




版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
工程實體質量實測實量標準
(土建分冊)2016年9月目錄1目的2適用范圍3取樣總則4混凝土結構工程4.1基本原則··········································································································14.2截面尺寸偏差(砼結構)·····················································································24.3表面平整度(砼結構)························································································34.4垂直度(砼結構)······························································································44.5頂板水平度極差(砼結構)··················································································54.6樓板厚度樓梯相鄰踏步高差偏差(砼結構)···························································64.7門、窗洞口尺寸(砼結構)··················································································74.8施工控制線設置(砼結構)··················································································85砌筑工程5.1基本原則··········································································································95.2表面平整度(砌筑工程)·····················································································95.3垂直度(砌筑工程)·························································································105.4外門窗洞口尺寸偏差(砌筑工程)·······································································5.5方正度(砌筑工程)·························································································126抹灰工程136.1基本原則········································································································136.2墻體表面平整度(抹灰工程)·············································································136.3墻面垂直度(抹灰工程)···················································································146.4陰陽角方正(抹灰工程)···················································································156.5頂板水平度(抹灰工程)···················································································166.6方正度(抹灰工程)·························································································176.7凈高(抹灰工程)····························································································186.8地面表面平整度(抹灰工程)·············································································196.9地面平整度極差(抹灰工程)·············································································206.10房間開間進深偏差(抹灰工程)········································································21戶內門洞口尺寸偏差(抹灰工程)······································································226.12戶內門洞、外墻窗內側墻體厚度極差(抹灰工程)·················································226.13裂縫空鼓(抹灰工程)····················································································246.14同戶型同廚衛間管井尺寸偏差(抹灰工程)··························································246.15同戶型同廚衛間窗底框標高偏差(抹灰工程)·······················································256.16同戶型同廚衛間窗側框墻距偏差(抹灰工程)·······················································266.17柜體嵌入位尺寸偏差(抹灰工程)······································································276.18同戶型同廚衛間開間進深偏差(抹灰工程)·························