandthecorrectnessofitsconnection;
7
Inspectionontheneutralpositionofmotorbrushinmagneticfield;
8
MeasuringandrecordingthenoloadcharacteristicsofDCgeneratorsandtheload
9-
characteristiccurveofexciterwithrotorwindingasload;
InspectionontheidlerunofDCgeneratorandmeasuringitsnoloadcurrent.
10-
ThehandovertestitemsforDCmotorsofvarioustypesshallmeet專用thefollowingrequirements:
5.0.2-
Thetestforexciterofsynchronousgeneratorandsynchronouscompensatorwithvoltageof
1
above6000kWshallbeconductedinaccordancewithallitemsofArticle5.0.1ofthisstandard.
ThetestforotherDCmotorsshallbeconductedinaccordancewithitem1,2,4,5,7,8and10
2
ofArticle5.0.1ofthisstandard.
Themeasuredinsulationresistancevaluesofexcitationwindingandarmatureshallnotbelower
5.0.3
than0.5MΩ.
ThedifferencebetweenthemeasuredvalueofDCresistanceofexcitationwindingandthatat
5.0.4
thetimeofdeliveryfromthefactoryshallbelessthan2%.
TheACvoltagewithstandtestforexcitationwindingtoshellorforarmaturewindingtoshaft
5.0.5
shallmeetthefollowingrequirements:
TheACvoltagewithstandtestforexcitationwindingtoshellorforarmaturewindingtoshaft
1
shallbeconducted.
Thetestvoltageshallbe1.5timesofratedvoltageplus750Vandnotlessthan1200V.
2
ThemeasurementofDCresistancefortheadjustableexcitationresistorshallmeetthefollowing
5.0.6人人文庫
requirements:
ThedifferencebetweenthemeasuredvalueofDCresistanceandthatatthetimeofdelivery
1
fromthefactoryshallbelessthan10%.
Duringtheadjustment,theadjustableexcitationresistorshallbewellcontactedandfreeof
2
brokencircuit.Thevalueofresistanceshallshowaregularchange.
Themeasurementoninsulationresistanceofexcitationcircuittogetherwiththeconnected
5.0.7
equipmentshallmeetthefollowingrequirements:
Themeasuredvalueofinsulationresistanceforexcitationcircuitstogetherwithallconnected
1
equipmentshallnotbelowerthan0.5MΩ.
·13·
Equipmentthatneedstobemeasuredshallnotincludecircuitsofexcitationregulationdevice.
2
TheACvoltagewithstandtestconductedforexcitationcircuittogetherwiththeconnected
5.0.8
equipmentshallmeetthefollowingrequirements:
Thetestvoltageshallbe1000V.Suchatestcanbereplacedbymeasurementoninsulation
1
resistancebyusing2500Vmegohmmeter.
Equipmentthatneedstobetestedshallnotincludecircuitsofexcitationregulationdevice.
2
Thepolarityofmotorwindinganditsconnectionshallbecheckedwiththeresultsbeingcorrect.
5.0.9
Theinspectionofneutralpositionofmotorbrushinmagneticfieldshallmeetthefollowing
5.0.10
requirements:
Theneutralpositionofmotorbrushshallbeadjusteduntiltheresultiscorrect;
1
Itshallsatisfytherequirementofgoodcommutation.
2
ThemeasurementandrecordofnoloadcharacteristicsofDCgeneratorsandtheload
5.0.11-
characteristiccurveofexciterwithrotorwindingasloadshallmeetthefollowingrequirements:
Thereshallbenosignificantdifferencebycomparisonofthemeasuredcurveandthatin
1
deliverytestreport;
Theloadcharacteristicsofexcitershouldbemeasuredandrecordedtogetherwiththenoload
2-
andshortcircuittestofsynchronousgeneratoratthesametime.
TheinspectionofidlerunningandmeasurementofnoloadcurrentcarriedoutforDCgenerator
5.0.12-
shallmeetthefollowingrequirements:專用
Thetimespanofidlerunningshouldnotbelessthan30min.Thecontactsurfacebetweenbrush
1
andcommutatorshallbefreeofobvioussparks;
ThenoloadcurrentofDCmotorshallberecorded.
