




版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、evaluation of scientific development. nature security type-nature security is to maintenance people of health value for target, through strengthening security based management, and risk management, and equipment management and technology supervision, ensure production in the people, and real, and sy
2、stem, and system, elements security reliable, and harmony unified, full control various against factors, achieved thought no slack, and management no empty document, and equipment no hidden, and system no blocked, and unit zero non-stopped. quality and efficiency-quality benefit is to adhere to the
3、enterprise survival, profit and development business truth, adhere to the all activity is economic activity, all costs can be controlled, money should not be wasted management philosophy, management analysis, to improve management quality, improve cost control capacity and market competitiveness. in
4、novation of science and technology-science and technology innovation is to play the role of science and technology as the primary productive force, active use of new technologies, new materials, new processes, new equipment, increase investment in science and technology, strengthening scientific and
5、 technological training, speeding up transforming scientific and technological achievements, forming a number of proprietary technology, enhancing core competitiveness. resource-saving-the-resources saving enterprise was to reduce coal consumption, water consumption, electricity at the core, enhance
6、 the operation of lean management to realize low consumption, high efficiency, reduce production costs. second is to strengthen the business, financial, material, information and the optimization of organization and management, saving the internal transaction costs. harmonious development of harmoni
7、ous development-is to construct a foreign environment for development. xing refers to the internal security firm and internal management of the internal management measures are effective, harmonious. foreign currency means enterprise coordinating development of homeopathy, well, get along with the n
8、eighbors better. (b) xx 2013 five enterprises building intrinsic safety power company goals are: unplanned outage 0 times. class of disorders 0, 0 is equivalent forced outage rate. no personal injury accident, material and equipment accidents do not occur, no fire, no environmental pollution acciden
9、t. enterprise integrated to achieve zero cases of violation, zero accidents, zero. quality goal is: when generating capacity 7.5 billion-kilowatt, sales of over 7.11 billion kwh, total profits of 306.6 million yuan, . bfs+、pi、mis、scm information systems infrastructure, fully integrated information s
