1、斯里蘭卡蓮花電視塔機(jī)電安裝工程施工方案 電氣水系統(tǒng)施工措施第5節(jié) 電氣系統(tǒng)工程 5. Electric System Project1. 電氣系統(tǒng)安裝工藝流程 Installation process2. 鋼管敷設(shè) Pipe Laying1) 電線管路明敷設(shè)時(shí),固定點(diǎn)間距應(yīng)均勻,固定點(diǎn)設(shè)置見下圖: When adopted surface conduit,the distance between fixed points shall be uniform.The fixed points position as follows:2) 鋼管路沿墻明敷設(shè)需進(jìn)入接線盒時(shí),其固定管卡應(yīng)采用離墻碼,以保

2、證管路進(jìn)入接線盒平直,如下圖所示:When the wall-following pipe adopted surface conduit to connect with junction box,the clamp shall use 離墻碼 to ensure the pipe horizontal and vertical. 3) 鋼管路沿墻明敷設(shè)需進(jìn)入配電箱時(shí),應(yīng)一孔一管,管道應(yīng)從配電箱預(yù)留敲落孔進(jìn)入,配管需要煨制燈叉彎或安裝支架。不少于兩根管路與配電箱連接時(shí),應(yīng)排列整齊,間距均勻。如下圖所示W(wǎng)hen the wall-following pipe adopted surface co

3、nduit to connect with junction box,it must follow the rule”one hole ,one pipe”.The pipe shall go through the reserved hole to junction box while tubing laying need installing support.When there are more than 2 pipes connected with junction box,those pipes shall be neat and uniform spacing as follows

4、: 4) 鋼管連接及接地的各種不同方式見下圖: Pipe connecting and grounding in different ways as follows :3. 橋架安裝Cable Tray Installationa) 槽式水平橋架與支架的橫擔(dān)必須用半圓頭的螺栓固定,半圓頭向內(nèi),以防止螺栓劃傷電纜外護(hù)層。 Adopting cross-arm cup head bolt to fix support cross-arm on channel tray ,the cup-head side shall be inward in case the bolt will scratch

5、the cable sheath .c) 電纜橋架沿墻垂直安裝時(shí),應(yīng)確保橋架固定牢靠,梯架的固定應(yīng)采用專用壓板。如下圖。When install cable tray along wall vertically, make sure that cable tray fixed firmly.Adopting specialized plate pinch to fix cable ladder. d)槽式電纜橋架沿墻安裝時(shí),其固定方式應(yīng)采用支架或半圓頭內(nèi)膨脹螺栓,固定螺栓的螺桿嚴(yán)禁伸進(jìn)橋架內(nèi),如下圖:When install channel tray along the wall, adopt

6、ing support or cup-head expansion bolt to fix. It is forbidden to The screw is strictly forbidden into the cable tray.As follows:e)水平安裝電纜橋架應(yīng)在結(jié)構(gòu)主梁上安裝固定支架,在主梁之間平均分配間隔距離安裝吊架,支吊架間隔距離應(yīng)符合1.53m的要求。如下圖: When install cable tray horizontally ,erect fixed support on main beam.The main beam is divided into unif

7、orm spacing on which install the suspended frame.The distance between fixed support and suspended frame shall be 1.53m. As follows:f)非鍍鋅(噴塑、防火)鋼制電纜橋架連接時(shí),應(yīng)在連接板處安裝跨接地線,跨接地線安裝應(yīng)注意安裝爪型墊圈,以保證接地的電氣通路。如下圖所示:When install non-galvanized(plastic spray,fireproofing)steel cable tray,laying the ground wire at jun

8、ction plate,claw washer shall be installed with ground wire to make sure system running normally.h)橋架在穿防火分區(qū)時(shí),對(duì)橋架與建筑物之間的縫隙做防火處理,防火材料須能防火3小時(shí)以上,具體的做法見下圖。When cable tray across the fire compartment,make the fire prevention between cable tray and buildings.The materials shall be fire-proof more than 3 ho