································287涂飾工程或粉刷石膏面層307.1基本原則········································································································307.2墻面表面平整度(涂飾工程或粉刷石膏面層)························································307.3墻面垂直度(涂飾工程或粉刷石膏面層)······························································317.4陰陽角方正(涂飾工程或粉刷石膏面層)······························································327.5頂棚(吊頂)板水平度(涂飾工程或粉刷石膏面層)···············································337.6室內凈高偏差(涂飾工程或粉刷石膏面層)···························································347.7戶內門洞口尺寸偏差(涂飾工程或粉刷石膏面層)·················································357.8裂縫空鼓(涂飾工程或粉刷石膏面層)································································368墻面飾面磚工程368.1基本原則········································································································368.2表面平整度(墻面飾面磚工程)··········································································368.3垂直度(墻面飾面磚工程)················································································378.4陰陽角方正(墻面飾面磚工程)··········································································388.5接縫高低差(墻面飾面磚工程)··········································································398.6裂縫空鼓(墻面飾面磚工程)·············································································409地面飾面磚工程409.1基本原則········································································································409.2表面平整度(地面飾面磚工程)··········································································409.3接縫高低差(地面飾面磚工程)···········································································419.4裂縫空鼓(地面飾面磚工程)·············································································4210防滲漏工程4210.1基本原則·······································································································4210.2防水卷材厚度(地下室)··················································································4210.3防水卷材搭接長度(地下室)············································································4310.4陰陽角做圓(地下室)·····················································································4310.5保護層(地下室)···························································································4310.6衛生間涂膜厚度(廚衛間)···············································································4310.7找坡坡度(廚衛間)························································································4410.8砼反坎(廚衛間)···························································································4410.9外窗窗臺壓頂(外門窗)··················································································4410.10外窗滴水線、鷹嘴、排水坡度(外門窗)···························································45窗框封堵(外門窗)······················································································4510.12防水卷材厚度(屋面)···················································································4510.13搭接長度(屋面)·························································································4610.14樓梯間出屋面反坎、排氣道及煙道、屋面變形縫等屋面構件反坎(屋面)·················4610.15女兒墻(屋面)····························································································4610.16找坡坡度(屋面)·························································································47中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)1目的(1)規范工程實體質量實測實量的檢查方法、程序、取樣方法、測量操作、允許偏差、數據處理等具體步驟和要求。