10、ystem to realize information resources sharing; to expand the breadth and depth of the portal system, information system of enterprise management assistant role to play; to improve the day-to-day operation and maintenance operation record of promoting causes and transfer system; to strengthen the tr
11、aining長(zhǎng)房白沙灣二期梁板模板支撐架設(shè)計(jì)方案 工程名稱(chēng):長(zhǎng)房白沙灣二期b1、s1棟及部分3#地下室施工單位:湖南馬王堆建筑工程有限公司第一節(jié)、工程概況一、 工程概況工程總體情況序 號(hào)項(xiàng) 目?jī)?nèi) 容1工程名稱(chēng)長(zhǎng)房白沙灣二期b1、s1棟及部分3#地下室 2工程地址長(zhǎng)沙市芙蓉區(qū)白沙灣路北端點(diǎn)處3建設(shè)單位長(zhǎng)沙東方城房地產(chǎn)開(kāi)發(fā)有限公司4設(shè)計(jì)單位湖南方圓建筑工程設(shè)計(jì)有限公司5監(jiān)理單位長(zhǎng)沙市長(zhǎng)安監(jiān)理有限公司6監(jiān)督單位長(zhǎng)沙市建筑工程質(zhì)量監(jiān)察站7施工單位湖南馬王堆建筑工程有限公司2.2建筑設(shè)計(jì)概況 結(jié)構(gòu)類(lèi)型:剪力墻 施工面積:約12000m2 總高度:74.65m 層數(shù):1+23層,地下1層 標(biāo)準(zhǔn)層高:3m二
12、、施工要求1、確保模板支架在使用周期內(nèi)安全、穩(wěn)定、牢靠。2、模板支架在搭設(shè)及拆除過(guò)程中要符合工程施工進(jìn)度要求。操作人員需取得特殊作業(yè)人員資格上崗證。三、技術(shù)保證條件1、安全網(wǎng)絡(luò)2、模板及支架的搭設(shè)和拆除需嚴(yán)格執(zhí)行該專(zhuān)項(xiàng)施工方案。第二節(jié)、編制依據(jù)建筑施工模板安全技術(shù)規(guī)范jgj 162-2008建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范jgj130-2011建筑施工扣件式鋼管模板支架技術(shù)規(guī)程(db33/1035-2006)木結(jié)構(gòu)設(shè)計(jì)規(guī)范gb 50005-2003建筑結(jié)構(gòu)荷載規(guī)范gb50009-2012混凝土結(jié)構(gòu)設(shè)計(jì)規(guī)范gb50010-2010混凝土結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范gb 50204-2002鋼結(jié)構(gòu)
13、工程施工質(zhì)量驗(yàn)收規(guī)范gb 50205-2001建筑工程施工質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)gb 50300-2001施工現(xiàn)場(chǎng)臨時(shí)用電安全技術(shù)規(guī)范jgj 46-2005建筑施工安全檢查標(biāo)準(zhǔn)jgj59-2011建筑施工高處作業(yè)安全技術(shù)規(guī)范jgj8091直縫電焊鋼管gb/t13793低壓流體輸送甲焊接鋼管gb/t3092碳素結(jié)構(gòu)鋼gb/t700鋼管腳手架扣件gb/5831-2006鋼結(jié)構(gòu)設(shè)計(jì)規(guī)范gbj17-88建設(shè)工程施工現(xiàn)場(chǎng)消防安全技術(shù)規(guī)范gb50720-2012危險(xiǎn)性較大的分部分項(xiàng)工程安全管理辦法建質(zhì)200987號(hào)文建設(shè)工程高大模板支撐系統(tǒng)施工安全監(jiān)督管理導(dǎo)則(建質(zhì)2009254號(hào)文)(湘建建2009303號(hào)湖
14、南省重大危險(xiǎn)源安全管理實(shí)施細(xì)則本工程施工圖紙和施工組織設(shè)計(jì)第三節(jié)、施工計(jì)劃材料與設(shè)備計(jì)劃1、鋼材的選用(1) 鋼材應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)碳素結(jié)構(gòu)鋼gb/t 700和低合金高強(qiáng)度結(jié)構(gòu)鋼gb/t 1591的規(guī)定。(2) 鋼管應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)直縫電焊鋼管gb/t 13793或低壓流體輸送用焊接鋼管gb/t 3092中規(guī)定的q235普通鋼管的要求,并應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)碳素結(jié)構(gòu)鋼gb/t 700中q235a級(jí)鋼的規(guī)定。不得使用有嚴(yán)重銹蝕、彎曲、壓扁及裂紋的鋼管。(3) 每根鋼管的最大質(zhì)量不應(yīng)大于25kg,采用482.8以上的鋼管。(4) 新鋼管的尺寸和表面質(zhì)量應(yīng)符合下列規(guī)定:1) 應(yīng)有產(chǎn)品質(zhì)量合格證;2)
15、 應(yīng)有質(zhì)量檢驗(yàn)報(bào)告,鋼管材質(zhì)檢驗(yàn)方法應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)金屬拉伸試驗(yàn)方法gb/t 228的有關(guān)規(guī)定;3) 鋼管表面應(yīng)平直光滑,不應(yīng)有裂縫、結(jié)疤、分層、錯(cuò)位、硬彎、毛刺、壓痕和深的劃道;4) 鋼管外徑、壁厚、斷面等的偏差,應(yīng)符合現(xiàn)行規(guī)范建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范jgj130-2011的規(guī)定;5) 鋼管必須涂有防銹漆。(5) 舊鋼管的檢查在符合新鋼管規(guī)定的同時(shí)還應(yīng)符合下列規(guī)定:1) 表面銹蝕深度應(yīng)符合現(xiàn)行規(guī)范建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范jgj 130-2011的規(guī)定。銹蝕檢查應(yīng)每年一次。檢查時(shí),應(yīng)在銹蝕嚴(yán)重的鋼管中抽取三根,在每根銹蝕嚴(yán)重的部位橫向截?cái)嗳訖z查,當(dāng)銹蝕深度超過(guò)規(guī)定值