2-
人人文庫
·14·
6Intermediate-frequencyGenerator
Thetestitemsofintermediatefrequencygeneratorshallincludethefollowingcontents:
6.0.1-
Measurementoninsulationresistanceofwinding;
1
MeasurementonDCresistanceofwinding;
2
ACvoltagewithstandtestofwinding;
3
Measurementandrecordofnoloadcharacteristiccurve;
4-
Measurementofphasesequence;
5
Measurementoninsulationresistanceofthermometer;itshallbecheckedtoseewhetheritisin
6
goodcondition.
Themeasuredvalueofinsulationresistanceofwindingshallnotbelowerthan0.5MΩ.
6.0.2
ThemeasurementonDCresistanceofwindingshallmeetthefollowingrequirements:
6.0.3
AstoDCresistanceofeachphaseoreachbranchwinding,thedifferencebetweenthemeasured
1
valueandthatmeasuredatthetimeoffactoryacceptancetestshallnotbelargerthan2%;
ThereshallbenosignificantdifferencebycomparisonofthemeasuredDCresistancevalueof
2
excitationwindingandthatmeasuredatthetimeoffactoryacceptancetest專用.
ThevoltagevalueofACvoltagewithstandtestforwindingshallbe75%ofthatinitsfactory
6.0.4
acceptancetest.
Themeasurementandrecordingofnoloadcharacteristiccurveshallmeetthefollowing
6.0.5-
provisions:
Whenthetestvoltageisincreasedandreachesthevalueofvoltageinfactoryacceptancetest,it
1
shallnotbeincreasedfurther.Thereshallbenosignificantdifferencebycomparisonofthemeasured
valueofvoltageandthatinfactoryacceptancetest.
Astothepermanentmagneticintermediatefrequencygenerator,thecurveofrelationship
2--
betweenvoltageofgeneratoranditsspeedshallbemeasuredandrecorded.Thereshallbenosignificant
differencebycomparisonofthemeasuredcurveandthatinfactoryacceptancetest.
Whenphasesequenceismeasured,thelabelnumbersofoutletterminalsofmotorshallbeinline
6.0.6
withphasesequence.
Theinsulationresistanceofthermometershallbemeasuredandcheckedtoseewhetheritisin
6.0.7
goodcondition.The人人文庫followingprovisionsshallbemet:
Itshalluse250Vmegohmmetertomeasuretheinsulationresistanceofthermometer.Itsstatus
1
shallbegood.
Theindicatedvalueofthermometershallbecheckedandtheresultshallbefreeofabnormality.
2
·15·
7ACMotor
TestitemsofACmotorshallincludethefollowingcontents:
7.0.1
Measurementoninsulationresistanceandabsorptionratioofwinding;
1
MeasurementonDCresistanceofwinding;
2
DCvoltagewithstandtestandmeasurementonleakagecurrentofstatorwinding;
3
ACvoltagewithstandtestonstatorwinding;
4
ACvoltagewithstandtestonrotorwindingofwoundrotortypemotor;
5
ACvoltagewithstandtestonrotorwindingofsynchronousgenerator;
6
Measurementofinsulationresistanceforadjustableresistor,startingresistor,anddeexcitation
7-
resistor;
MeasurementofDCresistanceforadjustableresistor,startingresistor,anddeexcitation
8-
resistor;
Measurementoninsulationresistanceofmotorbearing;
9
Inspectiononpolarityofstatorwindingandcorrectnessofitsconnection;
10
Inspectiononnoloadrunningofmotorandmeasurementonits專用noloadcurrent.
11--
Thetestformotorwithvoltageofbelow1000Vandcapacityofbelow100kWmaybe
7.0.2
conductedinaccordancewithitem1,7,10and11ofArticle7.0.1ofthisstandard.
