1、HGU管溝施工方案 版次: A PAGE 3目 錄TOC o 1-2 h z u HYPERLINK l _Toc248024915 1、編制依據 PAGEREF _Toc248024915 h 1 HYPERLINK l _Toc248024916 1、Compilation Basis PAGEREF _Toc248024916 h 1 HYPERLINK l _Toc248024916 2、工程概況 PAGEREF _Toc248024916 h 1 HYPERLINK l _Toc248024916 2、General PAGEREF _Toc248024916 h 1 HYPERLI

2、NK l _Toc248024917 3、施工準備 PAGEREF _Toc248024917 h 2 HYPERLINK l _Toc248024918 3. Construction Preparation PAGEREF _Toc248024918 h 2 HYPERLINK l _Toc248024921 4、施工計劃部署 PAGEREF _Toc248024921 h 3 HYPERLINK l _Toc248024922 4. Construction Plan Arrangement PAGEREF _Toc248024922 h 3 HYPERLINK l _Toc248024

3、925 5、施工縫劃分 PAGEREF _Toc248024925 h 9 HYPERLINK l _Toc248024926 5. Division of Construction Joints PAGEREF _Toc248024926 h 9 HYPERLINK l _Toc248024927 6、墊層及替代砼的澆筑 PAGEREF _Toc248024927 h 10 HYPERLINK l _Toc248024928 6. Placing of Bedding Concrete and Constitute Concrete PAGEREF _Toc248024928 h 10 HY

4、PERLINK l _Toc248024929 7、腳手架工程 PAGEREF _Toc248024929 h 10 HYPERLINK l _Toc248024930 7、Scaffold Work PAGEREF _Toc248024930 h 10 HYPERLINK l _Toc248024949 8、模板工程 PAGEREF _Toc248024949 h 14 HYPERLINK l _Toc248024950 8.1 模板情況介紹 PAGEREF _Toc248024950 h 14 HYPERLINK l _Toc248024951 8.1 Introduction of Fo

5、rmwork PAGEREF _Toc248024951 h 14 HYPERLINK l _Toc248024952 8.2 廊道模板制作要求 PAGEREF _Toc248024952 h 14 HYPERLINK l _Toc248024953 8.2 Requirement for Pipeway Formwork Manufacturing PAGEREF _Toc248024953 h 14 HYPERLINK l _Toc248024954 8.3 模板安裝 PAGEREF _Toc248024954 h 14 HYPERLINK l _Toc248024955 8.4 模板拆除

6、 PAGEREF _Toc248024955 h 15 HYPERLINK l _Toc248024956 8.4 Stripping of Formwork PAGEREF _Toc248024956 h 16 HYPERLINK l _Toc248024957 9. 鋼筋工程 PAGEREF _Toc248024957 h 16 HYPERLINK l _Toc248024958 9.1 鋼筋材質及制作 PAGEREF _Toc248024958 h 16 HYPERLINK l _Toc248024959 9.1 Reinforcement Material and Fabricatio

7、n PAGEREF _Toc248024959 h 16 HYPERLINK l _Toc248024960 9.2 鋼筋保護層 PAGEREF _Toc248024960 h 17 HYPERLINK l _Toc248024961 9.2 Cover of Reinforcement PAGEREF _Toc248024961 h 17 HYPERLINK l _Toc248024962 9.3 鋼筋連接 PAGEREF _Toc248024962 h 17 HYPERLINK l _Toc248024963 9.3 Reinforcement Connection PAGEREF _To

8、c248024963 h 17 HYPERLINK l _Toc248024964 9.4 鋼筋的防污染保護 PAGEREF _Toc248024964 h 18 HYPERLINK l _Toc248024965 9.4 Contamination Proof of Reinforcement PAGEREF _Toc248024965 h 18 HYPERLINK l _Toc248024966 10、混凝土工程 PAGEREF _Toc248024966 h 18 HYPERLINK l _Toc248024985 11、質量保證 PAGEREF _Toc248024985 h 24 H

9、YPERLINK l _Toc248024989 12、安全文明施工措施 PAGEREF _Toc248024989 h 25 HYPERLINK l _Toc248024990 13、計算書 PAGEREF _Toc248024990 h 26 PAGE 65HGU管溝施工方案Construction Methods Statement On HGO1、編制依據1. Compilation Basis臺山核電站一期常規島土建工程施工合同Civil Work Contract of Taishan Nuclear Power Station Conventional Island(Phase