16、時(shí)不得使用;2) 鋼管彎曲變形應(yīng)符合現(xiàn)行規(guī)范建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范jgj 130-2011的規(guī)定;序號(hào)項(xiàng)目允許偏差檢查工具1鋼管彎曲a. 各種桿件鋼管的端部彎曲l1.55鋼卷尺b.立桿鋼管彎曲3ml4m4ml6.5m1220c.水平桿、斜桿的鋼管彎曲l6.5302沖壓鋼腳手板a. 板面撓曲l4ml4m1216鋼卷尺b.板面扭曲(任一角翹起)53) 鋼管上嚴(yán)禁打孔。(6) 鋼鑄件應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)一般工程用鑄造碳鋼件gb/t 11352中規(guī)定的zg 200-420、zg 230-450、zg 270-500和zg 310-570號(hào)鋼的要求。(7) 鋼管扣件應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)鋼管腳手
17、架扣件gb 15831的規(guī)定。(8) 扣件的驗(yàn)收應(yīng)符合下列規(guī)定,新扣件應(yīng)有生產(chǎn)許可證、法定檢測(cè)單位的測(cè)試報(bào)告和產(chǎn)品質(zhì)量合格證:1) 舊扣件使用前應(yīng)進(jìn)行質(zhì)量檢查,有裂縫、變形的嚴(yán)禁使用,出現(xiàn)滑絲的螺栓必須更換;2) 新、舊扣件均應(yīng)進(jìn)行防銹處理;3) 支架采用的扣件,在螺栓擰緊扭力矩達(dá)65nm時(shí),不得發(fā)生破壞。(9) 連接用的焊條應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)碳鋼焊條gb/t 5117或低合金鋼焊條gb/t 5118中的規(guī)定。(10) 連接用的普通螺栓應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)六角頭螺栓c級(jí)gb/t 5780和六角頭螺栓gb/t 5782。2、木材的選用(1) 模板結(jié)構(gòu)或構(gòu)件的樹(shù)種應(yīng)根據(jù)各地區(qū)實(shí)際情況選擇質(zhì)量好的材料
18、,不得使用有腐朽、霉變、蟲(chóng)蛀、折裂、枯節(jié)的木材。(2) 模板結(jié)構(gòu)應(yīng)根據(jù)受力種類(lèi)或用途選用相應(yīng)的木材材質(zhì)等級(jí)。木材材質(zhì)標(biāo)準(zhǔn)應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)木結(jié)構(gòu)設(shè)計(jì)規(guī)范gb 50005的規(guī)定。(3) 用于模板體系的原木、方木和板材要符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)木結(jié)構(gòu)設(shè)計(jì)規(guī)范gb50005的規(guī)定,不得利用商品材的等級(jí)標(biāo)準(zhǔn)替代。(4) 主要承重構(gòu)件應(yīng)選用針葉材;重要的木質(zhì)連接件應(yīng)采用細(xì)密、直紋、無(wú)節(jié)和無(wú)其他缺陷的耐腐蝕的硬質(zhì)闊葉材。(5) 當(dāng)采用不常用樹(shù)種作為承重結(jié)構(gòu)或構(gòu)件時(shí),可按現(xiàn)行國(guó)家標(biāo)準(zhǔn)木結(jié)構(gòu)設(shè)計(jì)規(guī)范gb50005的要求進(jìn)行設(shè)計(jì)。對(duì)速生林材,應(yīng)進(jìn)行防腐、防蟲(chóng)處理。(6) 當(dāng)需要對(duì)模板結(jié)構(gòu)或木材的強(qiáng)度進(jìn)行測(cè)試驗(yàn)證時(shí),應(yīng)按
19、現(xiàn)行國(guó)家標(biāo)準(zhǔn)木結(jié)構(gòu)設(shè)計(jì)規(guī)范gb50005的標(biāo)準(zhǔn)進(jìn)行。(7) 施工現(xiàn)場(chǎng)制作的木構(gòu)件,其木材含水率應(yīng)符合下列規(guī)定:1) 制作的原木、方木結(jié)構(gòu),不應(yīng)大于15%;2) 板材和規(guī)格材,不應(yīng)大于20%;3) 受拉構(gòu)件的連接板,不應(yīng)大于18%;4) 連接件,不應(yīng)大于15%。3、竹、木膠合模板板材的選用(1) 膠合模板板材表面應(yīng)平整光滑,具有防水、耐磨、耐酸堿的保護(hù)膜,并應(yīng)有保溫性良好、易脫模和可兩面使用等特點(diǎn)。板材厚度不應(yīng)小于12mm,并應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)混凝土模板用膠合板zbb70006的規(guī)定。(2) 各層板的原材含水率不應(yīng)大于15%,且同一膠合模板各層原材間的含水率差別不應(yīng)大于5%。(3) 膠合模板應(yīng)采
20、用耐水膠,其膠合強(qiáng)度不應(yīng)低于木材或竹材順紋抗剪和橫紋抗拉的強(qiáng)度,并應(yīng)符合環(huán)境保護(hù)的要求。進(jìn)場(chǎng)的膠合模板除應(yīng)具有出廠質(zhì)量合格證外,還應(yīng)保證外觀尺寸合格。第四節(jié)、施工工藝技術(shù)一、技術(shù)參數(shù)梁寬400mm,梁高1400mm,樓板厚度0.18m;模板面板采用普通膠合板。內(nèi)龍骨布置5道,內(nèi)龍骨采用方木50mm70mm; 外龍骨間距500mm,外龍骨采用482.8雙鋼管;對(duì)拉螺栓布置3道,豎向間距300,400,400(mm);斷面跨度方向的間距1000mm。承重架采用1根承重立桿,木方垂直梁截面支設(shè)方式;梁底增加3根承重立桿,承重桿間距理 mm;梁底采用4根50mm70mm的木方;頂托內(nèi)托梁材料選擇鋼管:
21、 482.8mm。梁兩側(cè)立桿間距1.20(mm),立桿上端伸出至模板支撐點(diǎn)的長(zhǎng)度0.0(mm)。板底采用木方支撐形式;木方間距200mm,木方尺寸:50mm70mm。腳手架搭設(shè)高度3.4m;步距1.2m,排距0.9m,縱向間距0.9m。二、工藝流程梁扣件彈梁軸線并復(fù)核 搭支模架調(diào)整托梁擺主梁 安放梁底模并固定 梁底起拱 扎梁筋 安側(cè)模 側(cè)模拉線支撐(梁高加對(duì)拉螺栓) 復(fù)核梁模尺寸、標(biāo)高、位置 與相鄰模板連固。三、施工方法1、在保障安全可靠的前提下,須兼顧施工操作簡(jiǎn)便、統(tǒng)一、經(jīng)濟(jì)、合理等要求,因此梁與板整體支撐體系設(shè)計(jì)的一般原則是:大梁下采用雙排立桿,沒(méi)梁長(zhǎng)600mm間距,并加設(shè)豎向剪刀撐。主次
22、梁位置加設(shè)立桿支撐。立柱步距要一致,便于統(tǒng)一搭設(shè);立柱縱或橫距盡量一致或成倍數(shù),便于立柱縱橫向水平桿件拉通設(shè)置;構(gòu)造要求規(guī)范設(shè)置,保證整體穩(wěn)定性和滿足計(jì)算前提條件。2、柱模板搭設(shè)完畢經(jīng)驗(yàn)收合格后,先澆搗柱砼,然后再綁扎梁板鋼筋,梁板支模架與澆好并有足夠強(qiáng)度的柱和原已做好的主體結(jié)構(gòu)拉結(jié)牢固。經(jīng)有關(guān)部門(mén)對(duì)鋼筋和模板支架驗(yàn)收合格后方可澆搗梁板砼。3、澆筑時(shí)按梁中間向兩端對(duì)稱(chēng)推進(jìn)澆搗,由標(biāo)高低的地方向標(biāo)高高的地方推進(jìn)。事先根據(jù)澆搗砼的時(shí)間間隔和砼供應(yīng)情況設(shè)計(jì)施工縫的留設(shè)位置。搭設(shè)本方案提及的架子開(kāi)始至砼施工完畢具備要求的強(qiáng)度前,該施工層下2層支頂不允許拆除。4、根據(jù)本公司當(dāng)前模板工程工藝水平,結(jié)合設(shè)計(jì)
23、要求和現(xiàn)場(chǎng)條件,決定采用扣件式鋼管架作為本模板工程的支撐體系。5、一般規(guī)定(1) 保證結(jié)構(gòu)和構(gòu)件各部分形狀尺寸,相互位置的正確。 (2) 具有足夠的承載能力,剛度和穩(wěn)定性,能可靠地承受施工中所產(chǎn)生的荷載。(3) 不同支架立柱不得混用。(4) 構(gòu)造簡(jiǎn)單,裝板方便,并便于鋼筋的綁扎、安裝,澆筑混凝土等要求。(5) 多層支撐時(shí),上下二層的支點(diǎn)應(yīng)在同一垂直線上,并應(yīng)設(shè)底座和墊板。(6) 現(xiàn)澆鋼筋混凝土梁、板,當(dāng)跨度大于4m,模板應(yīng)起拱;當(dāng)設(shè)計(jì)無(wú)具體要求時(shí),起拱高度宜為全跨長(zhǎng)度的1/10003/1000。(7)拼裝高度為2m以上的豎向模板,不得站在下層模板上拼裝上層模板。安裝過(guò)程中應(yīng)設(shè)置臨時(shí)固定措施。(
24、8) 當(dāng)支架立柱成一定角度傾斜,或其支架立柱的頂表面傾斜時(shí),應(yīng)采取可靠措施確保支點(diǎn)穩(wěn)定,支撐底腳必須有防滑移的可靠措施。(9) 梁和板的立柱,其縱橫向間距應(yīng)相等或成倍數(shù)。示意圖如下(10) 在立柱底距地面200mm高處,沿縱橫向水平方向應(yīng)按縱下橫上的程序設(shè)掃地桿。可調(diào)支托底部的立柱頂端應(yīng)沿縱橫向設(shè)置一道水平拉桿。掃地桿與頂部水平拉桿之間的距離,在滿足模板設(shè)計(jì)所確定的水平拉桿步距要求條件下,進(jìn)行平均分配確定步距后,在每一步距處縱橫向各設(shè)一道水平拉桿。(11)所有水平拉桿的端部均應(yīng)與四周建筑物頂緊頂牢。無(wú)處可頂時(shí),應(yīng)在水平拉桿端部和中部沿豎向設(shè)置連續(xù)式剪刀撐。(12)鋼管立柱的掃地桿、水平拉桿、剪
25、刀撐應(yīng)采用482.8mm鋼管,用扣件與鋼管立柱扣牢。鋼管掃地桿、水平拉桿應(yīng)采用對(duì)接,剪刀撐應(yīng)采用搭接,搭接長(zhǎng)度不得小于500mm,并應(yīng)采用2個(gè)旋轉(zhuǎn)扣件分別在離桿端不小于100mm處進(jìn)行固定。(13) 支架搭設(shè)按本模板設(shè)計(jì),不得隨意更改;要更改必須得到相關(guān)負(fù)責(zé)人的認(rèn)可。6、立柱及其他桿件(1)扣件式1) 立柱平面布置圖(詳見(jiàn)附圖);2) 搭接要求:本工程所有部位立柱接長(zhǎng)全部采用對(duì)接扣件連接,嚴(yán)禁搭接,接頭位置要求如下:3) 嚴(yán)禁將上段的鋼管立柱與下端鋼管立柱錯(cuò)開(kāi)固定在水平拉桿上。7、水平拉桿(1) 每步縱橫向水平桿必須拉通;(2) 水平桿件接長(zhǎng)應(yīng)采用對(duì)接扣件連接。水平對(duì)接接頭位置要求如下圖: 當(dāng)
26、層高小于8m時(shí),水平拉桿如下圖示意:8、剪刀撐(1)扣件式、門(mén)式9、周邊拉結(jié)1) 豎向結(jié)構(gòu)(柱)與水平結(jié)構(gòu)分開(kāi)澆筑,以便利用其與支撐架體連接,形成可靠整體;2)當(dāng)支架立柱高度超過(guò)5m時(shí),應(yīng)在立柱周全外側(cè)和中間有結(jié)構(gòu)柱的部位,按水平間距69m、豎向間距23m與建筑結(jié)構(gòu)設(shè)置一個(gè)固結(jié)點(diǎn);3) 用抱柱的方式(如連墻件),如下圖,以提高整體穩(wěn)定性和提高抵抗側(cè)向變形的能力。10、后澆帶施工處理方案及模板支撐本工程在地下室底板和地下室結(jié)構(gòu)中設(shè)置寬度為1000mm的后澆帶,在裙房設(shè)置8001000mm的后澆帶。底板處后澆帶模板支撐底板厚度大部分為400mm,后澆帶采用225鋼筋作骨架,在后澆帶設(shè)置鋼網(wǎng)作側(cè)模支