9、urs.Details as follows:4. 插接母線安裝Socket Busbar Installation 封閉插接母線安裝工藝 Process安裝示意圖Installation Diagram母線水平段安裝圖Horizontal Installation Diagram母線垂直段安Vertical Installation Diagram封閉母線安裝工藝Enclosed Busbar Installing Process封閉母線水平安裝圖Horizontal Installation Diagram符號(hào)說明:Symbol Description:1-吊桿 Suspender2-封閉

10、母線 Enclosed Busbar3-固定夾板 Fixed Clamp 4-熱鍍鋅角鋼Galvanized Angle Steel 5-12 鍍鋅螺栓 Galvanized Bolt封閉母線垂直安裝圖符號(hào)說明:Symbol Description 1-封閉母線 Enclosed Busbar2-母線固定支架 Fixed Support 3-熱鍍鋅槽鋼 Hot Galvanized Channel Steel4-12 膨脹螺栓 Expansion Bolt5-結(jié)構(gòu)樓板 Structure Floor Slab6-防火封堵材料 Fire-proo

11、fing Sealing Material7-防水臺(tái) Waterproofing Platform5. 配電相(柜)安裝Installation of Distribution Cabinet配電箱安裝流Process安裝示意圖Installation Diagram配電箱安裝示意圖Cabinet Installation Diagram配電箱接管示意圖Pipe Installation Diagram配電箱安裝工藝Installation Process of Distribution Cabinet配電箱在混凝土墻上明裝Surface mounted On the Wall符號(hào)說明:Sym

12、bol Description1-支架 Support2-鋼管 Steel Pipe3-配電箱 Distribution Cabinet4-接地線 Ground Wire5-膨脹螺栓 Expansion Bolt6-墻體 Wall配電箱進(jìn)出口安裝示意圖Outlet and Inlet Installation Diagram符號(hào)說明:Symbol Description 1-鋼管Steel Pipe2-水泥砂漿填實(shí)Cement Mortar Filling3-配電箱 Distribution Cabinet4-混凝土墻體Concrete Wall6. 電纜敷設(shè)Cable Laying電纜敷設(shè)流

13、程Cable Laying Process安裝示意圖Installation Diagram豎向電纜敷設(shè) Vertical Cable Laying橫向電纜敷設(shè)Horizontal Cable Laying電纜安裝工藝Cable Installation Process卷揚(yáng)機(jī)敷設(shè)電纜示意圖1Diagram of Cable Laying by Hoist 符號(hào)說明:Symbol Description1-鋼絲繩 Wire Rope 2-膨脹螺栓Expansion Bolt3-槽鋼Channel Steel4-固定卷揚(yáng)機(jī)用鋼絲繩 Hoist Wire Rope5-卷揚(yáng)機(jī) Hoist6-鋼絲繩Wi

14、re Rope7-滑輪Sheave8-導(dǎo)向滑輪Leading Sheave9-電纜夾具Cable Clamp 10-電纜 Cable卷揚(yáng)機(jī)敷設(shè)電纜示意圖2Diagram of Cable Laying by Hoist符號(hào)說明:Symbol Description1-鋼絲繩 Wire rope2-膨脹螺栓 Expansion Bolt3-槽鋼 Channel Steel4-固定卷揚(yáng)機(jī)用鋼絲繩 Hoist Wire Rope5-卷揚(yáng)機(jī) Hoist6-鋼絲繩 Wire Rope7-滑輪Sheave8-導(dǎo)向滑輪Leading Sheave9-電纜放線架Cable Pay-out Stand 10-電

15、纜盤Cable Reel11-電纜Cable12-電纜滑輪Cable Sheave13-電纜夾具Cable Clamp7礦物絕緣電纜敷設(shè)Mineral-insulated Cable Laying7.1電纜敷設(shè)Cable Laying敷設(shè)時(shí)應(yīng)在專用的電纜放線架上進(jìn)行,拆除包裝時(shí)必須注意成品保護(hù),以免損傷銅護(hù)套,在處理中間接頭、終端頭時(shí)應(yīng)留有余量。在穿橋架的轉(zhuǎn)角、分支等處,要按照事先排布好的順序平滑均勻地過渡,避免交叉和重疊。Cable laying shall proceed on the pay-out stand.In order to avoid damage the copper sh