(2)提供工程實體質量實測實量的操作方法,盡可能消除人為操作引起的偏差。2適用范圍(1)本指引適用于所有在建工程(自結構±0.00至交付完成)項目。(2100%實測實量并建立分戶分層實測檔案。3取樣總則(1通過圖紙或隨機抽樣事前確定。(2)可追溯原則:對實測實量的各項目標段結構層或房間的具體樓棟號、房號做好書面記錄并存檔。(3不能有遺漏。(4)效率原則:在選取實測套房時,要充分考慮各分部分項的實測指標的可測性,使一套房包括盡可能多的實測指標,以提高實測效率。(5)真實原則:測量數據應反映項目的真實質量,避免為了片面提高實測指標,過度修補或做表面文章,實測取點時應規避相應部位,并對修補方案合理性進行檢查。4混凝土結構工程4.1基本原則4.1.1同一標段內根據各樓棟進度,在實測前隨機確定已拆完模板的2個樓層作為砼結構工程的實測層。4.1.2根據選取樓層結構平面圖,實測實量選點考慮每層結構4個角和中間砼剪力墻、柱。實測混凝土結構的截面尺寸每個實測層選取10個實測區,2個實測層累計20垂直度每個實測層選取個實測區,2個實測層累計40個實測區;窗洞口尺寸、門洞口尺寸每個實測層選取8個實測區,2個實測層累計16個實測區。4.1.3當實測同一樓層內頂板水平極差時,每個實測層選取5個實測區,2個實測層累計10個實測區,每個實測區實測5個點,每個點均作為1個計算點。1中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)4.2截面尺寸偏差(砼結構)4.2.1指標說明:反映層高范圍內剪力墻、砼柱施工尺寸與設計圖尺寸的偏差。4.2.2合格標準:截面尺寸偏差,+10]mm。4.2.3測量工具:5m鋼卷尺。4.2.4測量方法和數據記錄:(1)以鋼卷尺測量同一面墻柱截面尺寸,精確至毫米。(2)同一面墻柱面作為1個實測區,累計實測實量20個實測區,每個實測區從地面向上300mm和1500mm的位置各測量截面尺寸1次,選取其中與設計尺寸偏差最大的數,作為判斷該實測指標合格率的1個計算點。圖墻、柱截面尺寸測量示意圖2中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)4.3表面平整度(砼結構)4.3.1指標說明:反映層高范圍內剪力墻、砼柱表面平整程度。4.3.2合格指標:表面平整度偏差,。4.3.3測量工具:2m靠尺、楔形塞尺。4.3.4測量方法和數據記錄:(120個實測區。(2)當所選墻長度小于3米時,同一墻面4個角(頂部及根部)中取左上及右下2個角,按度角斜放靠尺,累計測2次表面平整度。跨洞口部位必測。這2個實測值分別作為該指標合格率的2個計算點。(33度角斜放靠尺測量2中間水平放靠尺測量13個實測值分別作為該指標合格率的3個計算點。(4)當取消抹灰層時,取樣、測量和記錄參照抹灰墻面平整度相關要求(第6.2圖墻平整度測量示意圖3中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)4.4垂直度(砼結構)4.4.1指標說明:反映層高范圍內剪力墻、砼柱表面垂直的程度。4.4.2合格指標:[0。4.4.3測量工具:2m靠尺。4.4.4測量方法和數據記錄:(1)任取墻柱一面作為1個實測區,累計實測實量20個實測區,其中抽取比例,內墻:外墻為12。(2)當墻長度小于3米時,同一墻面距兩端頭豎向陰陽角約30cm位置,分別按以下原則實測21下部地面位置時測12個實測值分別作為該指標合格率的2個計算點。(3)當墻長度大于3米時,同一墻面距兩端頭豎向陰陽角約30cm和墻中間位置,分別按以下原則實測31端接觸到下部地面位置時測1中時測13個實測值分別作為該指標合格率的3個計算點。(4)砼柱:任選砼柱四面中的兩面,分別將靠尺頂端接觸到上部砼頂板和下部地面位置時各測一次垂直度。這2個實測值分別作為該指標合格率的2個計算點。圖墻柱垂直度測量示意圖4中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)4.5頂板水平度極差(砼結構)4.5.1指標說明:選取同一功能房間砼頂板內四個角點和一個中點距離同一水平基準線之間5個實測值的極差值,綜合反映同一房間砼頂板的平整程度。4.5.2合格標準:[015]mm4.5.3測量工具:激光掃平儀、具有足夠剛度的5米鋼卷尺(或2m4.5.4測量方法和數據記錄:(1)同一功能房間砼頂板作為1個實測區,累計實測實量10個實測區。(2)使用激光掃平儀,在實測板跨內打出一條水平基準線,在同一實測區距頂板天花板線約30cm位置處選取4增加15個垂直距離。以最低點為基準點,計算另外四點與最低點之間的偏差,最大偏差值≤15mm時,5個偏差值(基準點偏差值以0515mm時,5個偏差植均按最大偏差值計算,作為該實測指標合格率的5個計算點。(3)所選2套中頂板水平度極差的實測區不滿足個時,需增加實測套房數。圖頂板水平度測量示意圖5中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)4.6樓板厚度樓梯相鄰踏步高差偏差(砼結構)4.6.1指標說明:反映同跨板的厚度施工尺寸與設計圖尺寸的偏差。4.6.2合格標準:,+10]mm,(樓梯相鄰踏步高差,6]mm)。4.6.34.6.4測量方法和數據記錄:(1101點位置為板塊跨中區域。(2)測量所抽查跨的樓板厚度,當采用非破損法測量時將測厚儀發射探頭與接收探頭分別1個實測值作為判斷該實測指標合格率的1個計算點。(3)所選2套房中樓板厚度偏差的實測區不滿足個時,需增加套房數。圖樓板厚度測量示意圖6中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)4.7門、窗洞口尺寸(砼結構)4.7.1指標說明:反映預留洞口尺寸與設計圖尺寸的偏差。4.7.2合格標準:[0。4.7.3測量工具:5米鋼卷尺或激光測距儀。4.7.4測量方法和數據記錄:(1)每一個門、窗洞口作為1個實測區,每層不少于個實測區,累計實測實量20個實22個實測值與設計值間的偏差最大值,作為判斷高度、寬度實測指標合格率的1個計算點。(2,該實測點按不合格計,并統一記錄為“1。(3)所選2套房中外門窗洞口尺寸偏差的實測區不滿足個時,需增加實測套房數。