10、1);歐標技術規格書 (B版)European Standard Technical Specification(Edition B)HGU管溝施工圖紙Construction Drawings of HGU Pipeway臺山核電站一期常規島土建工程現場施工情況Civil Work On-site Construction Condition of Taishan Nuclear Power Station Conventional Island(Phase 1)工程概況2. General臺山核電站一期工程HGU管溝是連接循環水虹吸井(HCA)與重要廠用水泵房(HPA/C)專設的重要冷卻水

11、管溝。采用核島反應堆坐標系(坐標以1980西安坐標系為準),反應堆廠房標高0.00相對于8.7m(國家85高程系),所有標高都以反應堆廠房的相對標高為準;HGU管溝外截面大部分為3.5m3.5m,內孔大部分截面為2.5m2.5m的方孔,側壁及底板、頂板均為500mm厚的現澆鋼筋混凝土結構;結構需進行找坡,找坡坡度分別為0.3%、0.34%與0.38%。HGU管溝替代砼及墊層采用C25砼,主體結構采用歐標C35/45砼;管溝共計10段(060069段)。In Taishan Nuclear Power Station project(Phase 1), HGU is essential cool

12、ing water pipeway which is dedicated to link the recycled water siphon well(HCA) and essential service pump station(HPA/C). Coordinate system of NuclearIsland reactor is applied(XI AN Coordinate System 1980). Level 0.00 of reactor building corresponds to 8.7m of National Elevation Datum 1985. All le

13、vels relate to the reference level of reactor building. The outside section of HGU is largely square hole of 3.5m3.5m and inside section is largely square hole of 2.5m2.5m. The side wall, base slab and top slab of the pipeway are reinforcement concrete structure of 500mm thick which shall be cast in

14、 situ.The slop shall be made in structure and the slope varies from 0.3%, 0.34% to 0.38%. The C25 concrete shall be applied to the HGU Pipeway constitute concrete and bedding concrete, while EN C35/45 concrete shall be applied to the main structure. The pipeway has 10 sections in total(from 060 to 0

15、69).施工準備3. Construction Preparation3.1人員安排:3.1 Personnel Preparation隊長:羅澤軍;全面負責HGU管溝的施工管理與現場協調工作。Team Leader: Luo Zejun, responsible for comprehensive construction management and site coordination of HGU pipeway.鋼筋工長:彭廣理;負責HGU管溝鋼筋的綁扎與驗收工作。Reinforcement Foreman: Peng Guangli, responsible for the rein

16、forcement fixing and acceptance of it in HGU pipeway.木工工長:周貴偉;負責HGU管溝模板的支護與驗收工作。Carpentry Foreman: Zhou Guiwei, responsible for formwork installation and acceptance of it in HGU pipeway.混凝土工長:黃建根;負責HGU管溝模板的支護與驗收工作。Concrete Foreman: Huang Jiangen, responsible formwork installation and acceptance of i

17、t in HGU pipeway.技術員:劉志強;負責HGU管溝施工過程中技術問題及技術交底工作。Technician: Liu Zhiqiang, responsible to resolve technical difficulties and technical annotation during HGU pipeway construction. QC1: 張嚴光;負責HGU管溝施工過程中的質量監督、檢查工作。QC1: Zhang Yanguang, responsible for quality supervision and inspection during HGU pipewa

18、y construction. QC2: 劉煒;負責HGU管溝施工過程中的W、H點進行復檢,對其它工序進行抽檢驗證等工作。QC2: Liu Wei, responsible for recheck of point W and H and sampling inspection of otherprocess.安全員:李永全;負責HGU管溝施工過程中安全監督、檢查和文明施工管理工作。Safety Officer: Li Yongquan, responsible for safety supervision&inspection and civilizedconstruction manage

19、ment.測量員:2名;負責HGU管溝施工過程中測量放線工作。2 Survey Crew: responsible for setting-out during HGU pipeway construction.資料員:負責HGU管溝施工過程中圖紙和文件的接收,編制驗收資料(國標和ETF)等工作。Document Controller: responsible for receiving drawings and documents and compiling acceptance documents(national standard and ETF document) during HGU

20、 pipeway construction.在結構施工高峰期,計劃進場工人:木工15人,鋼筋工20人,混凝土工20人、焊工2人、架子工 15人,特殊工種,必須經過培訓,有上崗證,持證上崗。Durding the peak period of structure construction, it is planned to mobilize: 15 woodworkers; 20 reinforcement workers, 20 concrete workers, 2 welders, 15 scaffolders.Workers of special posts shall attend t