16、eath,be cautious when remove its packing.It is better to reserve spare intermediate joints,and terminal joints.According to arranged orders,make the cable smoothly and evenly across corner, branch of cable tray avoiding crossing and overlapping. 在同一橋架內(nèi),同一回路不同相序的電纜應(yīng)同時(shí)敷設(shè),敷設(shè)完后應(yīng)及時(shí)將橋架蓋板蓋好以作保護(hù),防止在其他專業(yè)施工過程

17、中電纜被工具、建材碰撞或被焊接火花等擊傷、燒傷從而造成電纜外護(hù)套的損壞。In a cable tray, the cable which sequence of the same circuit are different should be laid at the same time. After cable installation ,lay cable tray cover on it in case the damage from other construction process,such as collision by tools and materials ,spark fro

18、m welding which may destroy cable sheath.7.2電纜排列Cable Layout單芯電纜排列方式Single Core Cable Layout單排電纜Single Row Cable兩路平行電纜Parallel Cable7.3電纜的調(diào)整 The Adjustment of Cable Laying 在橋架T形彎、L型彎、穿越墻洞、電氣豎井、進(jìn)出配電柜箱等彎曲度大、空間狹小處敷設(shè)時(shí)要注意敷設(shè)時(shí)應(yīng)用力均衡,在處理彎曲處時(shí),要使用廠家配備專用的彎曲工具,按照安裝說明的彎曲方法和力度進(jìn)行冷彎,切不可使用普通工具或人工強(qiáng)行彎曲,以免在操作中損傷電纜銅護(hù)套。 W

19、hen the cable goes through T-shape bend ,L-shape bend,wall opening,shaft,inlet and outlet of distribution cabinet and those narrow and large bending place,maintain an even strength to pull the cable. Using the bend tool provided by manufacture and following the methods on instructions to cold bend t

20、he cable.In order to avoiding cable sheath damage,do not use common tools or manual power to bend the cable. 7.4電纜膨脹節(jié)設(shè)置 Cable Expansion Joint Setting避免溫度變化對(duì)電纜產(chǎn)生永久的損傷,在電纜直線敷設(shè)超過70m時(shí)應(yīng)在允許的場(chǎng)合設(shè)置膨脹環(huán),通常采用S型膨脹環(huán)。 To avoid the temperature changing make a permanent damage to cable,after laying cable more than 7

21、0 meters,install a cable expansion joint at a suitable place .“S”型膨脹環(huán)S-shape Expansion Joint“”型膨脹環(huán)-Shape Expansion Joint7.5電纜進(jìn)箱柜的安裝 The cable installation at Cabinet Inlet and Outlet 電纜進(jìn)配電箱、柜敷設(shè)時(shí),當(dāng)采用黃銅板或銅、鋁母線作電纜固定支架時(shí),可不采用接地銅片,但黃銅板或銅、鋁母線支架應(yīng)有可靠的接地。當(dāng)采用鋼支架作電纜固定支架時(shí),則應(yīng)采用接地銅片。見下圖:When laying the cable throu

22、gh distribution cabinet, using brass plate and brass busbar as fixed support which dont need install grounding copper.But brass plate ,brass busbar shall be grounding reliably.When using steel support as cable fixed support, then need install grounding copper.As follows:礦物絕緣電纜從封閉的配電柜頂或底進(jìn)Mineral-insu

23、lated cable through cabinet top or bottom 礦物絕緣電纜從配電柜(箱)上進(jìn)線或側(cè)進(jìn)線Mineral-insulated cable through cabinet byupper wiring pattern or side inlet礦物絕緣電纜從配電柜(箱)下進(jìn)線Mineral-insulated cable through cabinet by lower wiring pattern1-礦物絕緣電纜(單芯)Mineral-insulated cable(single core)2-填料函 Stuffing box3-配電柜或箱殼體;Distrib