圖門、窗洞口測量示意圖7中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)4.8施工控制線設置(砼結構)4.8.1指標說明:反映砌筑、抹灰、裝修尺寸前期控制的偏差,以便控制砌筑、抹灰和裝修的尺寸精度,為砌筑、裝修房集中加工等提供控制條件。4.8.2高控制線。4.8.3測量工具:5m鋼卷尺。4.8.4測量方法和數據記錄:(1)每一面墻、每一個衛生間、每一個廚房各作為一個實測區,測量部位選擇正手墻面。累計實測實量10選取個測區。所選2套房中砌筑節點的實測區不滿足個時,需增加實測套房數。每1個實測區只取1個實測點,其實測值作為該指標合格率的1個計算點。(2)測量方法:采取目測、尺量方法,檢查同一實測區是否設置二線,其尺寸是否符合設計要求。(3)數據記錄:每一實測區未設置二線,則該實測點不合格;反之,則該實測點合格。不合格點均按“”記錄,合格點均按“0”記錄。圖施工控制線設置測量示意圖(1套房、14個實測區)8中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)5砌筑工程5.1基本原則5.1.1~4套房作為砌筑工程的實測套房。戶數最多的房型為必選。累計實測實量個實測區。5.1.2對于驗收以后需改造的墻體仍需作為實測區,相關標準不變。5.2表面平整度(砌筑工程)5.2.1指標說明:反映層高范圍內砌體墻體表面平整程度。5.2.2合格標準:[0。5.2.3測量工具:2m靠尺、楔形塞尺。5.2.4測量方法和數據記錄:(1)每一面墻都可以作為1個實測區,優先選用有門窗、過道洞口的墻面。測量部位選擇正手墻面。累計實測實量20個實測區。(2)當墻面長度小于,各墻面頂部和根部4個角中,取左上及右下2個角,按45斜放靠尺分別測量2次,其實測值作為判斷該實測指標合格率的2個計算點。(33m1次水平測量,3次測量值均作為判斷該實測指標合格率的3個計算點。(1個計算點。(5)所選2套房中墻面表面平整度的實測區不滿足10個時,需增加實測套房數。圖平整度測量示意圖9中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)5.3垂直度(砌筑工程)5.3.1指標說明:反映層高范圍內砌體墻體垂直的程度。5.3.2合格標準:[0。5.3.3測量工具:2米靠尺。5.3.4測量方法和數據記錄:(1)每一面墻都可以作為1個實測區,優先選用有門窗、過道洞口的墻面。測量部位選擇正手墻面。累計實測實量20個實測區。(2消除其測量值的影響,如兩米靠尺過高不易定位,可采用1米靠尺。(330cm測21地面約30cm位置時測12個實測值分別作為該指標合格率的2個計算點。(4)當墻長度大于3米時,同一墻面距兩端頭豎向陰陽角約30cm和墻中間位置,分別按以下原則實測31接觸到下部地面約30cm位置時測1方向居中時測13個實測值分別作為該指標合格率的3個計算點。(5)所選2套房中墻面垂直度實測區不滿足個時,需增加實測套房數。圖垂直度測量示意圖10中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)5.4外門窗洞口尺寸偏差(砌筑工程)5.4.1指標說明:反映洞口施工與圖紙的尺寸偏差,以及外門窗框塞縫寬度,間接反映窗框滲漏風險。5.4.2合格標準:[-10,+。5.4.3測量工具:5米鋼卷尺或激光測距儀。5.4.4測量方法和數據記錄:(1)對于平外墻面的門窗洞口:同一外門或外窗洞口均可作為1個實測區,累計實測實量20個實測區。測量時不包括抹灰收口厚度,以砌體邊對邊,各測量2次門、窗寬度及的21個計算點。(2,該實測點為按不合格計,并統一記錄為“1(3)所選2套房中外門窗洞口尺寸偏差的實測區不滿足個時,需增加實測套房數。圖門、窗洞口測量示意圖中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)5.5方正度(砌筑工程)5.5.1指標說明:考慮實測的可操作性,選擇同一房間內同一垂直面的砌體墻面與房間方正度控制線之間距離的偏差,作為實測指標,以綜合反映同一房間方正程度。5.5.2合格標準:≤。5.5.3測量工具:5米鋼卷尺、吊線或激光掃平儀。5.5.4測量方法和數據記錄:(1(2)砌體前距墻體3060cm范圍內彈出方正度控制線,并做明顯標識和保護。(3)同一墻面作為一個實測區,累計實測實量10個實測區。(4)在同一測區內,實測前需用5米卷尺或激光掃平儀對彈出的兩條方正度控制線,以短3為判斷該實測值指標合格率的1,則該套房內所有測區的實測值均按不合格計,并統一記錄為“1(,該實測點按不合格計,并統一記錄為“1。(6)所選2套房中方正度極差的實測區不滿足10個時,需增加實測套房數。圖方正度測量示意圖12中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)6抹灰工程6.1基本原則6.1.1實測前,根據同一標段內各樓棟進度隨機選取處于抹灰階段~4套房作為抹灰工程的實測套房。戶數最多的房型為必選。6.2墻體表面平整度(抹灰工程)6.2.1指標說明:反映層高范圍內抹灰墻體表面平整程度。6.2.2合格標準:≤。6.2.3測量工具:2m靠尺、楔形塞尺。6.2.4測量方法和數據記錄:(11202套房實測區不滿足20個時,需增加實測套房數。每一測區的實測值作為一個合格率計算點。(2)測量方法:同一實測區內當墻面長度小于4245度角斜放靠尺分別測量1次,在距離地面20cm左右的位置水平測量1當墻面長度大于,在同一墻面頂部和根部4個角中任選兩個方向各測量1次,在墻長度中間位置增加1次水平測量,在距離地面20cm左右的位置水平測量1次;所選實測區墻面優先考慮有門窗、過道洞口的墻面,在各洞口45度斜測一次;以上各實測值作為合格率1個計算點。(3)數據記錄:同一實測區,一個實測值作為一個合格率計算點。圖平整度測量示意圖13中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)6.3墻面垂直度(抹灰工程)6.3.1指標說明:反映層高范圍內抹灰墻體垂直的程度。6.3.2合格標準:≤。6.3.3測量工具:2米靠尺。6.3.4測量方法和數據記錄:(11202套房實測區不滿足20個時,需增加實測套房數。每一測區的實測值作為一個合格率計算點。(2)測量方法:同一實測區內當墻面長度小于,同一墻面距兩端頭豎向陰陽角約30cm位置,分別按以下原則實測21面位置時測1次垂直度;當墻長度大于330cm則實測31到下部地面位置時測11次垂直度。具備實測條件的門洞口墻體垂直度為必測項。(3)數據記錄:同一實測區,一個實測值作為一個合格率計算點。圖垂直度測量示意圖14中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)6.4陰陽角方正(抹灰工程)6.4.1指標說明:反映層高范圍內抹灰墻體陰陽角方正程度。6.4.2合格標準:≤。6.4.3測量工具:直角測量尺。6.4.4測量方法和數據記錄:(11202套房實測區不滿足20個時,需增加實測套房數。()選取對觀感影響較大的陰陽角,同一個部位,從地面向上1500mm位置分別測量1次。2次實測值作為判斷該實測指標合格率的2個計算點。