21、raining and get work license.3.2 機具準備3.2 Equipment and Machinery Preparation結構施工高峰期混凝土澆筑設備:Concrete placing equipments during peak period of structure construction: 序號No.設備名稱 Equipment Name型號 Model工作能力 Capability備注 Note1混凝土攪拌運輸車Concrete Mixing TruckJGC5292GJB8m5臺5 Sets2混凝土汽車泵Concrete Auto Pump140-10

22、0m3/8.5-12Mpa/44.5m120m3/h-49m1臺1 Set3混凝土振動棒Concrete VibratorZN5055mm20根20 Sets注:砼澆筑時主體隊需儲備雨布,防止雨水對砼質量的影響;夜間施工需增加照明燈具。Note: During concrete placing, the Main Structure Team shall prepare rain cloth to prevent the concrete quality from being affected by the rain. Lighting equipment shall be prepared

23、during night construction. 施工計劃部署4. Construction Plan ArrangementHGU管溝計劃從2009年11月8日開工,到2010年2月7日完工(除60、62、63、69段的上段部分外),總工期92天,下表為具體部署:The construction of HGU pipeway is planned to start on November 8th of 2009 and to be finished on February 7th of 2010(the upper section of 60th, 62nd, 63rd and 69th

24、 Section are not completed during this period). The construction lasts for 92 days and following is detailed schedule:任務名稱 Project Name工期Construction Period開始時間Start Time完成時間Completion TimeHGU專設重要冷卻水廊道 Essential Cooling Water Pipeway(HGU)92 d2009-11-8 8:002010-2-7 17:00HG-66段 HG-66 Section65 d2009-1

25、1-8 8:002010-1-11 17:00下段 Lower Section50 d2009-11-8 8:002009-12-27 17:00替代、墊層施工Construction of Constitute and Bedding Concrete4 d2009-11-8 8:002009-11-11 17:00鋼筋綁扎(包括止水鋼板安裝)Reinforcement Fixing(including installation of waterstop steel plate)5 d2009-12-18 8:002009-12-22 17:00模板支設Formwork Installati

26、on3 d2009-12-23 8:002009-12-25 17:00隱蔽驗收Concealed Work Acceptance1 d2009-12-26 8:002009-12-26 17:00砼澆筑Concrete Placing1 d2009-12-27 8:002009-12-27 17:00上段 Upper Section13 d2009-12-30 8:002010-1-11 17:00砼鑿毛Concrete Roughening1 d2009-12-30 8:002009-12-30 17:00墻體鋼筋綁扎Wall Reinforcement Fixing3 d2009-12-

27、31 8:002010-1-2 17:00墻體模板支設Wall Formwork Installation3 d2010-1-3 8:002010-1-5 17:00內支撐架搭設Inner Bracing Frame Installation3 d2010-1-3 8:002010-1-5 17:00頂模鋪設Top Formwork Installation2 d2010-1-6 8:002010-1-7 17:00頂板鋼筋綁扎Top Slab Reinforcement Fixing2 d2010-1-8 8:002010-1-9 17:00隱蔽驗收Concealed Work Accept

28、ance1 d2010-1-10 8:002010-1-10 17:00砼澆筑Concrete Placing1 d2010-1-11 8:002010-1-11 17:00HG-64段 HG-64 Section65 d2009-11-8 8:002010-1-11 17:00下段 Lower Section50 d2009-11-8 8:002009-12-27 17:00替代、墊層施工Construction of Constitute and Bedding Concrete4 d2009-11-8 8:002009-11-11 17:00鋼筋綁扎(包括止水鋼板安裝)Reinforce

29、ment Fixing(including installation of waterstop steel plate)5 d2009-12-18 8:002009-12-22 17:00模板支設 Formwork Installation3 d2009-12-23 8:002009-12-25 17:00隱蔽驗收Concealed Work Acceptance1 d2009-12-26 8:002009-12-26 17:00砼澆筑Concrete Placing1 d2009-12-27 8:002009-12-27 17:00上段 Upper Section13 d2009-12-30

30、 8:002010-1-11 17:00砼鑿毛Concrete Roughening1 d2009-12-30 8:002009-12-30 17:00墻體鋼筋綁扎Wall Reinforcement Fixing3 d2009-12-31 8:002010-1-2 17:00墻體模板支設Wall Formwork Installation3 d2010-1-3 8:002010-1-5 17:00內支撐架搭設Inner Bracing Frame Installation3 d2010-1-3 8:002010-1-5 17:00頂模鋪設Top Formwork Installation2

