調試檢查表格4-新風機組_第1頁
全文預覽已結束

下載本文檔

版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領

文檔簡介

1、 Project No(項目編號):Other Related Tests(其他相關測試): Participants 參加人Name(姓名Firm(公司Party filling out this form & witnessing(填表并證明方)Dateof Approvals(審核批準). This filled-out checklist has been reviewed. Its completion is approved. Exceptions are noted below or attached. (這份填寫完的表格已復查,并通過審批,另附呈如下)General Contr

2、actor Construction (總承包商(施工主管(日期Commissioning Owners The prefunctional checklist for this PAU is complete and Yes / (該 PAU 機組的預調試清單是否完整和審批過是/Testing, Adjusting and Balancing (TAB) completed and approved for the hydronic and air systems Yes / (水系統(tǒng)和空調系統(tǒng)的連接,其測試,調整,平衡(簡稱 TAB)已完成和獲批是/All A/E punchlist it

3、ems for this and related equipment are Yes / (所有的 A/E 整修清單項和相關設備均校正是/Functional testing is complete and approved for the connected VAV Boxes: N/A / Yes / (相連的 VAV 機組的功能測試已完成和獲批不適用/是/Functional testing is complete and approved for the variable frequency drive or variable inlet vane for this N/A / Yes

4、 / (PAU 的變頻驅動或者變進口風葉的功能性測試已完成和獲批不適用/是/Functional testing is complete and approved for the outside air fan(s) or outside air PAU serving this PAU:不適用/ Yes / No(為此 PAU 服務的室外風機或者室外 PAU 機組的功能性測試是否完成和批準/是/g) Sequence of operation is / (附操作流程h) Design setpoint information included on 是/ (表格中包括了設計設定值是/Cont

5、rols(控制DDC loops operational, temperature/pressure setpoints met without hunting:Yes / No DDC 循環(huán)操作,溫度/壓力設定值沒有偏移震是/Master transmission diagram is updated on device Yes / 設備圖上更新了主傳動裝置是/Graphic programming is complete and Yes / 文字圖表的編程是完整的和可操作是/System communicates with Yes / 系統(tǒng)連通主是/PAU is set to design

6、/final setpoints:Yes / No PAU 按設計設定值設是/Local reading of setpoints agree with remote Yes / 本地設定值的讀取響應遠程的讀是/The following have been started up, with startup reports and prefunctional checklists submitted and approved ready for functional testing:(下面已經(jīng)列出的是啟動報告和預調試清單,其已經(jīng)提交和獲批,為功能性測試準備就緒Exhaust Fan(s)(排風

7、機) Other(其他)These functional test procedures reviewed and approved by installing contractor and applicable subcontractors:Yes / No(這些功能性測試流程由安裝承包商和相應的分包商審查和批準是/FunctionalTestingProcedure(功能性測試流程步模Test測試流Expected Response 預期響過1PAU Off PAU commanded Off by BAS.AHU位于自動檔,BAS要求機組VerifybyvisualinspectionO

8、utsideairdampersareCoolingcoilvalveisSupplyairfanis目測檢查新風閥關冷卻盤管閥門關送風風2commanded On by BAS.PAU BAS 要求機VerifybyvisualinspectionOutsideairdampersareCoolingcoilvalveisSupplyairfanis目測檢查冷卻盤管閥門打送風風機開3PAU 運PAUinAutoposition. Supply Air Reset:Supply air (SA) discharge setpoint at initial value 55F.raise/low

9、er setpoint.Return the setpoint normalafterVerifybylocalandremotereadingSA dischargeinitial setpoint 55F,CHWvalve SA discharge temp matchs the 通過現(xiàn)場和遠程讀取送風出口溫度值與初始設定值55F 相AHU 位于自送風重置送風溫度初始值設定在通過 BAS 程序結束返回設定值至規(guī)4setpoint of CO2 concentration. 通過BAS 升高或降CO2 濃度Verify by visual inspection that: outside air dampers are modulated.Verify by local and remote reading that: VFD drive speed/freq vary.目測檢查:新風閥已調通過現(xiàn)場和遠程讀取確認:VFD /頻率變5 Alarmand With units running at low flow condition, reset static pressure setpoint below design setpoint and increase airflow.在機組低流量條件下運行時BAS indicates an alarm co

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
  • 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論