27、護(hù),綁扎在鋼筋骨架上。豎向立筋采用25250.為保證結(jié)構(gòu)施工質(zhì)量,后澆帶鋼筋骨架不得焊于底板鋼筋上。由于后澆帶有一定的側(cè)壓力,模板固定可采用如下圖所示的固定方式,以抵抗混凝土的側(cè)壓力,保證模板位置和幾何尺寸的準(zhǔn)確。四、檢查驗(yàn)收1、不滿足要求的相關(guān)材料一律不得使用,采用問(wèn)責(zé)式制度,總監(jiān),專(zhuān)業(yè)監(jiān)理工程師,項(xiàng)目經(jīng)理,項(xiàng)目技術(shù)負(fù)責(zé)人,施工員進(jìn)行檢查驗(yàn)收,并且簽字。2、施工過(guò)程中加強(qiáng)管理,加大檢查力度,將隱患消滅在初始狀態(tài),避免遺留安全隱患和加固時(shí)人力、物力大量耗費(fèi)。確保一次驗(yàn)收通過(guò)。3、砼結(jié)構(gòu)觀感質(zhì)量符合相關(guān)驗(yàn)收標(biāo)準(zhǔn),少量的缺陷修補(bǔ)完善。4、預(yù)埋件和預(yù)留孔洞的允許偏差如下表:項(xiàng)目允許偏差(mm)預(yù)埋鋼
28、板中心線位置3預(yù)埋管、預(yù)留孔中心線位置3插筋中心線位置5外露長(zhǎng)度+10,0預(yù)埋螺栓中心線位置2外露長(zhǎng)度+10,0預(yù)留孔中心線位置10尺寸+10,05、現(xiàn)澆結(jié)構(gòu)模板安裝的允許偏差及檢查方法如下表:項(xiàng)目允許偏差(mm)檢查方法軸線位置5鋼尺檢查底模上表面標(biāo)高5水準(zhǔn)儀或拉線、鋼尺檢查截面內(nèi)部尺寸基礎(chǔ)10鋼尺檢查柱、墻、梁+4,-5鋼尺檢查層垂直高度不大于5m6經(jīng)緯儀或吊線、鋼尺檢查大于5m8經(jīng)緯儀或吊線、鋼尺檢查相臨兩板表面高低差2鋼尺檢查表面平整度52m靠尺和塞尺檢查6、立柱、縱橫向水平拉桿、剪刀撐等重要桿件的垂直偏差、水平偏差、質(zhì)量等滿足建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范jgj130-2011
29、腳手架搭設(shè)的技術(shù)要求與允許偏差序號(hào)項(xiàng)目一般質(zhì)量要求1構(gòu)架尺寸(立桿縱距、立桿橫距、步距)誤差20mm2立桿的垂直偏差架高25m50mm25m100mm3縱向水平桿的水平偏差20mm4橫向水平桿的水平偏差10mm5節(jié)點(diǎn)處相交桿件的軸線距節(jié)點(diǎn)中心距離150 mm6相鄰立桿接頭位置相互錯(cuò)開(kāi),設(shè)在不同的步距內(nèi),相鄰接頭的高度差應(yīng)500mm7上下相鄰縱向水平桿接頭位置相互錯(cuò)開(kāi),設(shè)在不同的立桿縱距內(nèi),相鄰接頭的水平距離應(yīng)500mm,接頭距立桿應(yīng)小于立桿縱距的1/38桿件搭接1)搭接部位應(yīng)跨過(guò)與其相接的縱向水平桿或立桿,并與其連接(綁扎)固定2)搭接長(zhǎng)度和連接要求應(yīng)符合以下要求:類(lèi)別桿別搭接長(zhǎng)度連接要求扣件
30、式鋼管腳手架立桿1m連接扣件數(shù)量依承載要求確定,且不少于2個(gè)縱向水平桿不少于2個(gè)連接扣件9節(jié)點(diǎn)連接扣件式鋼管腳手架擰緊扣件螺栓,其擰緊力矩應(yīng)不小于40n.m,且不大于65 n.m其它腳手架按相應(yīng)的連接要求7、采用鋼管扣件搭設(shè)高大模板支撐系統(tǒng)時(shí),還應(yīng)對(duì)扣件螺栓的緊固力矩進(jìn)行抽查,抽查數(shù)量應(yīng)符合建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范jgj130-2011的規(guī)定,對(duì)梁底扣件進(jìn)行80%檢查。8、立柱的規(guī)格尺寸和垂直度應(yīng)符合要求,不得出現(xiàn)偏心荷載;第五節(jié)、施工安全保證措施一、組織保障1、安全保證體系2、環(huán)境保護(hù)體系二、技術(shù)措施模板支架搭設(shè)技術(shù)措施1、鋼管架應(yīng)設(shè)置避雷針,分置于主樓外架四角立桿之上,并聯(lián)通大
31、橫桿,形成避雷網(wǎng)絡(luò),并檢測(cè)接地電阻不大于30。2、外腳手架不得搭設(shè)在距離外架空線路的安全距離內(nèi),并做好可靠的安全接地處理。3、定期檢查腳手架,發(fā)現(xiàn)問(wèn)題和隱患,在施工作業(yè)前及時(shí)維修加固,以達(dá)到堅(jiān)固穩(wěn)定,確保施工安全。4、外腳手架?chē)?yán)禁鋼竹、鋼木混搭,禁止扣件、繩索、鐵絲、竹篾、塑料篾混用。5、外腳手架搭設(shè)人員必須持證上崗,并正確使用安全帽、安全帶、穿防滑鞋。6、嚴(yán)禁腳手板存在探頭板,鋪設(shè)腳手板以及多層作業(yè)時(shí),應(yīng)盡量使施工荷載內(nèi)、外傳遞平衡。7、保證腳手架體的整體性,不得與井架、升降機(jī)一并拉結(jié),不得截?cái)嗉荏w。8、結(jié)構(gòu)外腳手架每支搭一層,支搭完畢后,經(jīng)項(xiàng)目部安全員驗(yàn)收合格后方可使用。任何班組長(zhǎng)和個(gè)人,
32、未經(jīng)同意不得任意拆除腳手架部件。9、嚴(yán)格控制施工荷載,腳手板不得集中堆料施荷,施工荷載不得大于3kn/m2,確保較大安全儲(chǔ)備。10、結(jié)構(gòu)施工時(shí)不允許多層同時(shí)作業(yè),裝修施工時(shí)同時(shí)作業(yè)層數(shù)不超過(guò)兩層,臨時(shí)性用的懸挑架的同時(shí)作業(yè)層數(shù)不超過(guò)兩層。11、當(dāng)作業(yè)層高出其下連墻件3.6m以上、且其上尚無(wú)連墻件時(shí),應(yīng)采取適當(dāng)?shù)呐R時(shí)撐拉措施。12、各作業(yè)層之間設(shè)置可靠的防護(hù)柵欄,防止墜落物體傷人。模板支架拆除技術(shù)措施1、拆架前:(1) 應(yīng)全面檢查腳手架的扣件連接、連墻件、支撐體系等是否符合構(gòu)造要求;(2) 應(yīng)根據(jù)檢查結(jié)果補(bǔ)充完善施工組織設(shè)計(jì)中的拆除順序和措施,經(jīng)主管部門(mén)批準(zhǔn)后方可實(shí)施;(3) 應(yīng)由單位工程負(fù)責(zé)人