24、ution Cabinet or Tank Enclosure4-封端;Sealing End 5-導(dǎo)線絕緣套管;Wiring Loom6-電纜芯線;Cable core7-黃銅板 Brass Plate(2-4mm);8-鍍鋅螺栓、螺母、墊圈;Galvanized bolts, nuts, washers9-電纜固定及接地支架;Cable fix and ground support10-配電柜內(nèi)的固定支架;Fixed support inside cabinet11-礦物絕緣電纜(多芯);Mineral insulated cable (Multicore)12-接地銅片 The grou

25、nding copper8燈具安裝Lamp Installation燈具安裝工藝流程Lamp Installation Process安裝示意圖Installation Diagram燈具檢查燈具組裝燈具安裝通電試運(yùn)行符號(hào)說明:Symbol Description1-吊頂龍骨 Ceiling joist2-接線盒 Junction box3-電線管 Wiring tube4-熒光燈 fluorescent lamp5-吊桿 Suspender6-單邊管卡Unilateral pipe clamp嵌入式熒光燈安裝圖Embedded fluorescent lamp installati

26、on符號(hào)說明:Symbol Description1- 內(nèi)脹栓 Inner expansion bolt2- 2-接線盒Junction box3- 3-吊桿suspender4- 4-金屬軟管 Metal hose5- 5-筒燈Down lamp6- 6-吊頂龍骨 Ceiling joist7- 7-樓板 Floor slab筒燈嵌入式安裝圖工藝流程:Process 檢查燈具組裝燈具燈具絕緣檢查燈具安裝 材料要求: Materials Requirement:燈具的型號(hào)、規(guī)格必須符合設(shè)計(jì)要求和國(guó)家標(biāo)準(zhǔn)的規(guī)定。燈內(nèi)配線嚴(yán)禁外露,燈具配件齊全,無機(jī)械損傷、變形、油漆脫落,燈罩破裂等現(xiàn)象。所有的燈

27、具應(yīng)有產(chǎn)品合格證。The lamp type and specification shall comply with the design requirement and national standard.The wire lamp must not reveal outside.The lamp accessory shall be fully equipped.Make sure no mechanical damage,deformation,paint off or crack on lamp cover.All lamp should have a quality certific

28、ate.質(zhì)量要求及安裝方法:Quality Requirement and Installing Method明裝燈具的安裝應(yīng)符合下列要求:Surface mounted lamps shall comply with the requirements as follows:同一室內(nèi)或同一場(chǎng)所成排安裝的燈具,其中心線偏差不應(yīng)大于5mm。The center line of lamp row which located in same room shall not have 5mm deviation.燈具固定應(yīng)牢固可靠。每個(gè)燈具固定用的螺釘或螺栓不應(yīng)少于2個(gè)。The lamp shall be

29、 fixed reliably.At least 2 bolts or screws shall be used for fixing lamp.公共場(chǎng)所用的應(yīng)急照明燈和疏散指示燈,應(yīng)有明顯的標(biāo)志,必需符合消防驗(yàn)收規(guī)范的驗(yàn)收要求。Emergency and escape illumination in public shall be clearly marked which need satisfy the acceptance requirement of firefighting.嵌入頂棚內(nèi)的裝飾燈具的安裝應(yīng)符合下列要求:Embedded lamp on the ceiling shall

30、 comply with requirements as follows:燈具應(yīng)固定在專設(shè)的框架上,導(dǎo)線不應(yīng)貼近燈具外殼,且燈盒內(nèi)應(yīng)留有余量,燈具的邊框應(yīng)緊貼在頂棚飾面上。Lamp shall be fixed on the special frame.Wire shall not be close to lamp shell.The lamp frame shall be close to the ceiling decoration.矩形燈具的邊框宜與頂棚面的裝飾直線平行,其偏差不應(yīng)大于5mm。The frame of rectangular lamp shall be parallel

31、to decoration line of ceiling .The deviation shall not exceed 5mm. 日光燈管組合的開啟式燈具,燈管排列應(yīng)整齊,其金屬或塑料的間隔片不應(yīng)扭曲等缺陷。The open type lamp consists of fluorescent tubes. The tubes arrangement shall be neat and its metal and plastic spacing piece shall not be distorted.照明裝置不得用作電路布線的轉(zhuǎn)接盒。The illumination device shal