圖陰陽角測量示意圖15中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)6.5頂板水平度(抹灰工程)6.5.1指標說明:考慮實際測量的可操作性,頂板膩子完成后,選取同一功能房間頂板內四5頂板的平整程度。6.5.2合格標準:≤。6.5.3測量工具:激光掃平儀、具有足夠剛度的5米鋼卷尺(或2m6.5.4測量方法和數據記錄:(1)已完成膩子找平的同一功能房間內頂棚作為1個實測區,累計實測實量10個實測區。(2)使用激光掃平儀,在實測房間內打出一條水平基準線,同一頂棚(吊頂)內距天花板線約30cm位置處選取4位增加1515mm15mm時,505個計算點;最大偏差值>10mm時,5個偏差植均按最大偏差值計算,作為該實測指標合格率的5個計算點。(2)所選2套房中頂棚水平度極差的實測區不滿足10個時,需增加實測套房數。圖頂板水平度測量示意圖16中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)6.6方正度(抹灰工程)6.6.1指標說明:考慮實測的可操作性,選擇同一房間內同一垂直面的墻面與房間方正度控制線之間距離的偏差,作為實測指標,以綜合反映同一房間方正程度。6.6.2合格標準:≤。6.6.3測量工具:5米鋼卷尺、吊線或激光掃平儀。6.6.4測量方法和數據記錄:(1(2)距墻體~60cm范圍內彈出方正度控制線,并做明顯標準和保護。(3)同一面墻作為一個實測區,累計實測實量15個實測區。(4)在同一測區內,實測前需用5米卷尺或激光掃平儀對彈出的兩條方正度控制線,以短3個實測點之間的極差,作為判斷該實測值指標合格率的1,則該套房內所有測區的實測值均按不合格計,并統一記錄為“1(,該實測點為按不合格計,并統一記錄為“1(6)所選2套房中方正度極差的實測區不滿足15個時,需增加實測套房數。圖方正度測量示意圖17中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)6.7凈高(抹灰工程)6.7.1指標說明:綜合反映同一房間內凈高實測值與理論值的偏差程度。6.7.2合格標準:±。6.7.3測量工具米鋼卷、激光測距儀。6.7.4測量方法和數據記錄:(1)每一個功能房間作為1個實測區,累計實測實量個實測區。(2)實測前,所選套房必須完成地面找平層施工,同時還需了解所選套房的各房間結構樓板的設計厚度和建筑構造做法厚度等。(3430cm附近各選取1面幾何中心位選取155個室內凈高值。當實測值與設計值最大偏差值,+10]mm時,5個偏差值的實際值作為判斷該實測指標合格率的510mm或<-10mm時,5個偏差值均按最大偏差值計。(4)所選2套房中室內凈高偏差的實測區不滿足個時,需增加實測套房數。圖室內凈高測量示意圖18中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)6.8地面表面平整度(抹灰工程)6.8.1指標說明:反映找平層地面表面平整程度。6.8.2合格標準:(1)毛坯房交付地面基層表面平整度≤;(2)面層為瓷磚或石材的地面基層表面平整度≤;(3)裝修房地板交付面表面平整度≤。6.8.3測量工具:2米靠尺、楔形塞尺。6.8.4測量方法和數據記錄:(1)每一個功能房間地面都可以作為1個實測區,累計實測實量(22度平放靠尺測量2房間中部區域測量一次,共測量3次。客、餐廳或較大房間地面的中部區域需加測1次。(3)同一功能房間內的3或4個地面平整度實測值,作為判斷該實測指標合格率的3或4個計算點。(4)所選2套房地面平整度偏差的實測區不滿足個時,需增加實測套房數。圖地面平整度測量示意圖19中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)6.9地面平整度極差(抹灰工程)6.9.1指標說明:考慮實際測量的可操作性,選取同一房間找平層地面四個角點和一個中點度。6.9.2合格標準:≤。6.9.3測量工具:激光掃平儀、具有足夠剛度的5米鋼卷尺(或2m6.9.4測量方法和數據記錄:(1)每個功能房間地面都可以作為1個實測區,累計實測實量10個實測區。(2)使用激光掃平儀,在實測板跨內打出一條水平基準線,同一實測區地面的4個角部區30cm以內各選取11地面與水平基準線之間的510mm15mm時,5準點偏差值以0515mm時,55個計算點。(2)所選2套房中地面水平度極差的實測區不滿足10個時,需增加實測套房數。圖地面水平度測量示意圖20中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)6.10房間開間進深偏差(抹灰工程)6.10.1指標說明:選用同一房間內開間、進深實際尺寸與設計尺寸之間的偏差。6.10.2合格標準:[-10,+10]mm。6.10.3測量工具:5米鋼卷尺、激光測距儀。6.10.4測量方法和數據記錄:(1)每個功能房間的開間和進深分別作為1個實測區,累計實測實量10個功能房間的10個實測區。(2)同一實測區內按開間(進深)方向測量墻體兩端的距離,各得到兩個實測值,比較兩10mm時不合格。(3)所選2套房中的所有房間的開間進深的實測區不滿足10個時,需增加實測套房數。圖6.10房間開間進深測量示意圖21中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)戶內門洞口尺寸偏差(抹灰工程)象。合格標準:高度偏差[-10,+10]mm;寬度偏差,+10]mm。測量工具:5米鋼卷尺。測量方法和數據記錄:(1)每一個戶內門洞都作為1個實測區,累計10個實測區。(2)實測前需了解所選套房各戶內門洞口尺寸。實測最好在施工完成地面找平層后,同一2度2次。高度2個測量值與設計值之間偏差的最大值,作為高度偏差的1個實測值;寬度2個測量值與設計值之間偏差的最大值,作為寬度偏差的1個實測值;每個實測值作為判斷該實測指標合格率的1個計算點。(4)所選2套房中戶內門洞口尺寸偏差的實測區不滿足個時,需增加實測套房數。6.12戶內門洞、外墻窗內側墻體厚度極差(抹灰工程)6.12.1程度,避免大小頭現象,影響交付觀感,同時提高收口面瓷磚集中加工的效率。6.12.2合格標準:≤。6.12.3測量工具:5米鋼卷尺。6.12.4測量方法和數據記錄:(1130面收口的平窗與凸窗實測區為15個,取樣比例為:2:;外窗實測區衛生間、廚房等四邊瓷磚收口外窗實測區為3套房實測區不滿足30房數。(2)實測時外墻窗框等測量部位需完成抹灰或裝飾收口。(3)同一戶型、同一部位的墻體厚度設計值為A。(4)對于戶內門洞、外墻平窗框內側墻體(涂飾完成后),在門、窗框側面中部各測量2次墻體厚度B1B2和頂端位置測量1次墻體厚度B33次實測值之間極差值作為判斷該實測指標合格率的1個計算點。(5)對于外墻凸窗框內側墻體,沿著與內墻面垂直方向,分別測量凸窗臺面兩端頭部位窗框與內墻抹灰完成面之間的距離。2個實測值之間極差值作為判斷該實測指標合格率的1個計算點。(6)對于廚房、衛生間平窗框內側墻體,在窗框側面中部各測量2B1B3和22中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)頂端位置測量1次墻體厚度B23次實測值的平均值B與A之間極差值作為判斷該實測指標合格率的1個計算點。