31、d2010-1-6 8:002010-1-7 17:00頂板鋼筋綁扎Top Slab Reinforcement Fixing2 d2010-1-8 8:002010-1-9 17:00隱蔽驗收Concealed Work Acceptance1 d2010-1-10 8:002010-1-10 17:00砼澆筑Concrete Placing1 d2010-1-11 8:002010-1-11 17:00HG-65段 HG-65 Section52 d2009-11-8 8:002009-12-29 17:00下段 Lower Section39 d2009-11-8 8:002009-12

32、-16 17:00替代、墊層施工Construction of Constitute and Bedding Concrete4 d2009-11-8 8:002009-11-11 17:00鋼筋綁扎(包括止水鋼板安裝)Reinforcement Fixing(including installation of waterstop steel plate)5 d2009-12-7 8:002009-12-11 17:00模板支設Formwork Installation3 d2009-12-12 8:002009-12-14 17:00隱蔽驗收Concealed Work Acceptance

33、1 d2009-12-15 8:002009-12-15 17:00砼澆筑Concrete Placing1 d2009-12-16 8:002009-12-16 17:00上段 Upper Section13 d2009-12-17 8:002009-12-29 17:00砼鑿毛Concrete Roughening1 d2009-12-17 8:002009-12-17 17:00墻體鋼筋綁扎Wall Reinforcement Fixing3 d2009-12-18 8:002009-12-20 17:00墻體模板支設Wall Formwork Installation3 d2009-1

34、2-21 8:002009-12-23 17:00內支撐架搭設Inner Bracing Frame Installation3 d2009-12-21 8:002009-12-23 17:00頂模鋪設Top Formwork Installation2 d2009-12-24 8:002009-12-25 17:00頂板鋼筋綁扎Top Slab Reinforcement Fixing2 d2009-12-26 8:002009-12-27 17:00隱蔽驗收Concealed Work Acceptance1 d2009-12-28 8:002009-12-28 17:00砼澆筑Concr

35、ete Placing1 d2009-12-29 8:002009-12-29 17:00HG-67段 HG-67 Section30 d2009-11-30 8:002009-12-29 17:00下段 Lower Section17 d2009-11-30 8:002009-12-16 17:00替代、墊層施工Construction of Constitute and Bedding Concrete3 d2009-11-30 8:002009-12-2 17:00鋼筋綁扎(包括止水鋼板安裝)Reinforcement Fixing(including installation of w

36、aterstop steel plate)5 d2009-12-7 8:002009-12-11 17:00模板支設Formwork Installation3 d2009-12-12 8:002009-12-14 17:00隱蔽驗收Concealed Work Acceptance1 d2009-12-15 8:002009-12-15 17:00砼澆筑Concrete Placing1 d2009-12-16 8:002009-12-16 17:00上段 Upper Section13 d2009-12-17 8:002009-12-29 17:00砼鑿毛Concrete Rougheni

37、ng1 d2009-12-17 8:002009-12-17 17:00墻體鋼筋綁扎Wall Reinforcement Fixing3 d2009-12-18 8:002009-12-20 17:00墻體模板支設Wall Formwork Installation3 d2009-12-21 8:002009-12-23 17:00內支撐架搭設Inner Bracing Frame Installation3 d2009-12-21 8:002009-12-23 17:00頂模鋪設Top Formwork Installation2 d2009-12-24 8:002009-12-25 17:

38、00頂板鋼筋綁扎Top Slab Reinforcement Fixing2 d2009-12-26 8:002009-12-27 17:00隱蔽驗收Concealed Work Acceptance1 d2009-12-28 8:002009-12-28 17:00砼澆筑Concrete Placing1 d2009-12-29 8:002009-12-29 17:00HG-68段 HG-68 Section51 d2009-11-30 8:002010-1-19 17:00下段 Lower Section38 d2009-11-30 8:002010-1-6 17:00替代、墊層施工Con

39、struction of Constitute and Bedding Concrete3 d2009-11-30 8:002009-12-2 17:00鋼筋綁扎(包括止水鋼板安裝)Reinforcement Fixing(including installation of waterstop steel plate)5 d2009-12-28 8:002010-1-1 17:00模板支設Formwork Installation3 d2010-1-2 8:002010-1-4 17:00隱蔽驗收Concealed Work Acceptance1 d2010-1-5 8:002010-1-5