Measurementoninsulationresistanceandabsorptanceofwindingshallmeetthefollowing
7.0.3
requirements:
Iftheratedvoltageisbelow1000V,thevalueofinsulationresistanceatnormaltemperatureshall
1
notbelessthan0.5MΩ;ifitis1000Vorabove,theconvertedvalueofinsulationresistanceatoperating
temperatureshallnotbelowerthan1MΩ/kVforstatorwindingandnotbelessthan0.5MΩ/kVforrotor
winding.ThetemperatureconversionofinsulationresistancemaybemadeinaccordancewithappendixB
tothisstandard.
Theabsorptionratioshallbemeasuredformotorswithvoltageof1000Vorabove.The
2
absorptionratioshallnotbelessthan1.2.Thesplitphasemeasurementshallbeappliedtothemotor
-
thatitsneutralpointcanbedismantled.
WhenACvoltagewithstandtestisconducted,theinsulationofwindingshallmeetthe
3
requirementsinItem人人文庫1and2ofthisArticle.
ForqualifiedmotorinACvoltagewithstandtest,itmaybeputintooperationwithoutbeing
4
driedwhentheconvertedvalueofitsinsulationresistanceatoperationtemperature(motorwithepoxy
-
micainsulationatnormaltemperature)isnotlowerthantheratedvoltageby1MΩ/kV.However,its
endcoversshallnotbeopenedupforinternalworkingbeforetheoperation.
ThemeasurementonDCresistanceofwindingshallmeetthefollowingprovisions:
7.0.4
Astomotorwithvoltageofabove1000Vorcapacityofabove100kW,thevaluedifferenceof
1
DCresistanceamongallphasesofmotorshallnotbelargerthan2%oftheminimumvalue.
TheDCresistancebetweenwiresmaybemeasuredformotorwithnoleadwirebeingfromits
2
neutralpoint.Thedifferenceshallnotbelargerthan1%ofitsminimumvalue.
·16·
Astomotorwithspecialstructure,thedifferenceofitseachphasesDCresistanceandthe
3
correspondingvalueinpredeliverytestshallnotbelargerthan2%.
DCvoltagewithstandtestandleakagecurrentmeasurementforstatorwindingshallmeetthe
7.0.5-
followingprovisions:
Astostatorwindingwithvoltageofabove1000Vorcapacityofabove1000kW,ifits
1
connectingwireofneutralpointhasbeenledtotheterminalboardofoutgoingwire,DCvoltage
-
withstandingtestshallbecarriedoutateachphaseofwinding.
Testvoltageshallbe3timesofratedvoltageofstatorwinding.Underthestipulatedtest
2
voltage,thevaluedifferenceofleakagecurrentamongallphasesshallnotbelargerthan100%ofthe
minimumvalue;whenthemaximumleakagecurrentisbelow20μA,thevaluedifferenceamongall
phasesmaynotbeconsiderediftheinsulationresistancevaluesandresultsofvoltagewithstandtestare
comprehensivelyjudgedtobegood.
ThetestshallbeinaccordancewiththerelevantprovisionsinArticle4.0.5;thistestmaynotbe
3
conductedinthecasethattheconnectingwireofneutralpointhasnotbeenledout.
VoltageappliedinACvoltagewithstandtestofstatorwindingshallbeinaccordancewiththe
7.0.6
provisionsinTable7.0.6.
Table7.0.6VoltageofACvoltagewithstandtestonwindingofmotorstator
Ratedvoltage(kV)3610
VoltageappliedintestkV510專用16
()
VoltageappliedinACvoltagewithstandtestofwindingofwoundmotorrotorshallbein
7.0.7
accordancewiththeprovisionsinTable7.0.7.
Table7.0.7VoltageappliedinACvoltagewithstandtestofwindingofwoundmotorrotor
OperatingconditionofrotorTestvoltage(V)
Irreversible1.5+750
Uk
Reversible3.0+750
Uk
Noteisthevoltagemeasuredinthecasethatrotorwindingisopencircuitedandrotorisinstaticstatewhileratedvoltageisappliedin
:Uk,
statorwinding.