圖6.13-1內門洞平常內側墻體厚度測量示意圖圖6.13-2凸窗內側墻體厚度測量示意圖23中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)6.13裂縫空鼓(抹灰工程)6.13.1指標說明:反映戶內墻體裂縫空鼓的程度。6.13.2合格標準:戶內墻體完成抹灰后,墻面無裂縫、空鼓。6.12.3測量工具:目測、空鼓錘。6.13.4測量方法和數據記錄:(1)實測區與合格率計算點:所選戶型內每一自然間內一面墻加一個門窗洞口作為1個實測區,1個實測區取1個實測值,1個實測值作為1個合格率計算點。所選2套房累計40個實測區,不滿足40個時,需增加實測套房數。(2)測量方法:同一實測區通過目測檢查所有墻體抹灰層裂縫,通過空鼓錘敲擊檢查所有墻體抹灰層空鼓。(3)數據記錄:同一實測區任何一面墻發現1條裂縫或1處空鼓,該實測點不合格。如無106.14同戶型同廚衛間管井尺寸偏差(抹灰工程)6.14.1不測此指標。6.14.2合格標準:,。6.14.3測量工具:5米鋼卷尺。6.14.4測量方法和數據記錄:(1)實測區與合格率計算點:累計選擇5個戶型,如不足5個戶型,按戶型套數自多向少2套房,2套房中同一位置廚衛間的管井作為一個實測區,每戶型廚房、衛生間的所有管井、煙道全選。(2)確定同一位置(同一戶型)管井的長度、寬度設計值,記為A1、B1。(3)分別測量A1B1讓你對應的2套房管井的長度、和寬度W1、W2;計算、與A1的偏差值P1;計算W1、與的偏差值P3P4;分別判斷P1P4的實測偏差值是否符合合格標準;一個實測值偏差值作為1個合格率計算點。(4)按(23)條的方法,分別測量其它戶型的實測偏差值,分別作為相應實測區的實測偏差值。每一實測值偏差值作為1個合格率計算點。24中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)圖6.14同戶型同廚衛間管井尺寸測量示意圖6.15同戶型同廚衛間窗底框標高偏差(抹灰工程)6.15.1指標。6.15.2合格標準:[-10,+10]mm。6.15.3測量工具:激光掃平儀、5米鋼卷尺。6.15.4測量方法和數據記錄:(1)實測區與合格率計算點:廚衛間的一個外窗作為一個實測區,所選戶型數量不少于2個;每戶型的所選套房為2套,累計實測區不足10個時,需增加不同戶型的廚衛間;如戶型不足,需增加同一戶型的套房數。(2)首先確定同一戶型同一位置廚衛間的瓷磚墻面窗口的相對標高數值B1。(3H1H2則以窗側框與水平標高線的交點作為測尺位,測量H2值。(4)測量同一實測區同一廚衛的瓷磚墻面窗框底部居中位(未抹灰收口階段)或窗臺抹灰收口底邊居中位(已抹灰收口階段)與激光水平線的距離,記為H3.(5A1=H1+H2-H3A1的偏差值P1P1符合合格標準;一個實測區的P1實測偏差值作為一個合格率計算點。(6)重復第(2)至(4)步驟,分別測量其他戶型的實測偏差值,分別作為相應實測區的實測偏差值。每一個實測區偏差值作為1個合格率計算點。25中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)圖6.15A1值的測量和計算參考圖6.16同戶型同廚衛間窗側框墻距偏差(抹灰工程)6.16.1測此指標。6.16.2合格標準:[-10,+10]mm。6.16.3測量工具:5米鋼卷尺。6.16.4測量方法和數據記錄:(1)實測區與合格率計算點:累計選擇5個戶型,如不足5個戶型,按戶型套數自多向少22套房中同一位置廚衛間的瓷磚墻面窗口作為一個實測區,每戶型所有廚房、衛生間的瓷磚窗口位全選。(2)確定同一位置(同一戶型)窗側框與墻距離的設計值,記為A。(3)測量同一實測區兩套房中同一廚衛的瓷磚墻面窗側框外邊居中位(未抹灰收口階段)距離,分別記為(A1B1B2;算A與(A1A2)的偏差值(P2,計算BB1B2Q1Q2P1P2、Q1Q2合格標準;一個實測區偏差值作為1個合格率計算點。(4)重復第(2)至()步驟,分別測量其他戶型的偏差值(P1P2、Q1、Q2作為相應實測區的實測偏差值。每一個實測區偏差值作為1個合格率計算點。26中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)圖6.16A1、B1值的測量和計算參考圖6.17柜體嵌入位尺寸偏差(抹灰工程)6.17.1工效率。毛坯房不測此指標。6.17.2合格標準:高度與寬度,+10],平整度≤,垂直度≤。6.17.3測量工具:5米鋼卷尺、靠尺、塞尺。6.17.4測量方法和數據記錄:(1)累計選擇5個戶型,如不足5個戶型,按戶型套數自多向少排序進行增加;每一戶型選擇22選。(2)實測前洞口需完成抹灰收口和地面找平層施工,以確保實測值的準確性。(3)實測最好在地面找平層完工后,同一柜體嵌入位尺寸沿寬度、高度、垂直度、平整度各測2次。若未完工,則只檢測柜體嵌入位尺寸沿寬度、垂直度、平整度各測2(42個測量值的最大值,作為平整度偏差的1個實測區;垂直度的2個測量值的最大值,作為垂直度偏差的1個實測區。(5)確定同一戶型同一位置的柜體嵌入位人寬度和高度的設計值,記為A、。(6A1A2B1B2;算AA1A2)的實測偏差值(P2,算B與(B1B2)的實測偏差值(Q1、Q2P1P2、Q1Q2)是否符合合格標準。(7)重復第(5)至()步驟,分別測量其他戶型的偏差值(P1P2、Q1、Q2作為相應實測區的實測偏差值。27中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)(8)每一個寬度、高度、垂直度、平整度的實測偏差值作為1個合格率計算點。(9)在同一測區內,測量兩個對角線作為柜體嵌入位尺寸測量的補充,兩對角線偏差值超過,該實測點為按不合格計,并統一記錄為“1圖6.17-1框體嵌入洞口測量示意圖(垂直度、平整度)圖6.17-2柜體嵌入位洞口測量示意圖(高、寬)6.18同戶型同廚衛間開間進深偏差(抹灰工程)6.18.1標。6.18.2合格標準:,。6.18.3測量工具:激光掃平儀、5米鋼卷尺。6.18.4測量方法和數據記錄:(1)實測區與合格率計算點:廚房或衛生間的各作為一個實測區,所選戶型數量不少于2個;每戶型的所選套房為2套,累計實測區不足10個時,需增加不同戶型的廚房、衛生間;如戶型不足,需增加同一戶型的套房數。(2)確定同一位置(同一戶型)廚衛間的開間、進深設計值,記錄為、。(3)同一位置(同一戶型)廚衛間按開間、進深分別測量兩次W1、和、;W1、W2的2個開間測量值與設計值W1個實測值;28中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)、的2個進深測量值與設計值L之間偏差值的最大值,作為進深偏差的1個實測2個偏差最大值作為判斷該實測指標合格率的2算點。(4)按第()至()條的方法,分別測量其他戶型的開間、進深實測最大偏差值,每一個開間、進深實測最大偏差值作為1合格率計算點。