40、 17:00砼澆筑Concrete Placing1 d2010-1-6 8:002010-1-6 17:00上段 Upper Section13 d2010-1-7 8:002010-1-19 17:00砼鑿毛Concrete Roughening1 d2010-1-7 8:002010-1-7 17:00墻體鋼筋綁扎Wall Reinforcement Fixing3 d2010-1-8 8:002010-1-10 17:00墻體模板支設Wall Formwork Installation3 d2010-1-11 8:002010-1-13 17:00內支撐架搭設Inner Bracing

41、 Frame Installation3 d2010-1-11 8:002010-1-13 17:00頂模鋪設Top Formwork Installation2 d2010-1-14 8:002010-1-15 17:00頂板鋼筋綁扎Top Slab Reinforcement Fixing2 d2010-1-16 8:002010-1-17 17:00隱蔽驗收Concealed Work Acceptance1 d2010-1-18 8:002010-1-18 17:00砼澆筑Concrete Placing1 d2010-1-19 8:002010-1-19 17:00HG-61段 HG

42、-61 Section59 d2009-11-22 8:002010-1-19 17:00下段 Lower Section46 d2009-11-22 8:002010-1-6 17:00替代、墊層施工Construction of Constitute and Bedding Concrete3 d2009-11-22 8:002009-11-24 17:00鋼筋綁扎(包括止水鋼板安裝)Reinforcement Fixing(including installation of waterstop steel plate)5 d2009-12-28 8:002010-1-1 17:00模板支

43、設Formwork Installation3 d2010-1-2 8:002010-1-4 17:00隱蔽驗收Concealed Work Acceptance1 d2010-1-5 8:002010-1-5 17:00砼澆筑Concrete Placing1 d2010-1-6 8:002010-1-6 17:00上段 Upper Section13 d2010-1-7 8:002010-1-19 17:00砼鑿毛Concrete Roughening1 d2010-1-7 8:002010-1-7 17:00墻體鋼筋綁扎Wall Reinforcement Fixing3 d2010-1

44、-8 8:002010-1-10 17:00墻體模板支設Wall Formwork Installation3 d2010-1-11 8:002010-1-13 17:00內支撐架搭設Inner Bracing Frame Installation3 d2010-1-11 8:002010-1-13 17:00頂模鋪設Top Formwork Installation2 d2010-1-14 8:002010-1-15 17:00頂板鋼筋綁扎Top Slab Reinforcement Fixing2 d2010-1-16 8:002010-1-17 17:00隱蔽驗收Concealed Wo

45、rk Acceptance1 d2010-1-18 8:002010-1-18 17:00砼澆筑Concrete Placing1 d2010-1-19 8:002010-1-19 17:00HG-62、HG-60段 HG-62 and HG-60 Section25 d2010-1-3 8:002010-1-27 17:00下段 Lower Section12 d2010-1-3 8:002010-1-14 17:00替代、墊層施工Construction of Constitute and Bedding Concrete4 d2010-1-3 8:002010-1-6 17:00鋼筋綁扎

46、(包括止水鋼板安裝)Reinforcement Fixing(including installation of waterstop steel plate)3 d2010-1-7 8:002010-1-9 17:00模板支設Formwork Installation3 d2010-1-10 8:002010-1-12 17:00隱蔽驗收Concealed Work Acceptance1 d2010-1-13 8:002010-1-13 17:00砼澆筑Concrete Placing1 d2010-1-14 8:002010-1-14 17:00HG-69、HG-63段 HG-69 and

47、 HG-63 Section28 d2010-1-11 8:002010-2-7 17:00下段 Lower Section11 d2010-1-11 8:002010-1-21 17:00替代、墊層施工Construction of Constitute and Bedding Concrete4 d2010-1-11 8:002010-1-14 17:00鋼筋綁扎(包括止水鋼板安裝)Reinforcement Fixing(including installation of waterstop steel plate)3 d2010-1-15 8:002010-1-17 17:00模板支設

48、Formwork Installation2 d2010-1-18 8:002010-1-19 17:00隱蔽驗收Concealed Work Acceptance1 d2010-1-20 8:002010-1-20 17:00砼澆筑Concrete Placing1 d2010-1-21 8:002010-1-21 17:00施工縫劃分5. Division of Construction Joints按照施工圖紙,HGU管溝驗槽后應立即澆筑墊層,逐段施工。主體隊需按照工程部編制的進度計劃完成每個控制點的施工。每段在底板頂面以上500mm的位置設一水平施工縫,每段砼分為上下兩次澆筑。Acco