33、進(jìn)行拆除安全技術(shù)交底;(4) 應(yīng)清除腳手架上雜物及地面障礙物。2、拆架時(shí)應(yīng)劃分作業(yè)區(qū),周?chē)O(shè)繩綁圍欄或豎立警戒標(biāo)志,地面應(yīng)設(shè)專(zhuān)人指揮,禁止非作業(yè)人員進(jìn)入。當(dāng)腳手架采取分段、分立面拆除時(shí),對(duì)不拆除的腳手架兩端,應(yīng)先按建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范第7.4.3條、第6.4.4條、第6.6.4條、第6.6.5條設(shè)置連墻件和橫向斜撐加固。3、拆架的高處作業(yè)人員應(yīng)戴安全帽、系安全帶、扎裹腿、穿軟底防滑鞋。4、拆架程序應(yīng)遵守“由上而下,先搭后拆”的原則,即先拆拉桿、腳手板、剪刀撐、斜撐,而后拆小橫桿、大橫桿、立桿等,并按“一步一清”原則依次進(jìn)行。嚴(yán)禁上下同時(shí)進(jìn)行拆架作業(yè)。5、拆立桿時(shí),要先抱住立桿再
34、拆開(kāi)最后兩個(gè)扣件,拆除大橫桿、斜撐、剪刀撐時(shí),應(yīng)先拆除中間扣件,然后托住中間,再解端頭扣件。6、連墻件必須隨腳手架逐層拆除,嚴(yán)禁先將連墻件整層或數(shù)層拆除后再拆腳手架;分段拆除高差不應(yīng)大于2步,如高差大于2步,應(yīng)增設(shè)連墻件加固;當(dāng)腳手架拆至下部最后一根長(zhǎng)立桿的高度(約6.5m)時(shí),應(yīng)先在適當(dāng)位置搭設(shè)臨時(shí)拋撐加固后,再拆除連墻件。7、拆除時(shí)要統(tǒng)一指揮,上下呼應(yīng),動(dòng)作協(xié)調(diào),當(dāng)解開(kāi)與另一人有關(guān)的結(jié)扣時(shí),應(yīng)先通知對(duì)方,以防墜落。8、拆架時(shí)嚴(yán)禁碰撞腳手架附近電源線,以防觸電事故。9、在拆架時(shí),不得中途換人,如必須換人時(shí),應(yīng)將拆除情況交代清楚后方可離開(kāi)。10、拆下的材料要徐徐下運(yùn),嚴(yán)禁拋擲。運(yùn)至地面的材料應(yīng)
35、按指定地點(diǎn)隨拆隨運(yùn),分類(lèi)堆放,“當(dāng)天拆當(dāng)天清”,拆下的扣件和鐵絲要集中回收處理。11、高層建筑腳手架拆除,應(yīng)配備良好的通訊裝置。12、輸送至地面的桿件,應(yīng)及時(shí)按類(lèi)堆放,整理保養(yǎng)。13、當(dāng)天離崗時(shí),應(yīng)及時(shí)加固尚未拆除部分,防止存留隱患造成復(fù)崗后的人為事故。14、如遇強(qiáng)風(fēng)、大雨、雪等特殊氣候,不應(yīng)進(jìn)行腳手架的拆除,嚴(yán)禁夜間拆除。15、翻掀墊鋪竹笆應(yīng)注意站立位置,并應(yīng)自外向里翻起豎立,防止外翻將竹笆內(nèi)未清除的殘留物從高處墜落傷人。三、監(jiān)測(cè)監(jiān)控1、安全管理(1) 搭設(shè)人員必須是經(jīng)過(guò)按現(xiàn)行國(guó)家標(biāo)準(zhǔn)特種作業(yè)人員安全技術(shù)考核管理規(guī)則gb5036考核合格的專(zhuān)業(yè)架子工。上崗人員定期體檢,合格者方可持證上崗;(2
36、) 搭設(shè)人員必須戴安全帽、系安全帶,穿防滑鞋;(3) 腳手架的構(gòu)配件質(zhì)量與搭設(shè)質(zhì)量,應(yīng)按安全技術(shù)規(guī)范規(guī)定進(jìn)行檢查驗(yàn)收,合格后方準(zhǔn)許使用;(4) 作業(yè)層上的施工荷載應(yīng)符合設(shè)計(jì)要求,不得超載。不得將模板支架、攬風(fēng)繩、泵送混凝土和砂漿的輸送管等固定在腳手架上,嚴(yán)禁懸掛起重設(shè)備;(5) 當(dāng)有六級(jí)以及六級(jí)以上大風(fēng)和霧、雨、雪天氣,應(yīng)停止腳手架的搭設(shè)與拆除作業(yè)。雪后架上作業(yè)應(yīng)有防滑措施,并掃除積雪;(6) 腳手架的安全檢查與維護(hù),應(yīng)按安全技術(shù)規(guī)范進(jìn)行。安全網(wǎng)應(yīng)按規(guī)定搭設(shè)和拆除;(7) 在腳手架使用期間,嚴(yán)禁拆除主節(jié)點(diǎn)處縱、橫水平桿、連墻件、交叉支撐、水平架、加固欄桿和欄桿;(8) 不得在腳手架基礎(chǔ)及鄰近處
37、進(jìn)行挖掘作業(yè),否則應(yīng)采取安全措施,并報(bào)主管部門(mén)批準(zhǔn);(9) 臨街搭設(shè)腳手架時(shí),外側(cè)應(yīng)有防止墜物傷人的防護(hù)措施;(10) 在腳手架上進(jìn)行電、氣焊作業(yè)時(shí),必須有防火措施和專(zhuān)人看守;(11) 工地臨時(shí)用電線路的架設(shè)及腳手架接地、避雷措施等。應(yīng)按現(xiàn)行行業(yè)標(biāo)準(zhǔn)施工現(xiàn)場(chǎng)臨時(shí)用電安全技術(shù)規(guī)范jgj 46-2005的有關(guān)規(guī)定執(zhí)行;(12) 搭拆腳手架時(shí),地面應(yīng)設(shè)圍欄和警戒標(biāo)志,并派專(zhuān)人看守,嚴(yán)禁非操作人員入內(nèi)。2、日常維護(hù)管理要求(1) 使用完畢的腳手架架料和構(gòu)件、零件要及時(shí)回收、分類(lèi)整理,分類(lèi)存放。堆放地點(diǎn)要場(chǎng)地平坦,排水良好,下設(shè)支墊,鋼管、角鋼、鋼桁架和其他鋼構(gòu)件最好放在室內(nèi),如果放在露天,應(yīng)用氈、席加
