
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、The Lean EnterpriseValue Analysis/ Flow AnalysisLean FoundationsContinuous Improvement TrainingMotionWaiting timeOverproductionProcessing timeDefectsInspectionTransportationProblems/ CausesIncorrect layoutsLack of proximity of machinesOff-line resourcesWaiting workers, machines, materialsLong set-up
2、s and lead timesLarge batches, raw material stocksHigh WIP, finished goods stocksMaking for the sake of itIgnoring customer demandsLong cycle times- process, itselfReduced efficiency- over processingHigh overall lead timesLong delays for rectificationCostly reworkDissatisfied customersApprovals of a
3、pprovalsHigh number of verification stepsReliance- Mass inspection techniquesUnnecessary movementExtra handlingTypes of Waste (7Ws)Value AddedNon- Value Added,but necessaryWasteFocus on reductionPeopleProcessProductThe Causes of Waste in most ProcessesValue AnalysisOverviewMethodology For Reducing M
4、uda (waste)Value-Added Flow Analysis (VA/ FA)A Group of Practices (using rigor and discipline) which evaluates the individual steps or activities in a process to determine if they add value to the outputVA/ FA can be used to improve the process or aid in the creation of a new processDefinitionsValue
5、 AddedAny activity or operation performed that helps transform a product or service from its raw state into its finished form. Completed right the first time.Any activity customer is prepared to pay for. Activity required to ensure that a product or service is delivered in conformance to specificati
6、on. Non-Value AddedAny activity that doesnt help to transform a product or service into its final form. Activity not performed right. Activity customer not willing to pay for.This includes:Unnecessary process stepsMovement of inventory, paperwork, etc.Re-work, corrections, etc.Storage between operat
7、ions, batching inventoryQueue Wait times, delay times, idle times (reference: Time-Value Analysis )VA/ FA StepsStep 1Define and describe process to be analyzedProject charterClearly define goalsCost benefit analysisSignatures Champion, Controller, Belt (minimum)Time Frame for completionVA/ FA StepsS
8、tep 2Map the process and determine major and minor activitiesStart with the customerCustomer receiving department of an output, the next person in line, or the (external) CustomerConduct detail inquiry of what occursUse investigative questionsVA/ FA StepsStep 3Identify value-added activities or proc
9、essesUtilize investigative questionsWhat does it do?Why does it work?What must it do or accomplish?How does it relate to other systems, units, or components?What requires this step to be done?VA/ FA StepsStep 4Calculate the time spent on value-added activities or processes (Value Stream Map)Spread S
10、heet Analysis (VA to NVA ratios)Time-Value AnalysisValue Analysis Investigative Techniques VA/ FA QuestionsDECISION POINTSDoes the decision point represent as appraisal, a review, or an inspection which could be eliminated if prevention were built into the process at an earlier point?Is this a neces
11、sary decision or can the process proceed without a decision here?Is there repetition of decision within the process? VA/ FA QuestionsVALUE ADDEDDoes each activity within the process add value to the output, the product, or service which the customer receives?Is the activity necessary to meet the cus
12、tomers requirements and expectations?Would the customer be willing to pay for that step of the process if the customer knew it existed?VA/ FA QuestionsACTIVITY FLOWDoes the process move frequently back and forth between various units of the organization?Can any of these movements be eliminated?DUPLI
13、CATION OF ACTIVITYAre some of the activities duplicated or repeated?Can any activities be removed from the process while meeting the customers valid requirements for outputs?VA/ FA QuestionsTIME REQUIREDWhat is the time required for each of the steps or activities within the process?Can the time be
14、shortened for any of the steps or activities?Is unnecessary time wasted on transportation, storage, or delays?How much time is used between activities?Can time activities be reduced?VA/ FA QuestionsMATERIALSAre the supplies and materials used in this activity effective?Have new materials been develo
15、ped that would perform the function at less cost?Has there been any price, delivery, or quality problems?TECHNOLOGYWhat is the cutting edge?Is there related technology which could be adapted to improve this process?VA/ FA QuestionsPROCESS USERSWhy are you doing this?What document controls this activ
16、ity?How were you trained?Was the training adequate?How do you know you are performing the activity correctly?Where do you get the inputs you need to perform this activity?What types of errors come to you?Do you have any problems related to this?What makes the job difficult?VA/ FA Best PracticesKEY P
17、OINTSASK the person if they have any suggestions on how to improve to process!Value can be viewed as a relationship of functionality or effectiveness over cost VALUE = Functionality CostVA/ FA Best PracticesKEY POINTSThe VALUE of the output can increase by either reducing costs or by increasing effe
18、ctivenessEVALUATE alternatives based on their impact on both efficiency and effectivenessAchieving a minor increase in functionality at a major cost is not justifiedA major increase in functionality with a minor cost could be acceptableValue EngineeringOverviewVA/ VE = Continuous Cost ImprovementAtt
19、acks the Total Cost of Producing a New ProductAssembly CostsAssembly TimeParts HandlingLevels of AssemblyLabor RateVolumeDesignStandardizationTooling CostsVolumeProcessTooling MaterialDimensions & TolerancesStandardizationPart CostsMaterialFinishingDesignDimensions & TolerancesTooling TypeProcessVol
20、umeStandardizationPackagingOverheadCostsManufacturingCostsPartCosts=AssemblyCosts+ToolingCosts+OverheadApproach for Reducing CostsDesign for Assembly (DFA)A Group of Practices which Minimizes Manufacturing CostsMinimize the Number of PartsAvoid Separate FastenersEstablish Assembly SurfacesEliminate or Simplify AdjustmentsReduce HandlingD
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 工業管道的自動化焊接技術優化
- 工業自動化技術發展與應用研究
- 工業設計與可持續發展戰略
- 工作場所運動和身體健康關系的探究及實踐建議
- 工業節能的技術改造
- 工作效率提升的智能穿戴設備研究
- 工作效率提高的飲食和運動建議
- 工廠企業消防安全實務
- 工程機械設備維修與管理研究
- 工程勘查質量與安全管理手冊
- 金屬表面處理的安全與環保要求
- 新生兒二便的觀察課件
- 四川省普通高中2024屆高三上學期學業水平考試數學試題(解析版)
- 2024年大學試題(教育學)-現代遠程教育概論歷年高頻考點試卷專家薈萃含答案
- 《青少年飲食指導》課件
- 監理抽檢表 - 09涵洞工程
- 客車塞拉門-塞拉門原理
- 初一下冊譯林版期末復習專項復習-一英語單項選擇(50題)含答案
- 國電電力配煤摻燒演示幻燈片
- 卡馬西平初始給藥劑量偏大引起的藥物不良反應――藥學監護病例
- 8.廚房我打理(課件)(共11張PPT) 勞動四年級下冊
評論
0/150
提交評論