49、rding to the construction drawing, the bedding concrete shall be placed by section immediately after the inspection of HGU foundation subsoil. The main structure team shall finish the construction of every control-point according to the schedule compiled by the engineering department. A horizontal c

50、onstruction joint shall be set at the position which is 500mm upper the top base slab face and the concrete of every section shall be placed for two times(the upper part and the lower part). 每段施工工序如下:Following is construction process of every section: 清基-測量放線-墊層施工-搭設外架-鋼筋綁扎、安裝止水膠帶、止水鋼板-支設第一次砼模板-澆筑第一

51、次砼-砼養護-鋼筋綁扎、安裝止水膠帶、預埋管-搭設內模板支撐架-支設第二次砼模板-澆筑第二次砼-砼養護-土方回填Clean of foundationsetting-outconstruction of bedding concreteinstallation of external scaffoldreinforcement fixing, installation of rubber and steel plate waterstopinstallation of first stage concrete formworkplacing of first stage concretecon

52、crete curingreinforcement fixing, installation of rubber waterstop and embedding of pipesinstallation of internal formwork bracing frameinstallation of second stage concrete formworkplacing of second stage concreteconcrete curingbackfilling墊層及替代砼的澆筑6. Placing of Bedding Concrete and Constitute Concr

53、ete6.1 管溝墊層混凝土可根據現場具體情況分段澆筑,測量隊應依據設計圖紙每段找坡要求放線,管溝結構砼不再找坡。6.1 The bedding concrete of pipeway shall be placed by section according to the site condition. The survey team shall be setting out according to the requirement of making-slop in the design drawing and theres no need to make slope in the pipe

54、way structural concrete. 6.2 管溝墊層混凝土采用C25砼,對于超挖部位需采用替代混凝土澆筑,替代混凝土較厚的部位需分層澆筑,分層厚度為40cm。6.2 The C25 concrete shall be applied to the pipeway bedding concrete. The part which is over-excavated shall placed with constitute concrete. If the constitute concrete is thick, it shall be placed layer by layer

55、and each layer is 40cm in thickness.6.3 墊層及替代混凝土根據現場情況可采用泵車或地泵由一端向另一端逐漸推進澆筑。6.3 According to the site condition, the bedding and constitute concrete shall be placed gradually by pump truck or floor type pump from one end to another. 6.4 混凝土振搗參見砼振搗工作程序。6.4 Refer to Work Procedure of Concrete Vibratio

56、n for vibration method.6.5 墊層及替代混凝土澆筑后應進行澆水養護。6.5 After placing, the bedding concrete and constitute concrete shall be sprayed with water for curing.腳手架工程7、Scaffold Work7.1腳手架的搭設7.1 Installation of Scaffold7.1.1 HGU管溝外雙排架采用扣件式鋼管腳手架,483.5鋼管,立桿橫距0.9m,縱距1.5m,掃地桿距根部為300mm,其它步距為1800mm,操作層平鋪4塊200寬木跳板,內立桿離

57、廊道邊距離400mm。7.1.1 Outside the pipeway, the double-row scaffold is coupler-style and made ofF48x3.5 steeltubes.The transversal spacing ofvertical poles is 0.9m, the longitudinal spacing is 1.5m. Thedistance between bottom pole and floor shall be 300mm and spacing of other horizontal polesshall be 1800

58、mm. The working platform shall be covered with 4 wooden putlogs which is 200in width.The distance between internal vertical pole and trench edgeshall be 400mm.7.1.2 HGU管溝是分段施工,每段廊道施工時在端部位置搭設施工通道,用于施工人員及小型機具、材料的運送。7.1.2 Since the HGU pipeway is constructed section by section, construction passage sha

59、ll be set at the top for construction crew, small equipment&machinery and transportation of materials during the construction of each section.7.1.3 根據側壁高度,外架在頂端和其他相應位置應挑出水平桿用于固定側壁豎筋。7.1.3 According to the height of the side wall, horizontal poles of external scaffold shall be used to fix the side wa

60、ll vertical rebars at the top and other corresponding positions.7.1.4立桿的接長均采用對接扣件,立桿的對接扣件應交錯布置,兩根相鄰立桿的接頭不應設置在同步內。7.1.4Couplers shall be applied to connect upright pipes. Couplers layout of different vertical poles shall be staggered. The couplers of two neighboring upright poles shall not be arrange

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
  • 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
  • 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論