38、蓋、扣件、螺栓及其他小零件,應(yīng)用木箱。鋼筋籠或麻袋、草包等容器分類(lèi)貯存,放在室內(nèi);(2) 彎曲的鋼管桿件要調(diào)直,損壞的構(gòu)件要修復(fù),損壞的扣件、零件要更換;(3) 做好鋼鐵件的防銹和木制件的防腐處理,鋼管外壁在濕度較大地區(qū)(相對(duì)濕度大于75%),應(yīng)每年涂刷防銹漆一次;其他地區(qū)可兩年涂刷一次。涂刷時(shí)涂層不宜過(guò)厚。經(jīng)徹底除銹后,涂一度紅丹即可。鋼管內(nèi)壁可根據(jù)地區(qū)情況,每24年涂刷一次,每次涂刷兩遍。角鋼、桁架和其他鐵件可每年涂刷一次。扣件要涂油,螺栓宜鍍鋅防銹,使用35年保護(hù)層剝落后再次鍍鋅。沒(méi)有鍍鋅條件的,應(yīng)在每次使用后用煤油洗滌并涂機(jī)油防銹。木制件應(yīng)做好防腐處理,鋼制件應(yīng)涂紅丹及防銹涂料;(4)
39、 搬運(yùn)長(zhǎng)鋼管、長(zhǎng)角鋼時(shí),應(yīng)采取措施防止彎曲。拆架應(yīng)拆成單片裝運(yùn),裝卸時(shí)不得拋丟,防止損壞;(5) 腳手架使用的扣件、螺栓、螺母、墊板、連接棒、插銷(xiāo)等小配件極易丟失。在安裝腳手架時(shí),多余的小配件應(yīng)及時(shí)收回存放,在拆卸腳手架時(shí),散落在地面上的小配件要及時(shí)收撿起來(lái);(6) 健全制度,加強(qiáng)管理,減少損耗和提高效益是腳手架管理的中心環(huán)節(jié)。比較普遍采用的管理辦法有兩種1) 由架子工班(組)管理,采用誰(shuí)使用、誰(shuí)維護(hù)、誰(shuí)管理的原則,并建立積極地獎(jiǎng)罰制度、做到確保施工需要,用畢及時(shí)歸庫(kù)、及時(shí)清理和及時(shí)維修保養(yǎng),減少丟失和損耗;2) 由材料部門(mén)集中管理,實(shí)行租賃制。施工隊(duì)根據(jù)施工的需要向公司材料部門(mén)租賃腳手架材料
40、,實(shí)行按天計(jì)費(fèi)和損壞賠償制度。四、應(yīng)急預(yù)案1、目的提高整個(gè)項(xiàng)目組對(duì)事故的整體應(yīng)急能力,確保意外發(fā)生的時(shí)候能有序的應(yīng)急指揮,為有效、及時(shí)的搶救傷員,防止事故的擴(kuò)大,減少經(jīng)濟(jì)損失,保護(hù)生態(tài)環(huán)境和資源,把事故降低到最小程度,制定本預(yù)案。2、應(yīng)急領(lǐng)導(dǎo)小組及其職責(zé)應(yīng)急領(lǐng)導(dǎo)小組由組長(zhǎng)、副組長(zhǎng)、成員等構(gòu)成。(1) 領(lǐng)導(dǎo)各單位應(yīng)急小組的培訓(xùn)和演習(xí)工作,提高應(yīng)變能力。(2) 當(dāng)發(fā)生突發(fā)事故時(shí),負(fù)責(zé)救險(xiǎn)的人員、器材、車(chē)輛、通信和組織指揮協(xié)調(diào)。(3) 負(fù)責(zé)準(zhǔn)備所需要的應(yīng)急物資和應(yīng)急設(shè)備。(4) 及時(shí)到達(dá)現(xiàn)場(chǎng)進(jìn)行指揮,控制事故的擴(kuò)大,并迅速向上級(jí)報(bào)告。3、應(yīng)急反應(yīng)預(yù)案(1) 事故報(bào)告程序事故發(fā)生后,作業(yè)人員、班組長(zhǎng)、
41、現(xiàn)場(chǎng)負(fù)責(zé)人、項(xiàng)目部安全主管領(lǐng)導(dǎo)應(yīng)逐級(jí)上報(bào),并聯(lián)絡(luò)報(bào)警,組織搶救。(2) 事故報(bào)告事故發(fā)生后應(yīng)逐級(jí)上報(bào):一般為現(xiàn)場(chǎng)事故知情人員、作業(yè)隊(duì)、班組安全員、施工單位專(zhuān)職安全員。發(fā)生重大事故時(shí),應(yīng)立即向上級(jí)領(lǐng)導(dǎo)匯報(bào),并在24小時(shí)內(nèi)向上級(jí)主管部門(mén)作出書(shū)面報(bào)告。(3) 現(xiàn)場(chǎng)事故應(yīng)急處理施工過(guò)程中可能發(fā)生的事故主要有:機(jī)具傷人、火災(zāi)事故、雷擊觸電事故、高溫中暑、中毒窒息、高空墜落、落物傷人等事故。(a) 火災(zāi)事故應(yīng)急處理:及時(shí)報(bào)警,組織撲救,集中力量控制火勢(shì)。消滅飛火疏散物資減少損失控制火勢(shì)蔓延。注意人身安全,積極搶救被困人員,配合消防人員撲滅大火。(b) 觸電事故處理:立即切斷電源或者用干燥的木棒、竹竿等絕緣
42、工具把電線挑開(kāi)。傷員被救后,觀察其呼吸、心跳情況,必要時(shí),可采取人工呼吸、心臟擠壓術(shù),并且注意其他損傷的處理。局部電擊時(shí),應(yīng)對(duì)傷員進(jìn)行早期清創(chuàng)處理,創(chuàng)面宜暴露,不宜包扎,發(fā)生內(nèi)部組織壞死時(shí),必須注射破傷風(fēng)抗菌素。(c) 高溫中暑的應(yīng)急處理:將中暑人員移至陰涼的地方,解開(kāi)衣服讓其平臥,頭部不要墊高。用涼水或50%酒精擦其全身,直至皮膚發(fā)紅,血管擴(kuò)張以促進(jìn)散熱,降溫過(guò)程中要密切觀察。及時(shí)補(bǔ)充水分和無(wú)機(jī)鹽,及時(shí)處理呼吸、循環(huán)衰竭,醫(yī)療條件不完善時(shí),及時(shí)送醫(yī)院治療。(d) 其他人身傷害事故處理:當(dāng)發(fā)生如高空墜落、被高空墜物擊中、中毒窒息和機(jī)具傷人等人身傷害時(shí),應(yīng)立即向項(xiàng)目部報(bào)告、排除其他隱患,防止救援
43、人員受到傷害,積極對(duì)傷員進(jìn)行搶救。4、應(yīng)急通信聯(lián)絡(luò)項(xiàng)目負(fù)責(zé)人:舒靖弘 手機(jī)全員:吳磊 手機(jī)院救護(hù)中心:120 匪警:110 火警:119通信聯(lián)系方式應(yīng)在施工現(xiàn)場(chǎng)和營(yíng)地的顯要位置張貼,以便緊急情況下使用。第六節(jié)、勞動(dòng)力計(jì)劃一、專(zhuān)職安全生產(chǎn)管理人員搭設(shè)過(guò)程中,因處在施工高峰期,各施工班組在交叉作業(yè)中,故應(yīng)加強(qiáng)安全監(jiān)控力度,現(xiàn)場(chǎng)設(shè)定若干名安全監(jiān)控員。水平和垂直材料運(yùn)輸必須設(shè)置臨時(shí)警戒區(qū)域,用紅白三角小旗圍欄。謹(jǐn)防非施工人員進(jìn)入。同時(shí)成立以項(xiàng)目經(jīng)理為組長(zhǎng)的安全領(lǐng)導(dǎo)小組以加強(qiáng)現(xiàn)場(chǎng)安全防護(hù)工作,本小組機(jī)構(gòu)組成、人員編制及責(zé)任分工如下 舒靖弘(項(xiàng)目經(jīng)理)組