圖6.18開間、進深測量示意圖(1個戶型、3個測區、6個合格率計算點)29中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)7涂飾工程或粉刷石膏面層7.1基本原則實測前,根據同一標段內各樓棟進度隨機選取處于裝修涂飾階段(膩子面或涂料面)~4套房作為實測套房。戶數最多的戶型為必選。7.2墻面表面平整度(涂飾工程或粉刷石膏面層)7.2.1指標說明:反映層高范圍內涂飾墻體表面平整程度。7.2.2合格標準:≤。7.2.3測量工具:2m靠尺、楔形塞尺。7.2.4測量方法和數據記錄:(11152套房實測區不滿足15個時,需增加實測套房數。每一測區的實測值作為一個合格率計算點。(2)測量方法:同一實測區內當墻面長度小于4245度角斜放靠尺分別測量1次,在距離地面20cm左右的位置水平測量1當墻面長度大于,在同一墻面頂部和根部4個角中任選兩個方向各測量1次,在墻長度中間位置增加1次水平測量,在距離地面20cm左右的位置水平測量1次;所選實測區墻面優先考慮有門窗、過道洞口的墻面,在各洞口45度斜測一次;以上各實測值作為合格率1個計算點。(3)數據記錄:同一實測區,一個實測值作為一個合格率計算點。圖平整度測量示意圖30中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)7.3墻面垂直度(涂飾工程或粉刷石膏面層)7.3.1指標說明:反映層高范圍內涂飾墻體垂直的程度。7.3.2合格標準:≤。7.3.3測量工具:2米靠尺。7.3.4測量方法和數據記錄:(11152套房實測區不滿足15個時,需增加實測套房數。每一測區的實測值作為一個合格率計算點。(2)測量方法:同一實測區內當墻面長度小于,同一墻面距兩端頭豎向陰陽角約30cm位置,分別按以下原則實測21面位置時測1次垂直度;當墻長度大于330cm則實測31到下部地面位置時測11次垂直度。(3)數據記錄:同一實測區,一個實測值作為一個合格率計算點。圖垂直度測量示意圖31中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)7.4陰陽角方正(涂飾工程或粉刷石膏面層)7.4.1指標說明:反映層高范圍內涂飾墻體陰陽角方正程度。7.4.2合格標準:≤。7.4.3測量工具:直角測量尺。7.4.4測量方法和數據記錄:(11152套房實測區不滿足15個時,需增加實測套房數。(2)選取對觀感影響較大的陰陽角,同一個部位,從地面向上300mm和1500mm位置分別測量1次。2次實測值作為判斷該實測指標合格率的2個計算點。圖陰陽角測量示意圖32中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)7.5頂棚(吊頂)板水平度(涂飾工程或粉刷石膏面層)7.5.1指標說明:考慮實際測量的可操作性,選取同一房間頂棚(吊頂)四個角點和一個中頂)的平整程度。7.5.2合格標準:≤。7.5.3測量工具:激光掃平儀、具有足夠剛度的5米鋼卷尺(或2m7.5.4測量方法和數據記錄:(1)每個功能房間內作為1個實測區,累計實測實量個實測區。(2)使用激光掃平儀,在實測房間內打出一條水平基準線,同一頂棚(吊頂)內距天花板線約30cm位置處選取4位增加1510mm15mm505算點;最大偏差值>15mm時,5個偏差植均按最大偏差值計算,作為該實測指標合格率的5個計算點。(2)所選2套房的實測區不滿足10個時,需增加實測套房數。圖可為吊頂寬度的一半)33中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)7.6室內凈高偏差(涂飾工程或粉刷石膏面層)7.6.1指標說明:綜合反映同一房間室內凈高實測值與理論值的偏差程度。7.6.2合格標準:±。7.6.3測量工具米鋼卷、激光測距儀。7.6.4測量方法和數據記錄:(1)每一個功能房間作為1個實測區,累計實測實量個實測區。(2)實測前,所選套房必須完成地面找平層施工,同時還需了解所選套房的各房間結構樓板的設計厚度和建筑構造做法厚度等。(3430cm附近各選取1面幾何中心位選取155個室內凈高值。當實測值與設計值最大偏差值,+30]mm時,5個偏差值的實際值作為判斷該實測指標合格率的530mm或<-30mm時,5個偏差值均按最大偏差值計。(4)所選2套房中室內凈高偏差的實測區不滿足個時,需增加實測套房數。圖室內凈高測量示意圖34中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)7.7戶內門洞口尺寸偏差(涂飾工程或粉刷石膏面層)7.7.1指標說明:反映戶內門洞口尺寸實測值與設計值的偏差程度,避免出現“大小頭”現象。7.7.2合格標準:高度偏差,+10]mm;寬度偏差,+10]mm。7.7.3測量工具:5米鋼卷尺。7.7.4測量方法和數據記錄:(1)每一個戶內門洞都作為1個實測區,累計10個實測區。(2)實測前需了解所選套房各戶內門洞口尺寸。實測最好在施工完成地面找平層后,同一2度2次。高度2個測量值與設計值之間偏差的最大值,作為高度偏差的1個實測值;寬度2個測量值與設計值之間偏差的最大值,作為寬度偏差的1個實測值;每個實測值作為判斷該實測指標合格率的1個計算點。(4,該實測點為按不合格計,并統一記錄為“1(5)所選2套房中戶內門洞口尺寸偏差的實測區不滿足個時,需增加實測套房數。圖戶內門洞測量示意圖35中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)7.8裂縫空鼓(涂飾工程或粉刷石膏面層)7.8.1指標說明:反映戶內墻體裂縫空鼓和室內天花裂縫的程度。7.8.2合格標準:涂飾墻面無裂縫、空鼓。7.8.3測量工具:目測、空鼓錘。7.8.4測量方法和數據記錄:(1)實測區與合格率計算點:所選戶型內每一自然間內一面墻加一個門窗洞口作為1個實測區,所選套房內所有墻體和天花全檢。1個實測區取1個實測值,1個實測值作為1個合格率計算點。所選2套房累計個實測區,不滿足個時,需增加實測套房數。(2查所有墻體抹灰層和天花裂縫,通過空鼓錘敲擊檢查所有墻體抹灰層空鼓。(3)數據記錄:同一實測區任何一面墻發現1條裂縫或1處空鼓,該實測點不合格。如無108墻面飾面磚工程8.1基本原則8.1.12~4套房作為實測套房。戶數最多的戶型為必選。8.1.22套房的檢測指標為:表面平整度、垂直度、陰陽角方正、接縫高低差,累計實測實量10個實測區。8.2表面平整度(墻面飾面磚工程)8.2.1指標說明:反映層高范圍內飾面磚墻體表面平整程度。8.2.2合格標準:≤。8.2.3測量工具:2m靠尺、楔形塞尺。8.2.4測量方法和數據記錄:(1)每一套房內廚房、衛生間、陽臺或露臺的同一面墻都可以作為1個實測區,累計實測實量個實測區。(2)各墻面頂部或根部4個角中,取左上及右下2個角按45度角斜放靠尺分別測量12次測量值作為判斷該實測指標合格率的2個計算點。(3)所選2套房中表面平整度的實測區不滿足10個時,需增加實測套數。36中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)圖墻面磚平整度測量示意圖8.3垂直度(墻面飾面磚工程)8.3.1指標說明:反映層高范圍飾面磚墻體垂直的程度。