32、l not be used as interconnecting device for circuit wiring.9. 開關(guān)插座安裝Switch Socket Installation開關(guān)插座安裝工藝流程Process安裝示意圖Installation DiagramClean up junction boxwiringInstall switch socketPower-on test工藝流程:ProcessClean upWiring Panel-mountPower-on test材料要求:Materials requirement:開關(guān)、插座應(yīng)有合格證、“ccc”認(rèn)證標(biāo)志和認(rèn)證證書

33、復(fù)印件。Switch socket with quality certificate,CCC certification mark and certificate copy.質(zhì)量要求及施工方法:Quality requirement and installation procedures.清理:用鏨子輕輕地將盒子內(nèi)殘存的灰塊剔掉,同時(shí)將其他雜物一并清出盒外,再用濕布將盒內(nèi)灰塵擦凈。Clean up:use chisel to slightly remove the dust inside box and clean up the box with a wet cloth.導(dǎo)線連接:Wire j

34、oining 開關(guān)接線:Switch wiring同一場(chǎng)所的開關(guān)切斷位置應(yīng)一致,且操作靈活,接點(diǎn)接觸可靠。 Cut-off position of switch should be consistent in the same place with flexible and reliable operation. 電器、燈具的相線必須經(jīng)開關(guān)控制。Phase line of appliance ,lamp shall be controlled by switch插座接線:Socket wiring單相兩孔插座、單相三孔插座,面對(duì)插座的右孔與相線連接,左孔與零線連接;面對(duì)插座的右孔與相線連接,左

35、孔與零線連接,接地或接零線接在上孔。插座的接地端子不與零線端子連接。About single phase,2 holes socket, the hole on the right connects with phrase line .The hole on the left connects with null line. About the single phase ,3holes socket,the hole on the right shall connect with phrase line ,The hole on the left connects with null line

36、. The upper hole connects with null line or earth wire.Earthing connector of socket will not connect to neutral connector接地或接零線在插座間嚴(yán)禁串聯(lián)連接。It is strictly prohibited to use series connection to connect earth wire or null wire on socket.面板安裝:Panel Installation安裝前準(zhǔn)備:先將

37、盒內(nèi)甩出的導(dǎo)線留出維修長(zhǎng)度,削去絕緣層,注意不要碰傷線芯。將導(dǎo)線按順時(shí)針方向盤繞在開關(guān)、插座對(duì)應(yīng)的接線柱上,然后旋緊壓頭,插接端子,將線芯直接插入接線孔內(nèi),再用頂絲將其壓緊。注意線芯不得外露。Pre-installation preparation: Reserve a certain length of wire for maintenance,remove the insulation ,do not damage wire core.coil the wire core around binding post in the clockwise direction,and then tig

38、hten the wire head,connecting terminal connector.Inserting the wire core into wiring hole,and tighten the connection by jack-screw .Do not expose the wire core.導(dǎo)線連接完后將開關(guān)、插座面板推入接線盒內(nèi)(如果盒子深度大于2.5cm時(shí),應(yīng)加裝套盒),對(duì)正盒眼,用機(jī)螺絲固定牢固。固定時(shí)要使面板端正,并與墻面嚴(yán)密、平齊。After connecting wire,Push socket and panel into junction box(i

39、f the junction box depth exceeds 2.5cm,a box cover shall be installed)and align the holes,fix them tightly with machine screw to make sure the panel upright , align with the wall .并列及成排安裝的面板高度應(yīng)一致,并列面板高低差不大于0.5mm,成排的高低差不大于1mm。The panels installed parallel or in rows shall have the same height.High di

40、fference of parallel panels shall not exceed 0.5mm and high difference of panels in rows shall not exceed 1mm.同一室內(nèi)安裝的面板高低差不應(yīng)大于4mm。High difference between panels shall not exceed 4mm in the same room.并列安裝獨(dú)立安裝面板的垂直允許偏差不大于0.5mm。The vertical allowable deviation can not exceed 0.5mm10防雷接地、保護(hù)接地系統(tǒng) Lightnin