TheACvoltagewithstandtestforrotorwindingofsynchronousmotorshallmeetthefollowing
7.0.8
requirements:
Thevoltageappliedintestshallbe7.5timesofratedexcitationvoltageandshallnotbeless
1
than1200V;
Thevoltageappliedintestshallnotbelargerthan75%ofthatinfactoryacceptancetest.
2人人文庫
Whentheinsulationresistancesaremeasuredforadjustableresistor,startingresistor,de
7.0.9-
excitationresistortogetherwithcircuit,themeasuredvaluesshallnotbelessthan0.5MΩ.
ThemeasurementofDCresistanceforadjustableresistor,startingresistor,anddeexcitation
7.0.10-
resistorshallmeetthefollowingrequirements:
ThedifferencebetweenthemeasuredDCresistancevaluesandthoseinfactoryacceptancetest
1
ofproductshallnotbelargerthan10%;
Duringtheadjustment,contactshallbeingoodconditionandfreeofopencircuit,andthe
2
changesofresistancevaluesshallbecharacterizedbyregularity.
·17·
Themeasurementoninsulationresistanceofmotorbearingshallmeetthefollowing
7.0.11
requirements:
Astomeasurementoninsulationresistanceofmotorbearingthatconnectedwithoilpipe,
1
1000Vmegohmmetershallbeusedformeasuringaftertheinstallationofoilpipe.
Thevalueofinsulationresistanceshallnotbelessthan0.5MΩ.
2
Inspectiononpolarityofstatorwindingandthecorrectnessofitsconnectionshallmeetthe
7.0.12
followingrequirements:
Thepolarityofstatorwindinganditsconnectionshallbecorrect.
1
Polaritymaynotbeinspectedinthecasethatwireofneutralpointisnotledout.
2
Inspectiononnoloadrunningofmotorandmeasurementonitsnoloadcurrentshallmeetthe
7.0.13--
followingrequirements:
Theoperatingtimefornoloadrunningofmotorshallbe2hours;
1-
Thenoloadcurrentduringnoloadrunningofmotorshallberecorded;
2--
Whentheconnectionbetweenmotoranditsmechanicalpartcannotbeseparatedeasily,they
3
maybeconnectedtogetherforconductinginspectiontestofnoloadrunning.
-
專用
人人文庫
·18·
8PowerTransformer
Testitemsofpowertransformershallincludethefollowingcontents:
8.0.1
InsulatingoiltestorSFgastest;
16
MeasurementonDCresistanceofwindingtogetherwithbushing;
2
Inspectiononvoltageratiosofalltaps;
3
Inspectiononthegroupofthreephaseconnectingwireoftransformerandthepolarityoflead
4--
outwireofsinglephasetransformer;
-
Measurementofinsulationresistanceforironcoreandclamp;
5
Testofnonceramicbushing;
6-
Inspectionandtestforonloadtapchanger;
7-
Measurementoninsulationresistance,absorptionratioorpolarizationindexofwinding
8
togetherwithbushing;
Measurementondielectriclosstangent(tanδ)andcapacitanceforwindingtogetherwith
9
bushing;
Deformationtestoftransformerwinding;專用
10
ACvoltagewithstandtestforwindingtogetherwithbushing;
11
Longdurationinducedvoltagewithstandtestwithpartialdischargemeasurementforwinding
12-
togetherwithbushing;
Impactclosingtestatratedvoltage;
13
Inspectiononphaseposition;
14
Measurementonnoise.
