某橋梁畢業設計_第1頁
某橋梁畢業設計_第2頁
某橋梁畢業設計_第3頁
全文預覽已結束

下載本文檔

版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領

文檔簡介

1、摘要南骨干航道網整治工程”的組成部分,配合珥陵鎮市鎮道路改建工程進行建設。道路等級為城市主干路級;通航要求為級航道。本橋址的橋型方案設計主要考慮通航的要求。根據專業知識和查閱參考資梁橋作為推薦設計方案并對此方案進行了詳細的設計。截面,梁高 2.5 ,翼緣寬 19m,底板寬 12 ,腹板厚 0.35 ,主跨跨徑 50 ,混凝土采用 C50,預應力鋼束采用后張法張拉。力,根據結果設計出行車道板所需的鋼筋數量。在計算主梁恒載和活載內力時,進行內力組合,繪出全橋不同橫截面的內力圖。算。進行下部結構計算時:先根據計算出的上部結構內力的大小選擇支座的類驗算以及地基承載力驗算。里所學的知識系統的串聯了起來,

2、運用所學的知識解決了現實生活中的實際問提高。關鍵詞:連續梁、內力、截面、預應力、影響線、樁基礎IABSTRACTThe large bridge of East Red locates the Ling er town of Dan yang city in Jiangsu Province, surmounts the Dan gold canal. It is the Jiang su Province transportdepartment of the southern of Jiang su backbone route net renovates the project theco

3、nstituent, the coordinate mausoleum town path rebuilds the project to carry on theconstruction. The rank of path is the city host II level; the request of open tonavigation is V level of routes.The design of bridge site major consideration navigable clearancerequirements .Then according to the speci

4、alized knowledge and the consult reference,it has formulated three plans: The prestressed concrete continuous bridge; thepre-stressed consecution bridge and the center receive type arched bridge. Throughthe plan comparison, choosing the prestressed concrete continuous bridge as therecommendation des

5、ign proposal and have carried on the further design regarding.The prestressed continuous beam bridge includes the superstructure、thesubstructure、the bearing and the accessory. The main beam is box beam and 2.5meters in height, 19 meters in tope width and 12 meters in bottle width. The web is0.35 met

6、ers in width and detailed scales can get from the paper. The main beamcomputed span is 50 meters. The concrete mark is C50. The Construction method ofhigh tensile wire stranded steel is post-tensioning methods.When superstructure computation, first of all, according to the category of roadsand the v

7、ehicles Loa, the king post upper limb board the endogen force has beencalculated, the design goes on a journey the steel bar quantity which the traffic laneboard needs. When computation king post permanent load and variable load endogenforce, first of all I unit the king post division, then calculat

8、es in this foundation withthe finite element procedure the superstructure under the dead load function endogenforce, the displacement and the endogen force influence line. Increase in endogenforce influence on-line calculates the live load endogen force and carries on theendogen force combination, d

9、raws the entire bridge different lateral sectioning to tryhard. According to the above computed result, the prestressed reinforcement of theentire bridge has been arrangement. The computation loss of prestressed and thepre-stressed cause the inferiorendogenic force,the second endogen force has beenc

10、ombination again, final section it intensity.Choosing the support according to the superstructure endogen force size the type,again uses the rib type according to the bridge site geology situation; Using two pillartype of the bridge pier. The foundation uses the drill hole to pour into the pile and

11、thedefinite detail size. Finally, having carried on the substructure stability as well as theground supporting capacity.In this short more than three months graduation project time, I learn a lot ofknowledge. First I utilize the knowledge system which I studied at university in fouryears, then I used the knowledge to solve the actual problem in real life; Next Ilearned to design in the project according to the standard request on t

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
  • 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
  • 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論