41、g protection and safety ground system引下線安裝避雷帶安裝接地電阻測(cè)試接地裝置工藝流程:Process:Grounding Device - Downlead Installation-Lightning Protection Installation -Grounding Resistance Test本建筑防雷接地與強(qiáng)、弱電接地等共用接地裝置,要求接地電阻不大于0.5。如若不能滿足要求,應(yīng)增打接地極 ,直至接地電阻符合要求,同時(shí)作好測(cè)試記錄報(bào)監(jiān)理、甲方、防雷檢測(cè)所備案。The lightning protection grounding of this

42、building shares the same grounding system with strong,weak current grounding .According to requirement, the grounding resistance shall not exceed 0.5.If it cant satisfied the requirement ,the grounding electrode shall be increased and the test record shall be made and submitted to supervisor ,owner

43、.接地裝置安裝Grounding System Installation 利用結(jié)構(gòu)基礎(chǔ)梁、底板內(nèi)兩根不小于16主筋焊接成網(wǎng)狀作為接地裝置。Making use of 2 main steel bars inside structure foundation beam and base plate which size is not less than 16 ,and welded into a mesh as grounding system. 避雷引下線Lightning Protection Downlead利用結(jié)構(gòu)柱或墻內(nèi)不小于10的豎向主筋貫通焊接,上端升出女兒墻與避雷帶焊接,下端與接

44、地系統(tǒng)焊接。焊接時(shí)雙面施焊,要求焊縫飽滿,不得有夾渣咬肉等缺陷,焊接后清除干凈藥皮。其做法如下:Making use of steel bars inside structural columns and walls which size is not less than 10,and welding with main bars.The upper end of steel bars which spread out of parapet shall be welded with lightning protection .The lower end shall be welded with

45、 grounding system.While welding,it requires double-sided welding,and welding seam integrity without serious weld defects .After welding,clean the surface . as follows:由于結(jié)構(gòu)柱內(nèi)主筋采用不小于10鋼筋,所以避雷引下線利用結(jié)構(gòu)柱內(nèi)兩根對(duì)角主筋或鋼結(jié)構(gòu)鋼柱引下。本工程地下部分共設(shè)17處避雷引下點(diǎn),地上部分共設(shè)48處避雷引下點(diǎn)。Due to the size of main steel bars inside column is no

46、t less than 10. So the lightning protection downlead adopts 2 main steel bars or column of steel structure as the downlead.There are 17 lightning protection downlead on the underground part of this project and 48 lightning protection downlead above the underground part.柱內(nèi)兩根對(duì)角主筋在每層用10圓鋼連接,并用黃色油漆做好標(biāo)記,

47、以便檢查和引出。在柱子上端預(yù)埋100X100X8的鍍鋅鋼板,用于柱子內(nèi)主鋼筋與屋頂避雷網(wǎng)連接的轉(zhuǎn)換。On each floor ,adopting 10 round steel bar to connect with diagonal main steel bars inside column and mark the steel bar with yellow paint for easy check and bring it out.Embed 100X100X8 galvanized steel plate in the top of column which used for the

48、connection between main steel bars inside column and lightning protection net on the roof.另外在外墻室外地坪0.5米處留4處防雷測(cè)試點(diǎn),防雷測(cè)試點(diǎn)處用-40X4鍍鋅扁鋼與用做引下線的柱內(nèi)主筋或鋼柱焊接后引出,焊接長(zhǎng)度不小于100mm,在防雷測(cè)試點(diǎn)處預(yù)留300mmX200mmX120mm木盒,木盒開口面與混凝土表面一平。· Besides , 4 lightning protection test places shall be reserved outside 0.5 meters from e

49、xternal wall.Welding -40X4 galvanized flat steel with main steel bar inside column together and leading it out.· Welding length shall not be less 100mm.Reserve a 300mmX200mmX120mm wooden box at the protection test place. The opening of wooden box shall be parallel with concrete surface. 根據(jù)外墻裝飾情