15
Thetestitemsforvariouskindsoftransformersshallbeinaccordancewiththefollowing
8.0.2
provisions:
Thetestforoilimmersedpowertransformerwithcapacityof1600kV·Aorbelowmaybe
1-
conductedinaccordancewithitem1,2,3,4,5,6,7,8,11,13and14ofArticle8.0.1ofthisstandard;
Thetestfordrytransformermaybeconductedinaccordancewithitem2,3,4,5,7,8,11,13
2
and14ofArticle8.0.1ofthisstandard;
Thetestforconvertertransformerorrectifiertransformermaybeconductedinaccordancewith
3
item1,2,3,4,5,6,人人文庫7,8,11,13and14ofArticle8.0.1ofthisstandard;
Thetestforelectricfurnacetransformermaybeconductedinaccordancewithitem1,2,3,4.5,
4
6,7,8,11,13and14ofArticle8.0.1ofthisstandard;
Thetestforgroundingtransformerorzigzagtransformermaybeconductedinaccordancewith
5
item2,3,4,5,6,8,11and13ofArticle8.0.1ofthisstandard;astooilimmersedtransformer,itshall
-
alsoconductthetestinaccordancewithitem1and9ofArticle8.0.1ofthisstandard;
Thetestforcorethroughtypecurrenttransformerorcapacitortypebushingshallbeconducted
6--
asperthetestitemsforinstrumenttransformerinChapter9andforbushinginChapter15ofthis
standardrespectively;
Astothetransformerthatistransportedinseparatepartsandassembledinsite,theorderer
7
·19·
shallwitnessallitsfactoryacceptancetestitems;thesitetestforitshallbeconductedinaccordancewith
thisstandard;
Inspectionshallbecarriedoutforaccessoriessuchasgasrelay,oilflowingrelay,pressurerelief
8
valve,gasdensityrelayandsoon.
ThetestforinsulationoilinoilimmersedtransformerorSFgasinSFgasinsulated
8.0.3-66
transformershallmeetthefollowingrequirements:
ThetestcategoriesofinsulationoilshallbeinaccordancewiththeprovisionsinTable19.0.2
1
ofthisStandard;thetestitemsandstandardsshallbeinaccordancewiththosespecifiedinTable19.0.1.
Thechromatographicanalysisofthedissolvedgasinoilshallmeetthefollowingrequirements:
2
)Astotransformerwithvoltageof66kVorabove,achromatographicanalysisfordissolvedgas
1
ininsulationoilwithintransformerbodyshallbemade24hoursafterthestandingofoil
injection,voltagewithstandandpartialdischargetests,andanotheranalysisshallbemade
aftertheimpactclosingtestand24houroperationatratedvoltage.
-
)TestshallbeconductedinaccordancewiththecurrentnationalstandardGuideforAnalysis
2
andDiagnosisofGasesDissolvedinTransformerOilGB/T7252.Thereshallbeno
significantdifferenceofcontentofhydrogen,acetylene,andtotalhydrocarboninvarious
measurements.
)Inoilofnewlyinstalledtransformer,thecontentoftotalhydrocarbon,HandCHshallnotbe
3-222
largerthan20μL/L,10μL/Land0.1μL/Lrespectively.專用
The
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- T/CGCC 21-2018擠壓糕點
- T/CEMTA 3.1-2023工業電子雷管通用型起爆器第1部分:性能規范
- T/CEMIA 007-2018光纖預制棒用高純氯
- T/CECS 10228-2022綠色建材評價透水鋪裝材料
- T/CCMA 0199-2024瀝青混合料攪拌設備舊料破碎篩分設備
- T/CCAA 39-2022碳管理體系要求
- T/CBMMAS 022-2023高耐腐鍍鋅鋁鎂彩涂鋼板
- T/CBMCA 003-2018模塊式集成灶用吸油煙機
- T/CBJ 3304-2024工坊啤酒產品認證與評價實施規則
- T/CBJ 1105-2023酒業數字藏品技術規范
- 老年人智能手機使用教程課件
- 3.6.3關門車課件講解
- 貴陽2024年貴州貴陽貴安事業單位招聘599人筆試歷年典型考題及考點附答案解析
- IATF16949-COP-內部審核檢查表+填寫記錄
- 實際控制人與法人協議模板
- 全屋家具定制合同
- 大數據技術基礎(第2版)全套教學課件
- 康養旅游區項目可行性研究報告
- 大鎖孫天宇小品《時間都去哪了》臺詞劇本完整版-一年一度喜劇大賽
- 中英文化對比智慧樹知到期末考試答案章節答案2024年武漢科技大學
- 電工儀表與測量(第六版)中職技工電工類專業全套教學課件
評論
0/150
提交評論