8.3.2合格標準:瓷磚封面≤;石材墻面≤。8.3.3測量工具:2米靠尺。8.3.4測量方法和數據記錄:(1)每一套房內廚房、衛生間的同一面墻都可以作為1個實測區,累計實測實量8個實測區。(2)實測值主要反映飾面磚墻體垂直度,應避開墻頂梁、柱子突出部位。(3)每一個實測區測量2個點,其實測值作為判斷該實測指標合格率的2個計算點。(4)所選2套房中垂直度的實測區不滿足8個時,需增加實測套數。圖墻面磚垂直度測量示意圖37中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)8.4陰陽角方正(墻面飾面磚工程)8.4.1指標說明:反映層高范圍內飾面磚墻體陰陽角方正程度。8.4.2合格標準:≤。8.4.3測量工具:直角測量尺。8.4.4測量方法和數據記錄:(110個實測區。(2)一個陰角或陽角實測區,按、1500mm分別測量1次。2次測量值作為判斷該實測指標合格率的2個計算點。(3)所選2套房中陰陽角方正的實測區不滿足10個時,需增加實測套數。圖陰陽角測量示意圖38中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)8.5接縫高低差(墻面飾面磚工程)8.5.1指標說明:該指標反映墻面兩塊飾面磚接縫處相對高低偏差的程度,主要反映觀感質量。8.5.2合格標準:≤。8.5.38.5.4測量方法和數據記錄:(1)該指標宜在裝修收尾階段測量。每一套房內廚房、衛生間、陽臺或露臺的墻面都可以作為1個實測區,累計實測實量10個實測區。(2)在每個飾面磚墻面,目測選取2條疑似高低差最大的飾面磚接縫。用鋼尺或其他輔助工具緊靠相鄰兩飾面磚跨過接縫,用0.5mm鋼塞片插入鋼尺與飾面磚之間的縫隙。如2為判斷該實測指標合格率的2個計算點。(3)為數據統計方便和提高實測效率,不合格點均按記錄。合格點均按記錄。(4)所選2套房中墻面磚接縫高低差的實測區不滿足10個時,需增加實測套數。圖墻面磚接縫高低差測量示意圖39中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)8.6裂縫空鼓(墻面飾面磚工程)8.6.1指標說明:反映戶內廚房、衛生間等墻面飾面磚工程裂縫空鼓的程度。8.6.2合格標準:飾面磚墻面無裂縫、空鼓。8.6.3測量工具:目測、空鼓錘。8.6.4測量方法和數據記錄:(1)實測區與合格率計算點:所選戶型內有飾面磚墻面的廚房、衛生間等每一自然間內一面墻加一個門窗洞口作為1個實測區。累計實測實量10個實測區。1個實測區的實測值作為1個實測合格率計算點。所選2套房的實測區不滿足10個時,需增加實測套房數。(2(3)數據記錄:所選同一實測區只要發現有1條裂縫或通過空鼓錘敲擊發現有1處空鼓就可以認為該實測區的11按“”記錄,合格點均按“0”記錄。9地面飾面磚工程9.1基本原則9.1.1~4套房作為實測套房。戶數最多的戶型為必選。9.1.2所選2套房的檢測指標為:表面平整度、接縫高低差,累計實測實量8個實測區。9.2表面平整度(地面飾面磚工程)9.2.1指標說明:反映飾面磚地面平整程度。9.2.2合格標準:≤。9.2.3測量工具:2m靠尺、楔形塞尺。9.2.4測量方法和數據記錄:(1)地漏的匯水區域不測飾面磚地面表面平整度。(2)每一功能房間飾面磚地面都可以作為1個實測區。累計實測實量個實測區。(3445度平放靠尺共測量212或3次實測值作為判斷該實測指標合格率的2或3個計算點。(4衛間地面共測量22個計算點。(5)所選2套房中地面飾面磚表面平整度的實測區不滿足10個時,需增加實測套房數。40中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)圖地面磚平整度測量示意圖9.3接縫高低差(地面飾面磚工程)9.3.1指標說明:該指標反映地面兩塊飾面磚接縫處相對高低偏差的程度,主要反映觀感質量。9.3.2合格標準:≤。9.3.39.3.4測量方法和數據記錄:(1)該指標宜在裝修收尾階段測量。每一功能房間飾面磚地面都可以作為1個實測區,累計實測實量10個實測區。(2)在每個飾面磚地面,目測選取2條疑似高低差最大的飾面磚接縫。用鋼尺或其他輔助工具緊靠相鄰兩飾面磚跨過接縫,用0.5mm鋼塞片插入鋼尺與飾面磚之間的縫隙。如2為判斷該實測指標合格率的2個計算點。(3)為數據統計方便和提高實測效率,不合格點均按記錄。合格點均按記錄。(4)所選2套房中地面飾面磚接縫高低差的實測區不滿足10個時,需增加實測套數。圖地面磚接縫高低差測量示意圖41中國建筑第七工程局有限公司CHINACONSTRUCTIONSEVENTHENGINEERINGDIVISION.CORP.LTD工程實體質量實測實量標準(土建分冊)9.4裂縫空鼓(地面飾面磚工程)9.4.1指標說明:反映戶內廚房、衛生間、走道等地面飾面磚工程裂縫空鼓的程度。9.4.2合格標準:飾面磚地面無裂縫、空鼓(單塊磚邊角局部空鼓,且每自然間不超過總數5%9.4.3測量工具:目測、空鼓錘。9.4.4測量方法和數據記錄:(1)實測區與合格率計算點:所選戶型內有飾面磚地面的自然間,如廚房、衛生間、走道等,都作為1個實測區。累計實測實量10個實測區。1個實測區的實測值作為1個實測合格率計算點。所選2套房的實測區不滿足8個時,需增加實測套房數。(2(312認為該實測區的11“1”記錄,合格點均按“0”記錄。10防滲漏工程10.1基本原則實測前,根據同一標段內各樓棟進度隨機選取處于防水工程施工階段的2最多的房型為必選。10.2防水卷材厚度(地下室)12.2.1卷材厚度應滿足設計及規范要求。12.2.2測量工具:游標卡尺、5m卷尺。12.2.3測量方法和數據記錄:(1)現場隨機抽查2卷材料,每卷材料測量2次與合同要求進行比較。不同品牌、不同部位均要覆蓋,不滿足2個時,需增加卷材數量。(23×20mm三塊實樣,用卡尺測量厚度。(3)數據記錄:切片平均厚度小于設計厚度90%,或最小切片厚度小于設計厚度80%33個厚度實測值均為合格;同一測區31組)作為1個計算點,
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 嵌入式開發職業生涯交流試題及答案
- 測試執行中常見的錯誤與解決方案試題及答案
- 探索軟件缺陷管理的技巧試題及答案
- 公路交通工程試車試題及答案
- 四級計算機考試日常練習試題及答案
- 安全生產維修管理制度
- 廣東會所店長管理制度
- 出口企業備案管理制度
- 公路視頻監控管理制度
- 地面保潔人員管理制度
- 2024草原承包合同書
- 鋼結構閣樓合同范例
- 2022年首都師范大學計算機科學與技術專業《數據結構與算法》科目期末試卷A(有答案)
- 福建省福州教育學院附屬中學2025屆高考數學四模試卷含解析
- 全國扶貧開發信息系統業務管理子系統用戶操作手冊20171110(升級版)
- 4.1自由擴散和協助擴散課件高一上學期生物人教版必修1
- 主動脈夾層完整版課件
- 《飛向太空的航程》名師課件
- 科學普及講座模板
- 高標準農田 建設規范DB41-T 2412-2023
- 國開《Windows網絡操作系統管理》形考任務5-配置DNS服務實訓
評論
0/150
提交評論