50、況從預(yù)留木盒引出,設(shè)置測(cè)試點(diǎn),以供測(cè)試。測(cè)試點(diǎn)裝飾面板均應(yīng)刷白色底漆后以黑色接地符號(hào)。According to the decoration situation of external wall,the steel bar come out from wooden box. Set test places and brushed the test places and decoration panel into white color and then mark the black symbols on it.變電所接地Substation Grounding在變電所預(yù)留鍍鋅扁鋼,引出至室外輔

51、助接地裝置鍍鋅扁鋼焊接連通,焊接長(zhǎng)度為扁鋼寬度的兩倍,且三面施焊,焊縫清理干凈。各電氣豎井、各電梯井道、電梯機(jī)房、消防控制室、各弱電機(jī)房、弱電設(shè)備間、衛(wèi)生間、設(shè)備機(jī)房、等處預(yù)留100X100X10mm鍍鋅鋼板或接地線盒。In substation, reserved galvanized flat steel and lead it to outdoor weld with galvanized flat steel of auxiliary grounding device .The welding length is two times of the width of the flat s

52、teel, with three sides welding. Weld seam is clean. Reserve a 100X100X10mm galvanized steel plate or grounding box in every electric shaft, lift shaft, elevator room, fire control room, weak current machine room, weak current equipment room, bathroom ,equipment room and so on鍍鋅鋼板通過12鍍鋅圓鋼與建筑物接地裝置焊接連通

53、,焊接長(zhǎng)度為100mm,且雙面施焊,焊縫清理干凈。接地干線或等電位線(40X4鍍鋅扁鋼)從此引出。· Using 12 galvanized round steel bar ,connect galvanized steel plate with grounding system of the building by welding.Welding length is 100 mm, with double sided weld .The weld seam is clean. Grounding line and equipotential line(40X4 galva

54、nized flat steel) come out from there.變電所內(nèi)的接地線采用25X4熱鍍鋅扁鋼,從預(yù)留的40X4鍍鋅扁鋼處引出,沿變電所周圈安裝,距室內(nèi)地面300mm,與墻壁間的間隙為15mm。支持卡子間距為1米,轉(zhuǎn)角處兩側(cè)支持卡子到轉(zhuǎn)角處間距為300mm。接地線過門處,埋地穿DN40鋼管。室內(nèi)設(shè)5處臨時(shí)接地卡子,采用銅質(zhì)元寶螺絲M10。25X4熱鍍鋅扁鋼接地線與變壓器基礎(chǔ)、變壓器中性點(diǎn)、配電柜基礎(chǔ)和配電柜外殼作可靠連接。明敷的接地線表面應(yīng)涂以100mm寬度相等的綠色漆和黃色漆相間的條紋,做到標(biāo)志明顯。Adopting 25X4 hot galvanized flat st

55、eel for substation grounding ,which coming out from reserved 40X4 galvanized flat steel.Installed around substation,300mm from indoor ground.The gap with wall between walls is 15mm.The spacing between support clips is 1 m.The distance between support clips on the two sides of corner and the corner i

56、s 300mm.There embed DN40 steel pipe at the place where the ground wire go through the door.Set up 5 places inside room 在電梯機(jī)房、消防控制中心、各弱電機(jī)房、設(shè)暗裝接地端子箱,接地端子箱安裝高度為:0.5米。接地端子箱通過12鍍鋅圓鋼與建筑物接地裝置焊接連通,室內(nèi)各接地點(diǎn)的接地線從與接地干線相連的接地端子箱引出,使用BV16mm2黃綠導(dǎo)線穿PVC25管,沿墻內(nèi)、地面暗敷到接地端子箱。強(qiáng)電井、弱電井、電梯井道、各配電間內(nèi)預(yù)留一塊100X100X10熱鍍鋅鋼板,再用40X4熱鍍扁鋼沿電井垂直明敷。垂直支持件間距1.5米。明敷的接地線表面應(yīng)涂以100mm寬度相等的綠色漆和黃色漆相間的條紋,做到標(biāo)志明顯。Reserve a 100X100X10 hot galvanized steel plate in strong current shaft ,weak current shaft,elevator room,substation room and surface laying 40X4 hot galvanized

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論