44、長(zhǎng),負(fù)責(zé)協(xié)調(diào)指揮工作;張 毅(施工員)組員,負(fù)責(zé)現(xiàn)場(chǎng)施工指揮,技術(shù)交底;吳 磊(安全員)組員,負(fù)責(zé)現(xiàn)場(chǎng)安全檢查工作;李建明(架子工班長(zhǎng))組員,負(fù)責(zé)現(xiàn)場(chǎng)具體施工;二、特種作業(yè)人員高支模開(kāi)始時(shí)間2009.7.20高支模工期(天)25作息時(shí)間(上午)6:0010:30作息時(shí)間(下午)15:0019:30砼工程量(m3)480高支模建筑面積(m2)480木工(人)65鋼筋工(人)40砼工(人)30架子工(人)25水電工(人)5其它工種(人)7第七節(jié)、計(jì)算書(shū)及相關(guān)圖紙計(jì)算見(jiàn)附圖施工詳圖: 圖1 支架立面圖 圖2 梁截面放大圖supervision in large and medium goods ve
45、hicle. a is established large vehicles and small vehicles classification management of motor vehicle test mode, increased medium van car, and dangerous goods transport car, and school car test project; ii is established motor vehicle test regulatory platform, achieved motor vehicle test full process
46、 video, and data remote regulatory; three is strictly motor vehicle identification management, equipped with unified of identification equipment and tool, using mobile identification terminal, and law enforcement records instrument, technology identification means. as to 20xx years june 20 statewide
47、 motor vehicle keep volume for 567,408 car, and last year earlier than growth 75,814 car, growth 13.36%; this year january-june, vehicles management section and license archives management section total accepted the motor vehicle registration business 42,543 car times, which registered registration
48、6,905 car times, and transfer registration 3,592 car times, and change registration 1033 car times, and mortgage registration 696 car times, and cancellation registration 187 car times, and into business 980 car times, and archives corrections 81 pieces times, and issued test qualified logo 25,429 car times, and other vehicles business 3,640 car times; supervision survey section relies on motor vehicle detection remote issued test qualified logo software platform supervision motor vehicle test, and identification situation 7418l liang
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 中國(guó)短視頻應(yīng)用項(xiàng)目創(chuàng)業(yè)計(jì)劃書(shū)
- 樂(lè)理二級(jí)試題及答案
- 窯爐運(yùn)行指南
- 液氮冷卻系統(tǒng)能耗優(yōu)化-洞察闡釋
- 2025汽車(chē)銷(xiāo)售合同示范文本
- 商務(wù)樓場(chǎng)地租用與商務(wù)配套服務(wù)管理協(xié)議
- 創(chuàng)新型企業(yè)典當(dāng)金融服務(wù)合同模板
- 彩票店資產(chǎn)轉(zhuǎn)讓與品牌運(yùn)營(yíng)管理合同
- 2025年智能手表購(gòu)買(mǎi)合同
- 2025授權(quán)協(xié)議樣書(shū)模板
- 齒輪螺栓墊片沖壓模具畢業(yè)設(shè)計(jì)說(shuō)明書(shū)
- GB/T 19668.7-2022信息技術(shù)服務(wù)監(jiān)理第7部分:監(jiān)理工作量度量要求
- GB/T 9115-2010對(duì)焊鋼制管法蘭
- GB/T 5478-2008塑料滾動(dòng)磨損試驗(yàn)方法
- GB/T 1095-2003平鍵鍵槽的剖面尺寸
- 農(nóng)民工安全考試試卷試題
- 現(xiàn)代藝術(shù)野獸派-中外美術(shù)史-課件
- 雙曲線齒輪幾何設(shè)計(jì)
- 大型養(yǎng)路機(jī)械綜合講義
- 高分子材料完整版課件
- GB∕T 37456-2019 海洋平臺(tái)電驅(qū)動(dòng)齒輪齒條升降裝置
評(píng)論
0/150
提交評(píng)論